OEE Presentation - System A Tics
OEE Presentation - System A Tics
EFFECTIVENESS - OEE
A Tool to Drive
Manufacturing Competitiveness
OEE - A Tool to Drive Manufacturing Competitiveness
Meet Jim . . .
Jim is Operations Director for a fictitious,
soft drinks bottling plant.
Jim From two bottling lines,
the
plant ships
over 3M
Jim’s challenge (opportunity ?) :
units per annum.
Sales are up, margins are tight, and the capital budget is very limited !
Why does one of the lines run slower than the other ?
4
of
2
0
شرکت خدمات مهندسی ره آوردگستره شرق
OEE - A Tool to Drive Manufacturing Competitiveness
Why does one of the lines run slower than the other ?
5
of
2
0
شرکت خدمات مهندسی ره آوردگستره شرق
OEE - A Tool to Drive Manufacturing Competitiveness
8
of
2
0
شرکت خدمات مهندسی ره آوردگستره شرق
OEE - A Tool to Drive Manufacturing Competitiveness
10
of
2
0
شرکت خدمات مهندسی ره آوردگستره شرق
OEE - A Tool to Drive Manufacturing Competitiveness
Unscheduled
Unscheduled
Scheduled
ScheduledTime
Time Time
Time
Planned
Planned Changeovers
Changeovers
Planned
PlannedProduction
ProductionTime
Time Downtime
Downtime PM’s
PM’s
Unplanned
Unplanned Breakdowns
Breakdowns Availability
Availability
Uptime
Uptime Downtime
Downtime Waiting
Waiting AA
Speed
Speed Reduced
ReducedSpeed
Speed Performance
Performance
Net
NetOperating
OperatingTime
Time Loss
Loss Idling
Idling PP
Equivalent
Equivalent Yield
Yield Defects
Defects Quality
Quality
Operating
Operating
Time
Loss
Loss Rework
Rework QQ
Time
12
of
2
0
شرکت خدمات مهندسی ره آوردگستره شرق
OEE - A Tool to Drive Manufacturing Competitiveness
OEE = A * P * Q
Jim
Availability (A) = 50%
OEE
Performance (P) = 85% =
38.35%
Quality (Q) = 90%
14
of
2
0
شرکت خدمات مهندسی ره آوردگستره شرق
OEE - A Tool to Drive Manufacturing Competitiveness
MANUFACTURING OEE
FILLING Unaccounted
PACKAGING
Yield Loss
FILLING-1 Planned
PACKAGING – LINE 1 Downtime Unplanned
PACKAGING – LINE 2 Downtime Speed Loss
DOWNTIME ANALYSIS
48% 95% 93% 42%
16
of
2
0
شرکت خدمات مهندسی ره آوردگستره شرق
OEE - A Tool to Drive Manufacturing Competitiveness
17
of
2
0
شرکت خدمات مهندسی ره آوردگستره شرق
OEE - A Tool to Drive Manufacturing Competitiveness
In fact, rumour has it that Jim is in line for the next VP job !
19
of
2
0
شرکت خدمات مهندسی ره آوردگستره شرق
OEE - A Tool to Drive Manufacturing Competitiveness
Thank You