CLIENT- DUBAI HOLDING REAL ESTATE -DHRE

PROJECT NAME: DH-0024 ARJAN LANDSCAPING


PROJECT PHASE 02.
PARSONS SCOPE OF THE PROJECT- CONSTRUCTION
AND SUPERVISION SERVICES
CONTRACTOR- M/S ZAID AL HUSSAIN LLC
PROJECT COMMENCEMENT DATE – 04TH APRIL 2023
COMPLETION DATE – 29TH DECEMBER 2023.
MEETING DATE- 16TH OCT 2023.
NUMBERS OF EMPLOYEES FOR CURRENT WEEK
PARSONS: 08 TOTAL:295
ZAH: 287
HSE – ROAD MAP FOR THE SAFE WORKPLACE

ACT & PLA


TOP HIGH-RISK RELEATED WORK IMPROV
ACTIVITIES.
ED N
CHEC
K DO
MAN- MANMACHINE INTERFACE AT
WORK PLACE.

UNDERGROUND EXITING UTILITY


PROTECTION DURING THE
EXCAVATION. Monitoring the Work
Activities on the Jobsite
THE WORKING AREA BESIDE THE
LIVE ROADS.
Job Safety Analysis (in order
LIFTING PLAN FOR CARRYING THE
CONCRETE BARRIERS OR ANY to the most minimal
LOAD ABOVE THEN 1.50 TONS. reasonable standard)
SUMMER HEAT STRESS – STROKES. Risk evaluation and
reduction with high-risk
MACHINERY & EQUIPMENT
SAFETY. tasks underneath
supervision.
CROSSING THE LIVE TRAFFIC
ROAD FROM THE NON-DESIGNATED
AREAS. Apply Applying the
RISK
DUST & NOISE COMPLAINTS FROM Engineering appropriate controls
HIGH LEVEL RISK when executing the
THE RESIDENT. & NOC work according to the
Controls PTW System

Sensitive / Confidential / Proprietary 2


SAFETY MOMENT :- PREVENTING BACK INJURIES – MANNUAL
HANDILING
PLAN
Manual Lifting Process:
Instead of attempting to carry or lift something that is heavy to save some
DO
time during your workday, take an extra minute to use available lifting equipment like
a dolly, wheelbarrow, cart or forklift. Too many injury risks are involved with trying CHEC
to lift some-thing that weighs too much. Think Twice - Lift Once. Do not carry loads K
which obstruct your view, are too heavy or without a prepared/ cleared place to put ACT &
IMPROVE
them down. D

Plan your route: Do you have a clear path? Trip hazards removed?
Assess the load: Too heavy? Should I use a cart, dolly or forklift
Lift it correctly: Position your body close to the object. Keep your back straight.
Bend at the knees
Move it right: Do not twist your back.
Lower it right: When you put the load down, bend your knees NOT your waist

Remember: Always listen to your body, if it does not feel right, it is usually a good
indicator that something is not right, your body knows what it can and cannot do.
Know your limits and ask for help where needed. Safety is your main priority at
work. Be aware of your risks and your surroundings to be able to perform every
aspect of your job safely.

Sensitive 3
PROJECT SH&E PERFORMANCE-LAGGING INDICATORS
HSE KPIs Current Cumulative 250
Week
210 HSE – STATISTICS BOARD
PARSONS
MANHOURS 14,514 204,074 200
ZAH MGR/ENG LWCR 0
MANHOURS SINCE TRIR 0
14,514 204,074 SITE SUPER-
(LTI) 150 VISOR/STAFF Property Damage Cases 0
MTC 0
NEAR MISS 0 2
Office Staff 0
100 First Aid Cases
Banks Man Near Miss/ Hi Po. (cumulative)
FIRST AID CASE 0 0
45 Recordable /Reportable LTI 0 2
50 30 Operator Loss time injury (cumulative)
ACCIDENT/INCIDENT 0 0 0
8 14 6 13 Skill & Non Workers
Fatality
Cases
PROPERTY 0 0 1
0 0 2
DAMAGES 3
Manpower 2
1 4 5
HSE IMPROVEMENT
1 6
NOTICE / SOR/NCR

COMPLAINT MANHOURS Unsafe Act Unsafe Condition


(RESDINTIAL OR 0 0
AUTHORITY) 204,074
AUTHORITY SITE Man Hours Since last LTI.
0 0
VISIT
Total Cumulative Man-hours Worked
WARNING LETTER Current week 14,514 204,074
0 0
FROM AUTHORITY
0 50000 100000 150000 200000 250000

4
PROJECT SH&E PERFORMANCE-LAGGING INDICATORS

HSE Weekly Performance


PERMIT TO WORK HS&E Inspection ; 1; 5% Safety Management Walk ; 1; 5%
100 74 SYSTEM HS&E Inspection Number of SHE Meeting; 1; 5%
50 0 0 0 0 Safety Management Walk SHE Observation/NCR; 1; 5%
0 SHE Observation/NCR

Electrical
Power Tools
PTW - Excava...

Manual handling

Lifting
Number of Trainings/TBT
Daily Task Briefing
No of Safety Induction Number of Trainings/TBT; 5; 24%
Number of SHE Meeting No of Safety Induction; 8; 38%
Counts

Daily Task Briefing; 4; 19%

TRAINING HOURS
76 100
GRAPH CHART – HSE KPI INDICATORS
100 30
200 179
50 8 75 78
100 15 15 8
0 0 8 1 0
0 1 1

Safety Management W...


Banksman Training

SHE Observation/NCR
HS&E Inspection
5
Heat Stress

Number of Trainings...
4 8 Cumulative

Daily Task Briefing


No’s of Safety Induct...
Work Permit

Number of HSE Aud...


1

Number of SHE Mee...


0
Excavation

0 Current Week

No of Safety Award c...


No’s of Drill Conducted
Current Week
TRAINING HOURS

5
GOOD
PRACTICE
ORGANIZATION OBSERVATION
LEADERSHIP & The contractor's HSE engineer, CORRECTIVE ACTION
COMMITMENTS FOR THE HSE officer, and HSE inspector
failed to conduct daily task The Task Related High Risk Work GOOD PRACTICE
SAFE ENVIORNMENT & briefing or toolbox discussions at Activities & Pre Task Briefing for
WORKPLACE the construction site. the Site Workers is to be Continuous Practice of the
conducted by the Contractor. Contractor HSE Engineer &
Officer for the Daily Task Briefing
and TBT Sessions on Topics.
Preventing Back Injuries
Safe Use of the Power Tools
Safe Use of the Lifting i.e Web
sling, chain slings & hooks

Sensitive 6
CORRECTIVE ACTION

Sensitive 7
BREACHES – SAFETY CODE OF
PRACTICE

What are the hazards of dust?


Regularly breathing construction dust can cause
diseases like lung cancer, asthma, Chronic
Obstructive Pulmonary Disease (COPD) and
silicosis

What precautions should be taken against dust?


1. Provide misting water sprays sufficient to reduce
airborne dusting from demolition work; 2. Apply
additional water dust suppression applied during
dry weather; and 3. Avoid dust-generating work
must be avoided on high wind days

Sensitive 8
ISSUES
/CONCERNS

SITE NON SAFETY


CONFORMANCE
OBSERVATION REPORTS AUDITS

COMPLIANCE /
CORRECTIVE ACTION

HSE PERFPRMANCE  Conduct the Safety Awards to appreciate the Workers and site team for promoting the safety culture.
MONITIORING  Lacking of the Contractor Teams for the effective work place inspection and reporting structure of the
MEETING O05 Unsafe Condition and Act occurrence at the site.
 Temporary Shaded Rest Area & Toilets Facilities (Welfare Facilities) should be expediate and sufficient
CONDUCTED WITH numbers of the toilets should be provided at the work place as per the DM – Safety Construction
THE CONTRACTOR Guidelines.
ON DATE 27-SEP -  Safety Campaign “Road and Driver Safety.” for all the operators should be consonducted by the
2023 contractor.

Sensitive 9