C-Das

Group Energy Consumption 2023 Furniture Division Date:

UNIT OF ACTUAL
Unit ITEM DESCRIPTION MEASUREMENT BENCHMARK TARGET STATUS
MAY
Electric Power KWH
Consumption

PNG Consumption SCM


VOPL
Furniture
HSD Diesel Liters
Consumption
Electricity generated KVAH
From Solar

Presented by: Mr. Ajay

1
ELECTRIC CONSUMPTION : VOPL Furniture
Target : Electric Consumption Reduction by 30% in 3 years i.e. 10% reduction every year

Actual
Source:- Mr. Ajay Target
Benchmark

60000

50551
50000 45496
40441
40000
35386
KWH

30000

G
20000 O
O
D
10000

0
g'22) Jan'23 Feb'23 Mar'23 Apr'23 May'23 Jun'23 Jul'23 Aug'23 Sep'23 Oct'23 Nov'23 Dec'23 Target Dec'24 Dec'
B M( A v

Following points may be consider to reduce Electric Consumption:


1. Installation of capacitor on every motor for improvement in power factor
2. Monitoring of Idle running of motor .
3. Monitoring of idle running of transformer.
4. Use of variable speed drives for large variable load.
5. Checking of under voltage and over voltage condition .
6. Optimize Air Compressors.
7. Schedule Shut-Downs and Start-Ups.
8. Demand Side management & Use of renewal energy
PNG (SCM) CONSUMPTION: VOPL Furniture
Target : PNG Consumption Reduction by 30% in 3 years i.e. 10% reduction every year

Actual
Source:- Mr. Ajay Target
Benchmark

3.45
3.4
3.4
G
3.35 O
3.3
O
D
SCM

3.25

3.2

3.15
3.1
3.1

3.05

2.95

BM(Av
g'22) Jan'23 Feb'23 Mar'23 Apr'23 May'23 Jun'23 Jul'23 Aug'23 Sep'23 Oct'23 Nov'23 Dec'23 Target

Following points may be consider to reduce PNG Consumption in Boiler:


1. Monitoring of Stack Temperature (Greater than 200 Degree Celsius has the opportunity of recovery of waste Heat) .
2. Feed Water & Primary Air preheating using Waste Heat Recovery Device(Ex. Recuperator/Economizer).
3. Proper Combustion with in the boiler chamber(Incomplete combustion can decrease the efficiency of Boiler)
4. Reduce Excess air.
5. Reduce Radiation and Convection losses.
6. Variable Speed Control for Fans, Blowers and Pumps
PNG (SCM/Kg) CONSUMPTION: VOPL 137/24

TPM Target : Reduction cost by 30% in 3 years i.e. 10% reduction every year

Source:- Mr. for PNG Consumption in SCM Actual


Target
Total Clothes : Kg
Benchmark
PNG Consumption : SCM
3.45
3.4
3.4
G
3.35 O
3.3 O
D
SCM / Kg

3.25
3.2
3.15 3.1
3.1
3.05
3
2.95

Month
Following points may be consider to reduce PNG Consumption in Boiler:
1. Monitoring of Stack Temperature (Greater than 200 Degree Celsius has the opportunity of recovery of waste Heat) .
2. Feed Water & Primary Air preheating using Waste Heat Recovery Device(Ex. Recuperator/Economizer).
3. Proper Combustion with in the boiler chamber(Incomplete combustion can decrease the efficiency of Boiler)
4. Reduce Excess air.
5. Reduce Radiation and Convection losses.
6. Variable Speed Control for Fans, Blowers and Pumps