Sport Obermeyer

PRESENTED BY
Vedant Kadam 184
Jay Yadav 172
2.What operational changes do you recommend
to wally to improve performance?
Recommendation
Weighted average forecasting method can be used to increase forecasting accuracy.
Reduced lead time by developing supplier network.
Increasing the proximity between the supplier and manufacturing plant.
Provision of cross function training to Chinese workers.
Reduce lead time by searching manufactures for non standard zippers in China or Hong Kong as
non standard zipper from Japan has lead time of at least 90 days.
3. How should Obermeyer management think (both short
term and long term) about sourcing in Hong Kong or
China?
On long term perspective , the company can shift its manufacturing base to Hong Kong base on
below points:
Lead time reduction
Minimum order quantity
Increase in efficiency
No quota constraint in China
On short term perspective: