Welcome

to
Sonargaon Steel Fabricate Ltd. (SSFL)
a concern of
Meghna Group of Industries Ltd. (MGI)
Vission,Mission& values
MGI-SSFL Health,Safety,Environment
& Quality Policy :
PEB Factory of SSFL
Smoke in Designated Not going out Public Toilet
Areas Only
during Training

Drinking Station

Emergency Exits Phone Off /


Silent Mode

Walk quickly to
Assembly point
In case of emergency during the training, please evacuate Training
NOTE Center and move to the Assembly Point with Trainer’s instruction.
5
Emergency Equipment

Water drum and Bucket Fire extinguisher & Hose Reel SCBA

Fire Truck Fire Training Fire Pump


Health, Safety& Environment :
We Maintain
1. Initial Safety Induction Training for every employees before engaged to works.
2. Everyday morning Conducted Activities base Risk Assessment(HIRA_ABRA)
3. Everyday site inspection /Observation and Recommendation if found-USA&USC
4. Unit wise safety Audit-weekly-Monthly of All SSFL Business
5. TNA Base Training Arranged.
6. Daily Floor Visit
7. Daily Housekeeping& Weekly Mass Housekeeping Program.
We provide to our workers
8. In-House Medical Service
9. Training on Environment Health & Safety
10. Training on Safe Chemical handling Procedure.
11. Training on Fire Safety & Awareness / Fire Drill
12. Training on Safe Overhead Crane Operation.
13. Training on SOP Lifting and Rigging
14. Weekly-Bi-weekly & Monthly Inspection all machines ,Tools and tackles etc.
Regular Temperature checking before entrance workplace During-Covid-19
:

Health Check-up by Doctor


Isolation ward Facilities has Of SSFL During Mass COVID-19:

Health Check-up by Doctor


SSFL Regular activity base Risk assessment has Regular Safety brief
Been conducted for Workforces: Conducted
SSFL safety precaution for Workforces&
Regular Safety brief

Sanitize thyself to prevent


Covid-19
Operational Safety: Training
SSFL safety precaution for Workforces:

Fire Fighting & Rescue Training First Aid Training


SSFL- Fire Fighting & Rescue Training

First Aid Training


SSFL Organogram Hierarchy
SSFL Flow Diagram of Fabrication:
Fabrication Procedure:
Fabrication Steps:
11. Backing Strip Inspection- Visually checked for root gap to start welding
12. Welding- Types of welding as below:
a) SMAW (Shield metal arc welding) process
b) MIG & MAG process
c) FCAW process
d) SAW process
13. Inspection- a) Visual Inspection
b) Dimensional Inspection
c) Penetrant Testing (PT)
d) Magnetic Particle Testing (MPT)
e) Ultrasonic Testing (UT)
14. Grinding
15. Shot Blasting- For surface preparation
16. Painting
17. Packing & Delivery
Fabrication Procedure:
Fabrication Steps:

1. Raw material handling to production floor with maintaining safety


2. Cutting Plan- This procedure shall be prepared before commencement of
fabrication work
3. Marking- Carried out as per approved cutting plans
4. Cutting- a) Shearing
b) Flame cutting
c) Semi auto gas cutting
d) Edge beveling
5. Punching & Drilling- Done by CNC drill, Radial drill, Magnetic drill and manually
operated machine.
6. Notches-After ends of all joints, beams & girders shall be cut
7. Assembly-In this part, groove weld shall be brought into correct alignment.
8. Edge Preparation
9. Fit-Up Assembly
Quality Control Process:
Quality Control Steps:
SSFL believes uncompromised quality in their product. In this process, SSFL follow few st
Fit-Up Inspection- Plate thickness, Bevel cut, Joint preparation, Dimensional check
Weld Preparation- In this stage, duties of welding inspector are
Before Welding During Welding After Welding

√ Pre Heating (Method and Control)


» Safety: Legislation and safe √ In Process distortion control (Balance or
working practices. Sequence welding )
» Marking out preparation & set √ Consumable Control. ( Correct baking & Storage
√ Visual Inspection
up : prior to use)
√ Non destructive Testing
√ Root Face √ Welding Process (Related parameters i.e
√ Submission of all inspection
√ Root Gap Volts/amps. Gas flow rate )
reports to QC department .
√ Distortion Control √ Welding Run sequence and inter-pass cleaning
√ Pre-heat prior to tack welding √ Minimum/ Maximum inter-pass temperature
if applicable √ Full Compliance with all elements given on the
WPS.
Quality Control Process:
Common methods used in NDT are:
1. Ultrasonic Test (UT)
2. Liquid penetrate
3. Visual Testing

EPOCH 650 Ultrasonic Flaw Detector

Wet Film Coating Thickness Gauge: SSFL is using WFT-


450 model Wet film thickness gauge. This is used to
measure coating thickness of gauge.
This wet film gauge can measure from 25 micron to
2000 micron.

WFT Film Thickness Gauge


Quality Control Process:
Dry Film Coating Thickness Gauge: SSFL
is using TIME 2605 to measure dry film
thickness of paint

Technical Specification :
 Probe – F1.5
Working principal -Magnetic Induction .
Measuring Range – 0- 1500 microns
Minimum Area diameter – Φ7 mm Dry Film Thickness Gauge
Printing function .
Quality Control Process:
Equipment using in Quality Control

Micro Meter Screw Gauge

Welding Gauge

Digital Vernier Caliper


Quality Control Process:
Surface Preparation: SSFL using Shot Blasting machine for surface preparation

H beam size-1000×2000mm
Length of the work-
piece=12000mm
Shot blasting
capacity=8*250kg/min,
2950r/min (meet SA2.5
Ra15-50 processing standard)
Quality Control Process:
Surface Preparation: SSFL using Shot Blasting machine for surface preparation

Upcoming
Shot blasting
capacity=16×280kg/min
400-2500mm/min
(meet SA2.5 processing standard)
H beam size-2500×3500mm
Length of the work-
piece=16000mm
Quality Control Process:
Painting: SSFL is using Graco EH230DI
model heavy duty airless paint machine
Specification Materials which can Spray
Max. Tip size : Paint –Plaster -0.39”-.047” High Volume Solid Marine Coating
Flow-L/Min: 6.4 / GPM: 1.7 Epoxy Paint
Max. Pressure : 3300 PSI /230 Bar Fire Proof Paints
Motor Rating : 2.2 KW / 3 HP Heat Resistant Paint
Enamel Paint , Oil Base Paint.

Duties of Paint Inspector:


Before Paint During Paint After Paint Airless Spray Painting Machine
 Surface preparation – Measuring WFT Measuring DFT.
Rust , Dust, Grease /Oil . Controlling Paint Finding paint defect &
Metal Surface Temp. Defect . repair
Ambient Temp. To maintain uniform of Submission of all
Surface Preparation paint surface. inspection reports to QC
Grade Check . department .
Quality Control Process:

Paint Shop
Quality Control Process:
Mechanical Testing:
1. Tensile Strength
2. Hardness Test
3. Toughness
4. Ductility

600KN Computer Control


Electro – Hydraulic servo
Universal Testing Machine

HBRV-187.5 Brinell, CSL-Y Impact Specimen


Rockwell and Vickers, Gap Hydraulic Broaching
hardness Tester. Machine
Quality Control Process:

DX-300 Manual Tensile


JB-300B Specimen Gauge
Semi- Automatic Impact Length Meter
Testing Machine
CDW-60 Impact Test
Low Temperature
Meter
Quality Control Process:
Sample format of Quality control process
Sonargaon Steel Fabricate Ltd
Fabricated Beam Dimensional Inspection Report
Client Name : Meghna Noodles and Biscuit Factory Ltd. Report No : SSFL/ QC/MNB/DIR-01
Project Name : Meghna Noodles and Biscuit Factory Ltd. Project Location:
MIEZ
Length / Width
Thickness (T) (Tolerance ±0.8/-0.3 ) Squareness Tolerance ±1.5 E1.5
Tolerance W±2 L±4
Position Plate Insp. ID
Squar- Camber Length Width Position Position Corrective
SL No Member ID QTY Fitter ID of Hole Thick. Remarks Sign.&
eness Reading (mm) (mm) of Hole of Fittings Action
Gap (mm) Date
1 C104 1 32342 3 7 15922 450 ok ok ok F30,W16 Accept
2 C107-1 1 32461 5 2 15922 450 ok ok ok F30,W16 Accept
3 C107-2 1 20024 2 3 15922 450 ok ok ok F30,W16 Accept
4 C121 1 21507 3 7 15907-3 550 ok ok ok F40,W30 Accept
5 C123-1 1 21506 5 2 15907 550 ok rep. ok F40,W30 Rep.then ok St. missing
6 C123-2 1 32489 2 3 15907 550 ok ok ok F40,W30 Accept
7 C123-3 1 35923 4 2 15907-3 550 ok ok ok F40,W30 Accept
8 C123-4 1 36642 6 3 15907 550 ok ok ok F40,W30 Accept
9 C123-5 1 34200 4 4 15907 550 rep ok ok F40,W30 Rep.then ok 20mm dis.
10 C123-6 1 38080 6 2 15907+3 550 ok ok ok F40,W30 Accept
11 C123-7 1 38799 5 6 15907 550 ok ok ok F40,W30 Accept
12 C124-1 1 39518 4 4 15907 550 ok ok ok F40,W30 Accept
Erection Process:
SSFL Follows high standard erection procedure with precise quality and safety. Steps are:
1. Material Unloading at site For Anchor Bolt setting Following
2. Anchor Bolt installation with approved design & drawing. Dimension must be follow-

A – Steel line to out bolt position


B – Diagonal Distance between Bolts.
C – Anchor Bolt Center to Center
distance.
D – Column grid center to center
3. Steel Framing- In this stage SSFL follow below steps: distance.
a)Column erection E – Distance Between steel lines levels
of foundations anchor bolt.
b)Roof Rafter connection on the ground
c)Plumbing & Squaring
d)Complete farming
e)Roof sheeting
f)Insulation installation procedure
g)Side wall sheeting
Erection Process:

Plumbing & Squaring

Column erection Roof rafter connection


Erection Process:
Safety Procedure during erection:
1. General Instruction: Protection to workers and public. Using safety signs &
barricades. Erection should not take place when high winds, Rain or dew, Poor
visibility
2. Lifting & Rigging: Column, Beam or any member to be lifted by crane and shall be
tied with tag line or nylon rope or both ends before lifting.
3. Fixation of Structure
4. Safety equipment: a) Safety harness
b) Safety helmet
c) Safety shoes
d) Safety goggles
e) Life line for hooking safety harness
f) Short belt for hooking safety harness
5. Housekeeping: Materials must be stacked safely. Platforms, gangways, floors and
other places must not be obstructed by loose materials.
Erection Process: S/No
1
Items
Power Impact Wrench
Qty
20
Description
With assorted impact sockets 12mm to 36mm
2 Electric Drill Machine 10 Heavy Duty, 12mm
3 Magnetic Drill Machine 11 Heavy Duty, upto 30 mm
4 Electric Screw Gun 50 Heavy Duty with hex sockets
5 Electric Power Saw 2 Heavy Duty with metal & carbide blades

Tools & Equipment for Erection:


6 Electric Extension Cords As Req. Sufficient for maximum number of tools used at once
7 Electric Arc Welding machine 30 With leads and extra welding head
8 MIG welding machine 5 with gas cylinders
9 Gas Cutting Outfit As Req. With hose, gauges, torch & replacement heads

10 Socket Wrenches 20 Sets 12mm drive with assorted sockets and ratchet drive
11 Grinding Machine 50 4 inch, 7 inch
12 Box End Wrenches As Req. Sets - assorted sizes 12mm to 36mm
13 Open End Wrenches As Req. Sets - assorted sizes 12mm to 36mm
14 Vice Grip Pliers As Req.
15 Hammers As Req. Shop, Sledge, Rubber
16 Sheet Metal Cutters As Req. Left, Right, Straight
17 Drift Pins As Req. Heavy Duty
18 Hack Saw As Req. With assorted blades
19 Chokers As Req. 3/8”
20 Cable Clamps As Req. Various Sizes
21 Slings As Req. With Clevises
22 Steel Cable As Req. With Turnbuckles
23 Work Platform As Req. 6m, Steel or Plywood reinforced
24 Extension Ladders As Req. 6m
Erection Process: S/No
25
Items
Safety Belts with shock absorber
Qty
100 Sufficient for Crew
Description

26 Safety Helmets 100 Sufficient for Crew


27 Goggles As Req. For Power cutting
28 Goggles As Req. For burning equipment

Tools & Equipment for Erection:


29 Welding Hood As Req. With additional lens for electric welding
30 Man Busket 5 For lifting man at height
31 Steel Measuring Tape As Req. 15m and 30m
32 Speed Level As Req. 1.2m, 2m
33 Framing & T-Square As Req.
34 Transit & Level Rod As Req.
35 Chalk Line As Req. Yarn
36 Nylon Line As Req.
37 Manila Rope As Req. ea 3/8”, ½”
38 Shear stud Machine with Gun 3 For welding shear bolt
39 Crane Lifting Belt As Req. 3T, 5T, 10T, 15T
40 Impect Wrench 12 600 KN capacity
41 Truck Mounted Crane 2 10 Ton capacity
42 Brooms As Req.
43 Dust Pans As Req.
45 Mobile Crane 9 Capacity depends on scope of work
46 Forklift 2 Capacity depends on scope of work
47 Telescopic Handler As Req.
48 Scissor Lift 1 12 meter height
Erection Process: Top
Management
Organogram of Erection Team:

Project Manager

Technical
Office Staff
Staff

Site HES Drawing


Site Store HR/Admin Site Project
Accounts Officer/ Draftsman/
officer officer Engineers Coordinator
officer Team Detailer
Site
Supervisor/
Expert

Foreman/Skill
workers

Technicians/
Construction team
Machineries & Equipment of SSFL:

Automatic Gantry Welding Machine


CNC Flame cutting machine
Finished
Effective Grade Rotation Length
Effective cutting Quick Back Product
cutting
length Speed Mild Steel
thickness I Beam/H Automati 2000-
Beam High Tensile c 15000mm
6mm-100mm Up to 13000mm 12000mm/min Steel
Machineries & Equipment of SSFL:

Straightening Machine
Plate Shearing Machine
Flange Width 200-800mm
Flange Thickness 8-60mm Effective Cutting Thickness Effective Cutting Length
Web Height 300-1500mm Up to 25mm Up to 6000mm
Web Thickness 8-40mm
Length 4000-15000mm
Machineries & Equipment of SSFL:

Radial Drill Machine Shot Blasting Machine


Model Z 3080x25 Flange width 100mm-700mm
Max Drilling Size 100mm Flange Thickness Any thickness
Web width 50mm-1700mm
Speed 16-2000 RPM
Web Thickness Any thickness
Machineries & Equipment of SSFL:

Assembly Machine 3 in 1 fully Automatic Horizontal Assembly &


Welding Machine
Beam Height 200-2000mm
Web Thickness 6-12mm
Length 2000-16000mm
Web Height 300-1500mm
Beam Length 4000-15000mm
Machineries & Equipment of SSFL:

Overhead Crane of SSFL: Single Girder OH Crane 10MT-26 nos


Single Girder OH Crane 12.5MT-2 nos
Double Girder OH Crane 18MT-2 nos
Machineries & Equipment of SSFL:

SI No. Construction Equipment Description Capacity Qty

1 Truck Mounted Crane 10 MT 2


2 Mobile Crane 16 MT 1
3 Mobile Crane 25 MT 2
4 Tower Crane 10 MT 2
5 Mobile Crane 60 MT 2
6 Mobile Crane 80 MT 1
7 Mobile Crane 150 MT 1
8 Hydra Crane 10 MT 1
SL
M/C Name Model Capacity Total Qty
No.
1 Shearing Machine AHGM 6025 25mm for MS & 15mm for SS 2
2 Horizontal Assembly & Welding Machine WE-0525.03-00 Height: 300-1500mm, Length: 4000-15000mm 2
3 Beam Assembly Machine HGS-200 II Height: 200-1800mm, Length: 4000-20000mm 3
Width 200-800mm , Height 200-1800mm ,Length 2000-
Machineries & Equipment of
4 H Beam Gantry Automatic Saw Machine MZGB-4000 4
15000 mm
H Beam Flange Hydraulic Straightening
5 YJ 60B Flange Width 200-800mm, Flange thickness 8-600m 4
Machine
Cutting Thickness: 6-100mm; Max Speed:
6 CNC Flame Cutting Machine GS/Z4000 2
12000mm/min
7 Hydraulic Ironworker IW-165SD Force:165Ton; Dia:37x32 7
8 Radial Drill Machine Z3080x25 Drilling Size: 100mm 2
9 CNC Drill Machine ZK5550 Thickness: 80mm & Size: 2000x1500mm 2
10 Magnet Drill Machine YC-68/SK Drilling Size: 12-60mm 50
11 Shot Blasting Machine SM20170321 Flange Width: 100-700mm; Web Width: 50-1700mm 1
WC67K-
12 Hydraulic Press Brake 0.5-10mm of Q234B material 1
200Tx4000
13 Oxygen Plant FSM-80,KZM-300 1300nm3/h & 300nm3/h 2
SSFL:

14 Bar Bending Machine RB-40 12-70mm 1


15 Double Bubble Insulation Machine FY-Q150MS 40000 SFT/Day 1
16 Truck Mounted Crane DWD 615.69 10 Ton 2
17 Tower Crane SYT-250 Jib Length-75m, Load-12 Ton 4
18 Universal Radial Drill M/C Z3725-B Drilling Size: 35mm 6
Welding Electrode Plant
SL No. M/C Name Capacity Total Qty
1 Drawing Machine 6.0 MT/8H 1 set
2 Cutting Machine 1.5 MT/8H,(Total 6 MT) 4 pcs
3 Hydraulic powder mixer Machine 3.0 MT/8H 1 set
Machineries & Equipment of

4 Helix Powder Coating Machine 5 MT/8H 1 set


5 Automatic Chain type drying furnace 5 MT/8H 1 set
6 Auto weight Machine 5 MT/8H 1 set

7 Shrink packing Machine 7

Oxygen Plant
SL No. M/C Name Capacity Total Qty
1 Oxygen Plant 1300nm3/hr & 300nm3/hr 2 Nos

CO2 Plant
SL No. M/C Name Capacity Total Qty
1 CO2 Plant, Tank Size-10m3 Filling-40kg/min 1 Nos
SSFL:

Acetylene Plant
SL No. M/C Name Capacity Total Qty
1 Acetylene Plant 100 MT/Month 1 Nos
SL SL
No Name Of Machines Qty Unit No Name Of Machines Qty Unit
. .
1 Iron Punch Machine 7 Set EPOCH 650 Versatile and Rugged Flaw
20 1 Set
2 MIG Welding Machine 70 Set Detector
Machineries & Equipment of

3 Arc Welding Machine 86 Set 21 Transfer car 1 Set


4 RT 35 & WT 25 Wall Forming Machine 1 Set 22 Z Purlin Machine 1 Set
YX-29-200-1000 Roof Panel Bending / Curving 23 U Shape Profile Forming Machine 1 Set
5 1 Set
Forming Machine 24 New Roof Forming Machine 1 Set
6 Down Pipe Making Machine 1 Set 25 Aerial Work Platform 1 Set
7 DE 51 Decking Forming Machine 1 Set 26 C-Channel Machine 1 Set
8 Sheet Slitting Machine (.2-3.2MM ) 1 Set
9 Gutter Roll Forming MC 1 Set
10 Ridge Cap Roll Forming MC 1 Set
11 Gutter End Cap Pressing MC 1 Set
12 10/12.5 MT Single Girder Over Head Crane 29 Set
13 Manual Hydraulic Press 2 Set
14 DFT 2 Set
15 12 MT Hydra 1 Set
SSFL:

16 10 MT Forklift 3 Set
17 Lathe Machine 2 Set
18 Scissor Machine 3 Set
19 Capus machine 2 Set
Machine & Equipment:

Z Purlin Machine Roof/Wall Forming Machine

C Purlin Machine
Other Business Units of SSFL:
In addition to SSFL Pre-Engineered Building (PEB), SSFL is also operating its other two units very
effectively:
1. Welding Electrode & Wire
2. Gas Plant: a) Oxygen (O2) plant
b) CO2 plant
c) Acetylene plant & Forming ,piping Factory as well.
Welding Electrode & Wire: SSFL has welding electrode & wire factory named Fresh Electrode &
Wire. It is formed as subsidiary of SSFL under the flagship of Meghna Group of Industries (MGI) in
the year of 2019. We have products under different AWS grades like E 6012 & E 6013, E 7018 &
Hard 350R.
Our Products are:
1. Fresh Speed E-6012
2. Fresh Hi-Speed E-6012
3. Fresh Marine Gold E-6013
4. Fresh Super Arc E-6013
5. Fresh Super Weld E-6013
6. Fresh Master Marine E-6013
7. Fresh Solid Bond E-6013
8. Fresh Hard 350 R
9. Fresh FCAW Wire
10.Upcoming: E-7018, 650 B & SS Electrode
Other Business Units of SSFL:
Other Business Units of SSFL:
Shipbuilding Unit of MGI:
Logistic Support

Sl. No. Vehicle Type Quantity (Nos)

1 Ocean Going Vessel 12

2 Lighter Vessel 65

3 Barge 27

4 Covered Van/Truck 350

5 Bulk Carrier 100

Using SSFL manufactured welding


Electrode
SL Weight (MT) of SL Weight (MT) of
Project Project
No. Steel Structure No. Steel Structure

10 Printing and Packaging Factory 3574.00


1 7 Storied Biscuit & Noodles Factory 6880.00
6-Storied Meghna Ball Pen &
11 4390.00
2 Meghna Sugar Refinery Factory 3457.00 Stationary Factory

12 LPG Production Line 362.00


4 Storied Meghna Pulp & Paper
3 1210.00
Factory warehouse
Major Completed

13 SSFL, 2nd Unit 787.00


4 Factory Building of Sakata Inx BD Ltd. 255.00
14 4 storied condensed Milk Go-Down 450.00
5 Dockyard and Ship Building Shed 513.00
15 Ananda bazar Go-Down Shed-2 1400.00
Project:

6 TIC Australia 719.00


16 Ganganagar Godown Shed 264.00

7 Calcium Carbonate Building 541.00 Unique Cement Industries Ltd (Fresh


17 6028.00
Cement)

8 Sonargaon Seed Crushing Factory 4560.00 18 Spice Building 447.00

5 Storied Ganganaagr Oil Filling


9 Meghna Bulk Bag Industries Limited 2875.00 19 2000.00
Building
Major Completed Project:

Project Name: 7 storied Biscuit & Noodles Factory


Building Area: 564,000 sft
Floor Area: 82,000 sft
Building Height: 45.35 m
Total Weight: 6060 MT
Completion Time: 9 months
Major Completed Project:

Project Name: 6 storied Meghna Ball Pen & Stationary


Factory
Building Area: 373000 sft
Floor Area: 63,500 sft
Building Height: 42.40 m
Total Weight: 4390 MT
Completion Time: 6 months
Major Completed Project:

Project Name: Meghna Sugar Refinery Factory (2nd Unit)


Building Area: 197,000 sft
Floor Area: 49,000 sft
Building Height: 37.60 m
Total Weight: 3457 MT
Completion Time: 13 months
Major Completed Project:

Project Name: Sonargaon Seed Crushing Mill


Building Area: 278,000 sft
Floor Area: 43,000 sft
Building Height: 41.80 m
Total Weight: 4560 MT
Completion Time: 11 months
Major Completed Project

Project Name: 3 Storied Factory Building TIC-2.


Building Height: 32 Meter
Total Weight:
Completion Time:
Major Completed Project:

Project Name: Factory building of Sakata Inx BD


Ltd
Building Area: 37,500 sft
Building Height: 11.70 m
Total Weight: 255 MT
Completion Time: 4 months
Major Completed Project:

Project Name: 6 Nos Grain Storage Go-Down at Ananda Bazar, Sonargaon,


Narayanganj
Capacity each 60,000 MT
Each Go-down Area: 64,560 sft
Building Height: 35.00 m
Total Weight: 2800 MT
Major Completed Project:

Project Name: Unique Cement Industries (2nd Unit)


Building Height: 64.80 m
Total Weight: 6028 MT
Completion Time: 15 months
Major Completed Project:

Project Name: MEGHNA PVC LTD.


Building Height: 32 Meter
Total Weight:
Completion Time:
Major Completed Project:

Project Name: Meghna Pulp & Paper Factory


Building Area: 66,500 sft
Building Height: 27.60 m
Project Name: Calcium Carbonate Building Total Weight: 1210 MT
Building Area: 88,900 sft
Building Height: 25.20 m
Total Weight: 541 MT
Major Completed Project:

Project Name: 6 storied Meghna Bulk Bag Industries


Ltd.
Building Area: 83,500 sft
Building Height: 26.00 m
Major Completed Project:

Project Name: 15000 MT capacity tank Project Name: LPG Cylinder Manufacturing Factory
Dia: 26 m Building Area: 63,300 sft
Height: 31.00 m Building Height: 14.40 m
Total Weight: 160 MT Total Weight: 362 MT
Major Completed Project:

Project Name: Meghna Ceramic Factory


(Unit-1)
Building Area: 545,000 sft
Height: 32.00 m
Total Weight: 2650 MT
Major Complete Project:

Project Name: 6 storied factory building BEXIMCO Ltd.


Building Area: 660,000 sft
Height: 27.60 m
Total Weight: 4600 MT
Major Complete Project:

Project Name: Factory Building of Siegwerk BD


Ltd
Building Area: 26,500 sft
Building Height: 14.06 m
Total Weight: 171 MT
Major Complete Project:

Project Name: 6 storied Ceramic residential building


Building Area: 67,000 sft Project Name: Husky Building
Building Height: 26.00 m Building Area: 82,500 sft
Total Weight: 420 MT Height: 30.80 m
Total Weight: 1450 MT
SL Weight (MT) of SL Weight (MT) of
Project Project
No. Steel Structure No. Steel Structure

Major Ongoing Project: 1 Meghna Ceramic Factory-(Unit-2) 2438.00 7

Meghna Ceramic Raw Material Ware-


2 2650 .00 8
House..

3 Meghna Tissue Plant –Unit-2 1751.00 9

4 Jotun Bangladesh Ltd 276.00 10

Sun Pharmaceutical Industries Ltd.


5 155.00 11
(Sun Pharma)

6 Meghna Glass factory ltd 10491.00 12


Major Ongoing Project:

Project Name: Meghna Ceramic Factory-(Unit-2)


Building Area: 545,000 sft
Height: 30.00 m
Total Weight: 2438 MT
Major Ongoing Project:

Project Name: Meghna Ceramic Raw Material


Ware-House.
Building Area: 34,6000 sft
Height: 20.00 m
Total Weight: 2650 MT
Major Ongoing Project:

Project Name: Meghna Tissue Plant –Unit-2


Building Area: 56110 sft
Height: 35.00 m
Total Weight: 1751 MT
Major Complete Project:

Project Name: Jotun Bangladesh Ltd.


Building Area: 33,000 sft
Height: 12.60 m
Total Weight: 276 MT
Major Ongoing Project:

Project Name:
Sun Pharmaceutical Industries Ltd. (Sun Pharma)
Building Area: 66,000 sft
Height: 27.60 m
Total Weight: N/A
Major Ongoing Project:

Need
Need To
To ADD
ADD

Project Name: Meghna Glass factory ltd.


Area: 1030050 sft
Height: 9.95 m
Total Weight: 10491 MT
Certification:
Certification:
Certification:
Our Valued Clients:

BEXIMCO
Standard Group Sakata Inx BD Ltd OSJI-JV Ltd.

Samsung Amber Kraft Paper The Builder


C&T Siegwerk BD Ltd Ltd Engineers Associate
Ltd

TIC Australia NEPC Energypac Power Confidence Group


Generation