Cooperation Fields: China Pakistan Economic Corridor Long Term Plan: Components

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 7

Cooperation Fields

China Pakistan Economic Corridor Long Term Plan :


Timeframe 2014 – 2030
Components:
I. Gwadar ( including port and city and Gwadar region
socio-economic development)
II. Energy (Coal, Hydel, Wind, Solar, LNG , Transmission)
III. Transport Infrastructure (Road, Rail, Aviation)
IV. Investment & Industrial Cooperation (Gwadar Free
Zone and other industrial parks to be finalized)
V. Any other area of interest mutually agreed

1
CPEC: Priority Power Projects
Estimated Cost
# Project Name* MW* Status**
(US$mn)*
Port Qasim Electric Company Coal Imported Coal; Super Critical; Completion
1 1,320 1,980
Fired Project 2018
Imported Coal; Super Critical; Completion
2 Sahiwal Coal Fired Power Plant
1,320 1,600 2018

Local Coal; Sub critical; Completion by


3 Engro Thar Coal Fired 1,320 2,000
2018 for first 330MW

Surface Mine Thar Coal Block 2 1,470 Open Pit Mining; Completion by 2018

4 Gwadar Coal Power Project 300 360 Imported Coal. Completion by 2018

Imported Coal. Super Critical. Completion


5 HUBCO Coal Power Project 660 970
by 2018

Imported Coal; Super Critical; Completion


6 Rahim Yar Khan Coal Power Project 1,320 1,600
in 2018

7 SSRL Thar Coal Block 1 1,300 Delay

SSRL Thar Mine Mouth Power Plant 1,320 2,000 Local Coal; Delay

China Pakistan Economic Corridor 2 of 63


CPEC: Priority Power Projects (cont’d)
Estimated
# Project Name* MW* Status**
Cost (US$mn)*
8 Quadi Azam Solar Park 1,000 1,350 Completion 2017

9 Dawood Wind Farm, Bhambore, Sind 50 125 Completion 2017

10 UEP Wind Farm, Jhimpir Sindh 100 250 Completion 2017

11 Sachal Wind Farm, Jhimpir Sindh 50 134 Completion 2017

12 Sunnec Wind Farm, Jhimpir, Sindh 50 125 Delay

Longer term. Completion


13 Suki Kinari Hydropower Project, KPK 870 1,802
expected by 2022

Longer term. Completion


14 Karot Hydropower Project 720 1,420
expected by 2022

15 Matiari to Lahore Transmission Line 1,500 Completion by 2018

16 Matiari to Faisalabad Transmission Line 1,500 Completion by 2018

Total Priority 10,400 21,486

China Pakistan Economic Corridor 3 of 63


CPEC: Actively Promoted Power Projects
Estimated Cost
# Project Name* MW* Status**
(US$mn)*

17 Gaddani Power Park 1,320 3,960 Feasibility stage

Jetty & Infrastructure 1,200 Feasibility stage.

Imported Coal. Completion


18 HUBCO Coal Power Plant 660 970
4Q2018
Salt Range Mine Mouth Power Project inc
19 300 800 Delay
mining, Punjab
Longer term. Completion
20 Kohala Hydel Project, AJK 1,100 2,397
expected 2024
Pakistan Wind Farm II (Jhampir, Thatta,
21 100 150 Delay
Sindh)

22 Thar Mine Mouth Oracle, Thar Sindh 1,320 1,300 Delay

23 Muzaffargarh Coal Power Project, Punjab 1,320 1,600 Delay

24 Gas Power Plant 525 550 Delay

ACTIVELY PROMOTED 6,645 12,927

*Source: Planning Commission of Pakistan, ** Topline Research


China Pakistan Economic Corridor 4 of 63
CPEC: Infrastructure Projects
Estimated Cost
# Project Name* Km* Status**
(US$mn)*

Roads

KKH Phase II (Riakot - Islamabad


1 440 3,500 Initial stage
Section)

Peshawar Karachi Motorway (Multan-


2 392 2,600 Initial stage
Sukkur Section)

Rail Sector

Expansion and reconstruction of existing


3 1,736 3,650 Initial stage
ML-1

4 Havelyian Dry Port 40 Initial stage

Total 9,790

*Source: Planning Commission of Pakistan; ** Topline Research


China Pakistan Economic Corridor 5 of 63
1) CPEC: Development of Gwadar
 Gwadar (located in Baluchistan province) crux of CPEC. It is the link
between China's ambitious One Belt, One Road project, and Maritime
Silk Road project. US$800mn worth of projects are targeted in Gwadar by
Dec 2017.
 China will provide grant of US$230mn for the construction of new
international airport in Gwadar expected to be operational in 2018.
 Gwadar city will also be developed with the help of interest free loan from
Exim Bank of China to finance projects such as:
 300MW coal power plant.
 Desalinization plant.
 300 bed hospital.
 Expressway along Gwadar's East Bay.
 Pak-China Technical and Vocational Institute.

China Pakistan Economic Corridor 6 of 63


THE CONCEPT OF ONE BELT AND ONE
ROAD
The “One Belt One Road” concept has
international strategic importance. The One Belt
One Road initiative covers countries and regions
with a total population of 4.4 billion and a total
economic volume of US$ 21 trillion, 63 % and 29 %
respectively of the World’s total.
According to the assessment of the
Corridor, the plan is involved in laying the
foundation for regional cooperation, improving
economic growth, offering trade diversifications,
investing in transportation, mining and energy
sectors and creating political flexibility. It is a vision
with world-changing implications, an unfolding plan
that would weave much of Asia, Europe, Africa,
Oceania and the Middle East much more closely
together through a patchwork of diplomacy, new
infrastructure and free trade zones.