SCADA/DMS Implementation for RDSS works in the
KERALA STATE ELECTRICITY BOARD Ltd.
&
TCED (Thrissur Corporation Electricity Department)-
PREBID Meeting on 10-03-2023
2
SCADA Project under Revamped Distribution Sector Scheme (RDSS)
Control
No. Center Details of SCADA Control Centers
Location
SCADA/DMS Control Center - A1 &
1 Kollam
Zonal SCADA Control Center - B1
2 Kottayam Zonal SCADA Control Center - B2
SCADA/DMS Control Center - A2
3 Thrissur
(Combined for KSEBL & TCED)
Zonal SCADA Control Center - B3 &
4 Ernakulam
Common DRR Control Center & DR Center
5 Malappuram Zonal SCADA Control Center - B4
SCADA/DMS Control Center - A3 &
6 Kannur
Zonal SCADA Control Center - B5
5
Quantity Proposed in group A Town
CONTROL
CONTROL LOCATI
LOCATI RTU
RTU RMU
RMU FRTU
FRTU SCADA
SCADA
CENTER
CENTER TYPE
TYPE ON
ON OF
OF WITH
WITH INTEGRAT
INTEGRAT
CC
CC INTEGRA
INTEGRA ED
ED FPI
FPI
TED
TED FRTU
FRTU
SCADA
SCADA DMS
DMS CC
CC KOLLAM
KOLLAM 8
8 701
701 -- 595
595
(A
(A TOWN)
TOWN) THRISSU
THRISSU 10
10(8 835
835 141
141 526
526(340+1
R
R (8+2
+2) (545+290)
(545+290) (340+186)
86)
(includin
(includin )
g
g TCED)
TCED)
KANNUR
KANNUR 6
6 370
370 -- 437
437
TOTAL(A)
TOTAL(A) 3
3 24
24 1906
1906 -- 1558
1558
TOWNS
TOWNS
6
6
Quantity Proposed in group B Town
ERNAKULAM 40 - 2971
MALAPPURAM 36 - 1924
KANNUR 34 - 1972
7
7
Items of special interest and care to KSEBL
• Redundant Connectivity using KFON OFC network
• RMUs with Built-in FRTU
• Communicable FPI (SCADA integrated)
• Implementation of Dash Board in SCADA DMS CC, Zonal CC and in KSEBL HQ
• DRR/DR Center
1. The sizing & capacity of Server, database & Memory, etc. of DRR Center (Common for 3 SCADA/DMS control
centers) shall be decided in accordance to the functional requirement mentioned in RfP and in line with chapter
19, design parameters and design tables.
2. The sizing & capacity of Server, database & Memory, etc. of DR Center (Common for 5 Zonal SCADA Control
centers) shall be decided in accordance to the to the functional requirement mentioned in RfP and in line with
chapter 19, design parameters and design tables.
8
The detailed Integration Plan/ Methodology shall be finalised during Functional
Design document and approval stage.
With the implementation of the SCADA/DMS project, the real time monitoring &
control of the distribution system in selected towns, encompassing all
distribution Sub-stations and the 11kV & 33kV distribution network will be made
possible.
Project is very important for Kerala as it would lead to improvement in
considerable reduction in supply restoration time, operational efficiencies,
loss reduction & reliability of power supply in Kerala.