NOTIFCATION JOB ORDER

END USER Will check actual items, quantity Convert


(Vessel Crew) notification into
for repair and will provide FABRICATION
NOTIFICATION to EMD will EMD Job Order for
SECTION
inform End User to DR the actual approval of EMD
inspected quantity to EMD shop Sr Manager to be
forwarded to
fabrication section prepare
will forward reservation to
items for If material is
STOCKROOM withdraw
repair available
materials for
RESERVATION repair to be
If material is forwarded to
not available stockroom

Actual item (snap ring) must be kept inside


the warehouse.

STOCKROOM
Replenish item. Create PR.

prepare the
Once material (sleeve and roller) is already
GOODS ISSUANCE materials for
available. Create Notification to be forwarded
issuance
to EMD.

FABRICATION
SECTION

SNAP RING / RING PURSE PROCESS FLOW


Withdraw material
at stockroom

Check and receive


repaired snap ring Repaired SNAP
END USER from fabrication RING will be
(Vessel Crew) section. Do the
Prepare forwarded to EXECUTION
SOP of SAP STOCKROOM
reservation for
withdrawal of
Stockroom OF WORK
repaired snap ring
process to be able (use DR for turn
to issue the over)
repaired items to
the end user.