Fire Pump Churn Testing
Weekly Fire Pump Churn Test EAM Work Order
Amazon
PM Schedule FLS PM TASK (TITLE) TASK INSTRUCTIONS FREQUENCY Quarter Code PM Purpose (i.e. failure
(every # weeks) PERFORMED BY Performed reference controlled) Tech
Labor
Conduct weekly diesel fire pump inspection / test in accordance with NFPA-25 Site personnel if base
building techs onsite. 60 min per
FLS weekly DIESEL and/or ELECTRIC fire pump 1) Verify if EPO Interlock is tied to system NFPA 25
FLS.WS.PUMP.01 1 (unless prohibited by ALL QUARTERS Verify Fire Pump operation fire pump
inspection / churn test 2) Verify that EPO has been disable at both the FACP and the MDF room FACU before any local regulation - if so, 8.3.1.1
testing takes place churn test
vendor)
"Conduct weekly diesel fire pump inspection / test in accordance with NFPA-25,
8.3.1.1
1) Verify if EPO Interlock is tied to system
2) Verify that EPO has been disable at both the FACP and
the MDF room FACP before any testing takes place“
The weekly churn test should be performed by site RME personnel unless:
1) The site has no RME personnel
2) Local regulation requires an FLS vendor to perform
3) The Landlord is responsible for fire pump maintenance
Amazon Confidential
Fire Pump Churn Testing
Fire Alarm Test and Disable Mode
PROCEDURE:
1.Locate the outside contact number for Fire Alarm Monitoring
company.
2.Identify Amazon account number associated with facilities FACP.
3.Identify password in order to place system in test mode.
4.Call the fire alarm monitoring company and place system in test
mode for up to eight hours depending on the FLS PM or repair
task length. Once PM or repair is complete, take the system off
test after fire alarm panel restores to normal.
5.Disable the BMS trouble ticket function in your BMS dashboard
6.You then must physically disable the fire alarm panel horns
strobes and interlocks.(conveyance shut downs, elevator, hvac, ect.)
See PMV steps.
Step six is critical so site operation is not affected during pump test. There is a small
chance a waterflow switch can be activated due to flowing water within the sprinkler
system piping network.
• When fire pump engages verify the fire pump runs and shuts off through
the timer test. Timer test as follows:
2. Press or turn the switch, to manually start the fire pump. (This
verifies that if the fire pump does not activate through a
pressure drop in the sprinkler system it can be manually
activated thru the FP controller.)
3. Let the timer test perform it’s job by turning the pump off
through the proper shut off time.
Diesel- 30 min run time
Electric – 10 min run time
On or Start Button
Amazon Confidential
Fire Pump Churn Testing
Fire Pump Churn Test Manual Start at FP Engine
#3. Switch the turn style button to “H” which stands for
“hand” on the fire pump controller.
(The older FP controllers use the letter “M” for “manual”)
** Anytime during the run of the diesel/electric engine, if you see any
trouble lights or hear anything out of the ordinary, immediately press
and hold the manual stop toggle switch until the FP shuts off.**
• Check the pump packing glands for slight discharge. (One drop per second) (Safety guard)
Check with vendor on performance adjustment measures.
• Adjust gland nuts if necessary
• Check packing boxes, bearings or pump casing for overheating. Check coolant
temperature gauge located on controller or engine (diesel only).
Amazon Confidential
Fire Pump Churn Testing
Fire Pump Packing Glands
Amazon Confidential
Fire Pump Churn Testing
Frequently Asked Questions
Q: Why do Amazon personnel Q: Why are the diesel and Q: Why is my fire pump not
perform the fire pump churn electric pumps run for different shutting down after the timer
test? times? test is complete ?
Frugality. Paying vendors to visit the One of the purposes of the weekly test is The fire pump controller tells the fire pump
site weekly is costly and disruptive. to bring the motor to its operating when to turn off. Occasionally these fire
temperature. This extends the life of the pump controllers are not set properly and it
By bringing fire pump testing in-house, may be necessary to manually turn the fire
Amazon saves approximately $3-million system, and ensures the pump can run pump off using the “stop” button. On electric
across the NACF network each year. for an extended period. fire pumps do not use the knife or lever
disconnect switch to stop the fire pump. Per
Diesel and electric pump drivers have Amazon electrical arc flash policy the knife
different operating temperatures, so the switch is not allowed to be used.
run time for each is also different.
NOTE: The jockey pump will shut off after
the completion of the churn test. The total
system pressure needs to be brought up to
normal operating pressure before jockey
pump will shut down. (Pressure will be
labeled on the jockey pump controller)
Amazon Confidential
Fire Pump Churn Testing
Frequently Asked Questions
The fire pump has packing glands inside the Contact your FLS fire alarm vendor Use the off selector switch or button to
rotating assembly. After a fire pump churn immediately to have this repaired. These isolate and shut off the pump on the
test has been completed, typically the packing signals are critical and must be monitored
gland nuts will need to be adjusted to expel
controller. DO NOT use the electrical
24/7 and are required by fire code.
the correct amount of water for cooling knife switch or circuit breaker unless all
purposes of the packing/rotating assembly. Amazon arc flash procedures are used
Contact an FLS vendor if you are unsure of under the listed WHS cal/cm2 rating.
adjustment.
Amazon Confidential
End of the Road
Questions and Contact Info
FLS WIKI
https://w.amazon.com/bin/view/Fire/Life-Safety_Program
FLS Playbook
https://start.wwops.amazon.dev/boards/15844/253519
Playbook question or comments: Kyle Brown kylebroj@amazon.com
Help needed? Ask the SMEs
firesafety@amazon.com
Amazon Confidential