Professional Documents
Culture Documents
MSA LAY OUT and Org Chart
MSA LAY OUT and Org Chart
02 Milestone MSA
04 Business Process
05 Revenue Transaction
Equipment
4 8 2 26 1
Appendix : Equipment
PROD/
ACTIVITY EQUIPMENT MANUFACTURE MODEL QTY NOTE
YEAR
HMC Gotwald Diesel HMK 300 E 2 2002 1 Unit deployment at MSA
Stevedoring STS MB SPT 45T 42/16/15M
STS Terex Noell Electric 4 2014
30/12M
Planned to be electrified in
Original Diesel RC 50/56 2 2011
2021
Modif Diesel to
ZPMC RC 50/56 2 2011 Electrified in 2018
Lift On/Lift Of RTG Electric
Modif Diesel to
RC 50/56 1 2011 Hybrid Modification in 2019
Hybrid
Terex Noell Electric RTG 41 /23.47/1 OVER 6 AC 3 2014
SG20J 8 2012
Hino
Head Truck SG260TH 6 2020
Haulage & Nissan GKE280S35 8 2015
Relocation CIMC VEHICLES THT60YT 8 2012 Terminal Chassis
Chassis/Trailler CIMC VEHICLES THT45TMT 8 2016 Terminal Chassis
SHANGDONG LHY940P 6 2020 High way design
Located in Inkopau
Diesel 1
Supporting Forklift Toyota 5FD35 1995 Warehouse
Diesel 7FD40 1 2013 Maintenance Support
Lift On/Lift Of
Side Loader
Empty
Organization Structure
Manpower Total
Organic 145
Outsource 167
Total 312
Revenue Stream & Cost Driver
Revenue Stream Major Cost Driver
98 93 95 94 96 95 100 98 99 98 99 99
Base On BOT Contract Ground Slot MSA at Lini-1 Existing Ground Slot MSA at Lini-1 CY :
CY : Block : 3A+3B+4A+2A = 876 GS (additional 72 GS)
Block
Block : 3A+3B+4A
Equipment = 804 GS
Remark Block Equipment Remark
1B 1 RTG 27 Slot
1C+2C 1 RS 18 Slot
Appendix : Certificate ISO 9001 : 2015 & ISO 45001:2018
As part of our
commitment to
customer
satisfaction and
safaty, MSA
registered with
Lyoid Register to
achieved ISO
45001:2018 and
9001:2015
THANK YOU