Professional Documents
Culture Documents
Bailan Integrated School
Bailan Integrated School
Bailan Integrated School
DRRM MOVs
Table 36 Result of Disaster Incidences
Result of Disaster Incidences/Emergencies
BOX 28 Enabling Environment
Part I DRRM, CCAM and Peace Building Policies
1.School has adapted/localized existing policies relating to DRRM, CCAM and Peace Building
DO 82 s. 2010 Reiteration of CCA-DRR at the School
Level
BOX 28 Enabling Environment
Part I DRRM, CCAM and Peace Building Policies
1.School has adapted/localized existing policies relating to DRRM, CCAM and Peace Building
DO 83 s. 2011 Disaster Preparedness in School
BOX 28 Enabling Environment
Part I DRRM, CCAM and Peace Building Policies
1.School has adapted/localized existing policies relating to DRRM, CCAM and Peace Building
DO 43 s. 2012 Guidelines on the Implementation of EO 66
(Suspension of Classes)
Part I DRRM, CCAM and Peace Building Policies
1.School has adapted/localized existing policies relating to DRRM, CCAM and Peace Building
1 Typhoon Preparedness Classes on going Listen to News >Instruct teachers to secure their books, IM’s and other school
Advisory forms
>SDRMMC must coordinate with BDRRMC and be ready for
instruction.
3 Presence Typhoon Signal Classes are suspended Bell rings for 1 >Classes are suspended and advise to stay home to listen to news
Number 2 minute advisory
>Assigned PTA Officers must facilitate peace and order among the
evacuees
>Evacuees remain in safe holding area until Typhoon ends.
BOX 30 Pillar 2 Disaster Risk Management
Part I School Level Risk Assessment, Plans and Partnership
7.School Contingency Plan has the following:
Evacuation Plan
BOX 30 Pillar 2 Disaster Risk Management
Part I School Level Risk Assessment, Plans and Partnership
7.School Contingency Plan has the following:
Established Tracking System of Learners
BOX 30 Pillar 2 Disaster Risk Management
Part I School Level Risk Assessment, Plans and Partnership
7.School Contingency Plan has the following:
Pre Identified spaces for putting up of TLS and WASH Facilities
BOX 30 Pillar 2 Disaster Risk Management
Part I School Level Risk Assessment, Plans and Partnership
7.School Contingency Plan has the following:
Pre-identified spaces for evacuation center
BOX 30 Pillar 2 Disaster Risk Management
Part I School Level Risk Assessment, Plans and Partnership
7.School Contingency Plan has the following:
List of available safety and emergency supplies & equipment
BOX 30 Pillar 2 Disaster Risk Management
Part I School Level Risk Assessment, Plans and Partnership
7.School Contingency Plan has the following:
List of Partners to be mobilized in the event of
Disaster/Emergency
BOX 30 Pillar 2 Disaster Risk Management
Part I School Level Risk Assessment, Plans and Partnership
7.School Contingency Plan has the following:
Established DRRM Team with defined roles & responsibilities
BOX 30 Pillar 2 Disaster Risk Management
Part I School Level Risk Assessment, Plans and Partnership
7.School Contingency Plan has the following: 7b COVID-19 Considerations
Health and Safety Protocol
BOX 30 Pillar 2 Disaster Risk Management
Part I School Level Risk Assessment, Plans and Partnership
7.School Contingency Plan has the following: 7b COVID-19 Considerations
List of Available Personal protective Equipment (PPE)
BOX 30 Pillar 2 Disaster Risk Management
Part I School Level Risk Assessment, Plans and Partnership
8.School Contingency Plan is conducted with the following: Personnel
BOX 30 Pillar 2PLAN
10. COMMUNICATION Disaster Risk Management
Part I School
RIZAL Level Risk
ELEMENTARY Assessment,
SCHOOL Plans and
COMMUNICATION Partnership
PLAN
13.School has developed and implemented a DRRM Communication Plan
JOLLY E. BATUIGAS
Elem. School Principal-I
Contact # 09996442518
P U P I L S
BOX 30 Pillar 2 Disaster Risk Management
Part I School Level Risk Assessment, Plans and Partnership
15.School has participated in the different DRRM, CCAM & Peace Building
activities
BOX 30 Pillar 2 Disaster Risk Management
Part 2 Disaster Preparedness
1. School has conducted Brigada Eskwela to ensure school safety
BOX 30 Pillar 2 Disaster Risk Management
Part 2 Disaster Preparedness
2. School has a functional early warning system to inform
learners and personnel of natural hazard
BOX 30 Pillar 2 Disaster Risk Management
Part 2 Disaster Preparedness
3.School is provided with safety and emergency supplies and
equipment
BOX 30 Pillar 2 Disaster Risk Management
Part 2 Disaster Preparedness
4.Number of safety and emergency, response and rescue
supplies
BOX 30 Pillar 2 Disaster Risk Management
Part 3a Disaster Response
1.School conducted Brigada Eskwela in the aftermath Disaster
BOX 30 Pillar 2 Disaster Risk Management
Part 3a Disaster Response
2.Number of partners mobilized to support the school buildings
programs
BOX 30 Pillar 2 Disaster Risk Management
Part 3a Disaster Response
3.School Submitted Rapid Assessment of Damage Report (RADAR)
to the DRRMS Central Office
BOX 31 Pillar 3 Risk Reduction and Resilience
Education
Part 1 Curriculum Integration
3.School teaches DRRM and CCAM related concepts
BOX 31 Pillar 3 Risk Reduction and Resilience Education
Part 2 Information, Education and Communication (IEC) and Advocacy
1 & 2.School has DRRM CCAM & Peace Building Corners with updated IEC
Materials posted in it