Professional Documents
Culture Documents
Chemical Cleaning Execution O2 Line - Draft
Chemical Cleaning Execution O2 Line - Draft
@ptwijayakarya 1
CHEMICAL CLEANING EXECUTION
Data:
Pipe Diameter 6.00 Inch 4.00 Inch 1.00 Inch Pipe Material
0.15 m 0.10 m 0.03 m
Pipe Length 75,189.00 mm 17,611.00 mm 80,807.00 mm SMLS, SCH 10S, ASTM A312 Gr TP304L BW, STAINLESS
75.19 m 17.61 m 80.81 m
Volume 1.37 m3 0.14 m3 1.47 m3
@ptwijayakarya 2
Water Flushing
Manual Wiping
and Degreasing
Water flushing
Compressed Air
(or Nitrogen)
Purge
Chemical used: Detergent ??
Cleaning duration: ??
Manpower: ??
Cost: ??