DESIGN REVIEW

FOR
PROPOSED LINK ROAD FROM JALAN JIWA MURNI
TO NANGA MERIT SUB DISTRICT OFFICE / KLINIK
KESIHATAN NANGA MERIT / PEKAN NANGA MERIT /
NANGA MERIT LONGHOUSES, KAPIT DISTRICT
INTRODUCTION

Nanga Merit Sub-District is a sub-district within Kapit Division where


there is administrative centre such as Nanga Merit Sub-District Office,
Klinik Kesihatan Nanga Merit, Pekan Nanga Merit and Pejabat
Pertanian Nanga Merit located. Nanga Merit Sub-District is inhabited
approximately by 10,000 number of population with thirty-seven (37)
longhouses and two (2) primary school.

2
Currently, there is no road connecting residents of Nanga Merit to Nanga
Merit Sub-District Office, Klinik Kesihatan Nanga Merit and Pekan Nanga
Merit. Now, the residents of Nanga Merit have only one alternative route to
access the public facilities, which is to use boat through the Batang Rajang
river.

3
PROJECT OBJECTIVES

1. Construct new JKR Standard R3 asphaltic concrete main road with length of
approximately 0.5 km and three (3) new JKR Standard R1 asphaltic
concrete spur road with length of approximately 0.3 km.
2. Drainage system and all the necessary road features.

4
Rigid Pavement

1. JKR Bahagian Kapit has written an official memo ref no.


PWD/R.130/Pt.1(11) dated 3rd August 2023 in requesting the road design for
this project to be using rigid pavement. Therefore, this is put up as an option
for the project.

5
PROJECT PARTICULARS
Project title Proposed Link Road From Jalan Jiwa Murni to
Nanga Merit Sub District Office / Klinik
Kesihatan Nanga Merit / Pekan Nanga Merit /
Nanga Merit Longhouses, Kapit District
Scope of work • Construction and completion of the 0.5km JKR
R3 (main road) and 0.3km JKR R1 (spur road)
• Construction of 2 nos precast box culvert.
• Construction of drainage system.
• Supply and installation of road furniture.
6

Division
Preliminary RM8.0mil
Cost Estimate
PROPOSED ALIGNMENT (Divisional Proposal)

7
CADASTRAL MAP

8
SOIL MAP

Podzols

The soil type for the project Red-Yellow


alignment is mainly skeletal soils Podzols
and red-yellow podzolic soil:
very shallow to moderately deep
loamy sands to clay: on
sedimentary, acid igneous and
metamorphic rocks steep and
mountainous land.

9
Soil Investigation Plan

● A site investigation plan


was minute to JKR Road
Branch and JKR Research
& Investigation Branch (ref
no :JKR/RJKS/800-
2/1/2JLd.1(84)) dated
05.04.2023.
SITE INVESTIGATION

● The field works commenced on 11th May


2023

● Scope of works :
(1) Deep boring (1 borehole)
(2) Mackintosh Probe Test (3 Nos)
(3) Hand Auger (3 Nos)

● SI works completed on 17th May 2023


● Full report was emailed on 24th May 2023

11
GEOMETRIC DESIGN CRITERIA
Geometric- Design
MAIN ROAD
Criteria
JKR ATJ 8/86 (Pindaan 2015) Design Adopted
Design Standard R3 R3
Terrain Flat Flat

Design Speed 70km/hr 70km/hr

Lane width 3.25m 3.25m


Shoulder width 2.5m 2.5m
Marginal strip width 0.25m 0.25m
Minimum reserve width 40m 40m
Maximum superelevation 0.10 0.10
Maximum grade (Desirable) 7% 7%
Maximum grade (%) 10% 10%
Crest Vertical Curve (K) 10 10
12
Sag Vertical Curve (K) 13 13
GEOMETRIC DESIGN CRITERIA
Geometric- Design
SPUR ROAD
Criteria
JKR ATJ 8/86 (Pindaan 2015) Design Adopted
Design Standard R1 R1
Terrain Flat Flat

Design Speed 20km/hr 20km/hr

Lane width 5.0m 5.0m


Shoulder width 1.5m 1.5m
Marginal strip width 0.00m 0.00m
Minimum reserve width 20m 20m
Maximum superelevation 0.10 0.10
Maximum grade (Desirable) 9% 9%
Maximum grade (%) 17% 17%
Crest Vertical Curve (K) 3 3
13
Sag Vertical Curve (K) 3 3
LONGITUDINAL PROFILE - MC00

14
LONGITUDINAL PROFILE - MC01

15
LONGITUDINAL PROFILE - MC02

16
LONGITUDINAL PROFILE - MC03

17
EARTHWORK ANALYSIS

18
TYPICAL CROSS SECTION (MAIN ROAD
R3)

19
TYPICAL CROSS SECTION (SPUR ROAD
R1)

20
PAVEMENT DESIGN

● Road Branch requested on ● Currently,


- R3 Road Flexible Pavement ; connecting to - No traffic data ; no access road
the existing Jalan Jiwa Murni gravel road - Pavement design is calculated based on
assumptions
● JKR Kapit Division requested on
- Rigid Pavement ● Refer to excel sheet

21
FLEXIBLE PAVEMENT STRUCTURE
DETAILS
(T3 Category)
50 mm Asphaltic Concrete Wearing Course (AC 14)
130 mm Binder Course (AC 28)
200 mm Road Base Course
200 mm Sub-Base Course

22
FLEXIBLE PAVEMENT STRUCTURE
DETAILS
(T1 Category)

50 mm Asphaltic Concrete Wearing


Course (AC 14)
150 mm Road Base Course
200 mm Sub-Base Course

23
RIGID PAVEMENT STRUCTURE
DETAILS (T1 Category)

150 mm RC Slab
Square Mesh A10
50 mm Lean Concrete

24
RIGID PAVEMENT STRUCTURE
DETAILS (T3 Category)

25
So…

Design Solution

● The geometry design comply to R3 standard.


● However, for pavement design, to propose

Option 1 : Flexible Pavement for T1 Category

Option 2 : Rigid Pavement for low volume road


CATCHMENT ANALYSIS

27
Drainage

● Earth Embankment Toe Drain


NEXT!

● Draft Preliminary Design


- To include design for RCED Proposal
(discuss with PAD)
- To include Result of SI Report
- Catchment analysis for new design
proposal

● 5th Reminder Letter to Technical


Branch on Survey Data
THANK YOU!