Professional Documents
Culture Documents
11.safety Good Practice
11.safety Good Practice
Month: August-2023
Classification: Internal
KAIZEN :
BEFORE
OBSERVATION
If any leakage could be occurred in line
and to attempt the same, there was no
any isolation valve for ash silo service
air.
AFTER
CORRECTIVE ACTION
Isolation valve provided as shown in
photo.
BENEFITS
We can isolate the ash silo service air
line without out any stoppage.
KAIZEN :
BEFORE
OBSERVATION
No provision for flushing of cooling
water supply pipe line
CORRECTIVE ACTION
AFTER Removable dummy plug provided
BENEFITS
We can flush the line in regular
intervals for maintaining system
healthiness.
Thank You