Equipment Productivity
Equipment Productivity
EQUIPMENT PRODUCTIVITY
q1
1. q = q1 x K
= 1,2 x 1,2
K = 1,2
= 1,44 m3
EQUIPMENT PRODUCTIVITY
Q = q x 3600/Cms x E
= 1,44 x 3600/16 x 83%
= 268,92 m3/Hour
MATERIAL PROPERTIES
Material WASTE TOP SOIL MU D Coal
Insitu Density 2.21 1.83 1.76 1.30
Swell Fa ctor 1.21 1.26 1.55 1.30
Loose Fa ctor 1.83 1.45 1.14 1.00
PA UA Eff WH
Prod Equipments 90.3% 63.4% 4944
N on- Prod Equipments 90.3% 63.4% 4944
Ht Prod'ty Q 2DT
Material Eq. Type Vs. C (m3) n. Bucket Lv Ev Lt (D/Lv) Dt (t1) Rt (D/Ev) Sp (t2) Ʃ t (Cmt) E (m3/hour) M (m3/hour)
Top Soil Hino 20 ton Loader 15,84 11 4,17 5,56 165 58 90 44 18 375 120% 107,81 2 215,62
EQUIPMENT PRODUCTIVITY ACTUAL TIME
Material Eq. Type q1 (m3) k Cms E Prod'ty Swell Prod'ty
Top Soil PC300SE-8M0 2,3 85% 21 83% 278,17 m3/hour 1,26 220,77 bcm/hour
Prod'ty
Material Eq. Type Vs. C (m3) n. Bucket Lv Ev Lt Ht (D/Lv) Dt (t1) Rt (D/Ev) Sp (t2) Ʃ t (Cmt) E Total
(m3/hour)
Top Soil Hino 20 ton Loader 15,3 15 4,17 5,56 58 157 135 125 46 521 0,83 87,75
181,05
Top Soil Hino 20 ton Loader 15,3 15 4,17 5,56 63 132 146 109 40 490 0,83 93,30