Professional Documents
Culture Documents
Panel Design Training
Panel Design Training
System Architecture
Bill of Material
Electrical Load Calculation
Heat Load Calculation
Panel Design
Q&A
System Architecture
https://intechprocessautomation-my.sharepoint.com/personal/faizan_aadil_intechww_com/Documents/Study%20Work
/Panel%20Design%20Training/Lifua/BOM/LFA-STS-ICS-LST-IPA-00002-00.xlsx
Electrical Load Calculation
https://intechprocessautomation-my.sharepoint.com/personal/faizan_aadil_intechww_com/Documents/Study%20Work
/Panel%20Design%20Training/Lifua/ELC/LFA-STS-ICS-CAL-IPA-00002-00.xlsx
https://intechprocessautomation-my.sharepoint.com/personal/faizan_aadil_intechww_com/Documents/Study%20Work
/Panel%20Design%20Training/Lifua/ELC/LFA-STS-ICS-CAL-IPA-00001-00.xlsx
https://intechprocessautomation-my.sharepoint.com/personal/faizan_aadil_intechww_com/Documents/Study%20Work/Pa
nel%20Design%20Training/Lifua/ELC
D:\CV\20220419-Cover Letter.docx
Scope of Work – Gateway PLC
New controller and EtherNet/IP communication module (for replacing the existing ControlNet module).
Existing chassis, power supply and the DHRIO Module will be used.
Engineering workstation and APP Servers will be server grade machine. Operator workstations, server grade confirmation
is pending from CABGOC.
GS Mike PLC and HMI Applications and objects shall be used for upgrade. GSM Objects will be verified before using for EK.
Scope of Work – Factory Acceptance Test (FAT)
FAT shall include Hardware and software testing of both the packages.
If customer cannot attend the FAT, internal testing records will be shared and considered for
acceptance of equipment
Total 3 teams during shutdown in single shift. 2 for PCS and 1 for SIS.
2 teams for SIS hot cutover. This will be carried out in 2 shifts per day.
Due to the prevailing chip shortage, certain industrial control components are also facing longer lead times,
which are beyond INTECH's control and may impact final delivery schedules.
Scope of Work – Exclusions
All civil work
Installation and Erection activities
Cable trays installation
Any Cable laying Outside control panel
Supply & Installation of FO and Ethernet cables outside cabinets
Grounding system engineering outside INTECH supplied cabinets
All type of Construction work
Control room engineering
Panel base construction
Shades for panel
Dismantling of existing panels
Hardware Scope of Supply
Control Logix Hardware for PCS
AVEVA 2020 System Platform with OMI Clients (to be free issued by CABGOC)
Procurement
Portfolio Manager Factory Manager Manager
(Kashif Ijaz) (Rehan Afghan) (Assad Ahmed)
CABGOC
Project Manager
Project Execution Factory QHSE Logistics
Manager Engineer Supervisor
(Bilal Fraz) (Jeena Kokkodan) (Sohail Raza)
Project Lead
Project Team
Engineer
Interface
(Faizan Aadil)
HMI Application
CAD Engineer Commissioning Material Handler
Development
Engineers
Team
Hand Over
Hardware Design Software Design
As-Built
HW Design approval from SW Design approval from
customer customer
JB/Panel Integration
Staging and
Internal Testing
FAT
Project Schedule
Payment Milestones
1. Design
2. Factory Acceptance Test
3. Training (if applicable)
4. Site services (if applicable)
1. feedback@intechww.com
Q&A Session