LOCK OUT & TAGOUT

HSES Training Center


1
SAROOJ CONSTRUCTION COMPANY
Why do you think we have LOTO?

SAROOJ CONSTRUCTION COMPANY 2


Why we use LOTO!

• Protect People, Equipment and the Environment.

• Positive isolation of hazardous energy sources

• Defines responsibilities, task and work location.

• Communication, documentation and tracking.

• Consistency in application

SAROOJ CONSTRUCTION COMPANY 3


What could happen if you
do not follow LOTO?

SAROOJ CONSTRUCTION COMPANY 4


Piper Alpha

A condensate pump in the processing area needed to have its


pressure safety valve checked every 18 months, and the time
had come.

The valve was removed, leaving a hole in the pump where it


had been. Because the workers could not get all the
equipment they needed by 6:00 PM, they asked for and
received permission to leave the rest of the work until the next
day.

SAROOJ CONSTRUCTION COMPANY 5


Piper Alpha

Later in the evening during the next work shift, a little


before 10:00 PM, the primary condensate pump
failed.

The people in the control room, who were in charge


of operating the platform, decided to start the backup
pump, not knowing that it was under maintenance.

SAROOJ CONSTRUCTION COMPANY 6


On July 6, 1988, 167 lives
perished on the Piper
Alpha Platform, located in
the icy North Sea.

SAROOJ CONSTRUCTION COMPANY 7


LOTO provides positive isolation of
hazardous stored energy sources before
work is to be done.

 Electrical
 Mechanical
 Thermal
 Chemical

SAROOJ CONSTRUCTION COMPANY 8


Electrical Energy Sources

• WHEN there is the


potential to be exposed to
live conductors.

9
SAROOJ CONSTRUCTION COMPANY
Mechanical Energy Sources
WHEN there is the
potential to be exposed
To Rotating equipment
or machinery.

SAROOJ CONSTRUCTION COMPANY 10


Thermal Energy Sources

WHEN there is the


potential to be exposed
to residual heat or high
temperatures.

SAROOJ CONSTRUCTION COMPANY 11


Chemical Energy Sources

WHEN the potential


exists for chemical
exposure.

SAROOJ CONSTRUCTION COMPANY 12


Equipment used in Lock Out Tag Out

• Locks • Multi-Hole Hasp


• Tags • Tie wraps
• Cables • Blinds/Spades
• Lockout board(s) • Blind Flanges

SAROOJ CONSTRUCTION COMPANY 13


Types of Lock Out Devices

14
SAROOJ CONSTRUCTION COMPANY
Locks, Keys and Tags

SAROOJ CONSTRUCTION COMPANY 15


Locks, Keys and Tags

Completed Tag
SAROOJ CONSTRUCTION COMPANY 16
LOCKOUT/TAGOUT

Lockout/Tag out

Covers the servicing and maintenance of


machines and equipment in which the
unexpected start-up or the release of stored
energy could cause injury to employees.
employees

SAROOJ CONSTRUCTION COMPANY 17


LOCKOUT/TAGOUT

Lockout/Tag out

Tags will not be used alone without locks and


will clearly indicate the following:
• Name of the Authorized Person working on the equipment or process

• Date the lock and tag was installed

SAROOJ CONSTRUCTION COMPANY 18


Responsibilities
Designated Person:

• Recognition and application of all methods


of isolation of all hazardous energy sources.

• Provide a colour coding system for the various


craftsmen which will clearly identify the
authorized person.

• Issuing of Permit to Work on equipment or


process after witnessing the isolation.

SAROOJ CONSTRUCTION COMPANY 19


Responsibilities

Designated Person cont’d:

• Co-ordinate the continuation of isolation protection


through the shift or change of personnel.

• Ensure personnel carrying out work on isolated


equipment or process, are trained and qualified.

• Perform regular inspections and audits on the


isolation procedure and report to management any
improvements.

SAROOJ CONSTRUCTION COMPANY 20


Responsibilities

Authorized Person
• Not to remove or install any isolations or tags on equipment
or process until approval in writing by the designated person
• Not to energize/de-energize any equipment or process
without written approval in the form of a Permit to Work from
the designated person.
• Have a complete understanding of the isolation procedures.
• Ensure all workers in the vicinity of isolations are notified.
• Ensure workers involved in repairs or maintenance are
trained and understand the controls and the hazards
involved.

SAROOJ CONSTRUCTION COMPANY 21


Multi-Group Isolation
LOCKOUT/TAGOUT
Before Isolation of equipment/process the Authorized Person
will:
• Locate and identify all energized points and devices.
(Circuit breakers, valves etc.)
• Apply for a permit to isolate equipment/process from the
Designated Person
• Give advance notice to all personnel working on the same
equipment/process and those working in close proximity to
the scheduled for isolation.
• Install Lock Out/Tag Out devices in the presence of the
Designated Person, this is to prevent the equipment from
being activated while work is being carried out.

SAROOJ CONSTRUCTION COMPANY 22


Multi-Group Isolation
LOCKOUT/TAGOUT cont’d
efore Isolation of equipment/process the Designated Person will:

determine numbers of personnel working on the same


equipment/process.

provide a Lock Out Adapter when more than one group


of workers are working on the same equipment/process.

install his own lock to prevent the last group of Workers


leaving the work site and removing the lock without his prior
knowledge

SAROOJ CONSTRUCTION COMPANY 23


Supplementary to Permit Number:
Isolation Certificate
Facility / Area: Exact Location:

Work to be Performed:

Equipment / Tools to be Used:

PART 1: APPLICATION (To be completed by Authorized Person / Isolator)

Item No. (valve, line Method of Isolation Date of Isolation Time of Isolation Name of Initial of *Temporary removed Signature of Issuing
number) Isolator Isolator Date / Time Authority

PART 2: APPROVAL (To be completed by the Issuing Authority / Area Superintendent)

I hereby certify and confirm the necessity for the isolation, lock-out / tag-out or block out of the above listed equipment, and that all necessary safety measures
and precautions were observed by the Authorized Process Isolator.

Name of the Issuing Authority / Area Superintendent:

Signature:

Date of Approval:

*Should Temporary removal be required, additional Permit to Work to be raided to cover the activity. Isolations to be replaced on completion.

PART 3: COMPLETION OF WORK (TO BE COMPLETED BY THE AUTHORIZED PERSON AND ISSUING AUTHORITY)

I hereby declare and confirm that all equipment, tools and materials have been removed from the work area and request permission to remove isolation, lock-
out / tag-out or block out devices for the purpose of re-energizing the equipment list in Part 1 above.

Signature of the Authorized Person: Date: Signature of the Issuing Authority: Date:

24
SAROOJ CONSTRUCTION COMPANY
LOCKOUT/TAGOUT

Definitions
Authorized employee:

Any employee who performs servicing or


maintenance on machines and equipment.

Lockout or tagout is used by these employees


for their own protection.

SAROOJ CONSTRUCTION COMPANY 25


LOCKOUT/TAGOUT

Definitions

Affected employee:
Any employee who performs the duties of
his or her job in an area in which the energy
control procedure is implemented and
servicing or maintenance operations are
performed.

SAROOJ CONSTRUCTION COMPANY 26


Preferred methods for isolating a gas, liquid or
vapor process stream are :

27
SAROOJ CONSTRUCTION COMPANY
The “Fatal Five” Main Causes of Lockout/Tagout Injuries

• Failure to stop equipment

• Failure to disconnect from power source

• Failure to dissipate (bleed, neutralize) residual


energy

• Accidental restarting of equipment

• Failure to clear work area before restarting

SAROOJ CONSTRUCTION COMPANY 28


HOW MOST INJURIES OCCUR

• Injured by Moving Machinery Part.

• Made Contact With Energized Part.

• Injured by Physical Hazard (Heat, Chemicals).

• Injured by Falling Machine Part.



 29
SAROOJ CONSTRUCTION COMPANY
CAUSES OF INJURY

1. Un-jamming Objects From Equipment

2. Cleaning Equipment

3. Repairing Equipment

4. Performing routine maintenance

5. Installing Equipment

SAROOJ CONSTRUCTION COMPANY 30


CAUSES OF INJURY cont’d

6. Adjusting Equipment

7. Performing Electrical Work

8. Inspecting Equipment

9. Testing Materials

SAROOJ CONSTRUCTION COMPANY 31


REASONS FOR EQUIPMENT NOT BEING TURNED OFF

• Afraid of slow down in production.

• Afraid It would take too long.

• Worker did not know power was on.

• Worker did not now how to turn off equipment ON OFF

• Did not think it was necessary.

SYSTEM
CONTROL
SWITCH

SAROOJ CONSTRUCTION COMPANY 32


When using TAGOUT please remember:

• Tags are only warning devices!


• Tags must be securely attached!
• May evoke false sense of security!
• Tags do not provide physical restraint!
• Tags must never be ignored!
• Must withstand environmental conditions!
• Must be legible and understandable!

SAROOJ CONSTRUCTION COMPANY 33


RELEASE FROM LOCKOUT/TAGOUT

THE AUTHORIZED EMPLOYEE MUST:

1. Inspect Work Area For Hazards

2. Clear all employees

3. Notify All Affected Employees

4. Remove Isolations, only after receiving approval


in writing by the designated person.

SAROOJ CONSTRUCTION COMPANY 34


KEY ELEMENTS TO AN EFFECTIVE PROGRAM

1. Develop and Strictly Adhere to LO/TO Procedures.

2. Establish and Enforce Safe Work Practices.

3. Ensure Proper Training and Supervision.

4. Strengthen and Modify Present Policies.