Assignment ‘1’

Project Management

By Haythem Ayachi
KK6024 Project Management
Assignment 1

1. Using internet, find a profile of an engineering consultancy company. Prepare a presentation on this
company focusing on the following points:
 Describe the organizational structure
 Describe some of the major projects undertaken by this company
 Describe the specific expertise available in the company and how it is being used in the projects being
carried out

1. The following documents are provided as attached.


(i) MLNG DUA DEBOTTLENECKING PROJECT
(ii) Practice Standard for Work Breakdown Structure

Based on document (i), prepare a ppt presentation on the following for the MLNG Debottlenecking project:
 Project scope
 Project Deliverable
 Proposed Work Breakdown Structure (WBS)
Q1 in Assignment 1

Khatib & Alami (K&A) is a


multidisciplinary urban and regional
planning, architectural and
engineering consulting company.
With a history of success and a
network of branches and sister
companies, they provide with an
integrated approach to reliable project
delivery in the evolving globalized
world.
Q1 in Assignment 1

Organizational
structure
Q1 in Assignment 1

The Fields of The Company


ARCHITECTURE
-Hospitality
-health care
-educational
-commercial & retail

ENVIRONMENTAL
- Water resources management
- Surface Water & Flood Mitigation
- Solid Waste Management
- Environmental Impact Assessment
Q1 in Assignment 1

TRANSPORTATION
• Traffic Engineering
• Transportation Planning
• Railway Engineering
• Airport Engineering

ELECTRICAL UTILITIES
• Lighting
• Building
• Conveying Systems
• Utility Management
Q1 in Assignment 1

The Fields
of The
Company
Q1 in Assignment 1

Projects
1- Storage and Warehouse Building at Al Rayan Sports Club
Client - Qatar National Olympic Committee
Project Overview - Construction Cost: USD 20 Million
Total Area: 70,351 m²
Completion Date: 2009
Location: Doha – Qatar

Engineering Services – Design

Project Description - The project consists of a single-floored, pre-


engineered metal building structure serving as a main storage and warehouse
facility, surrounded internally on three sides by 32 mini storage spaces . It
also includes labor accommodation building, auction and open storage areas.
The built-up area is approximately 70,351 m².
Q1 in Assignment 1
2- Project Name - Siblin Cement Factory
Client - Siblin Cement Company

Project Overview - Construction Cost: USD 50 Million


Total Area: 65,000 m²
Completion Date: 1982
Location: Siblin – Lebanon
Engineering Services - Design & Construction Supervision

Project Description - The project consists of a building block made up of 2 basement levels housing the
MEP services, shops and 785 car parking spaces; a ground floor with an entrance hall, a commercial area,
a cafeteria and MEP service rooms; four podium floors dedicated to retail units with an additional car
parking; and 28 office floors that provide open-plan office spaces.
The fifth floor, a podium roof level, features recreational facilities including a health-club, a gymnasium,
a cafeteria and a business center.
The scope of work includes external works such as hard paving, landscaping and utilities infrastructure.
Q1 in Assignment 1

Khatib & Alami (K&A) creates, designs, supervises and


manages projects that have the potential to better
society. They build on their proven multidisciplinary
expertise and offer regional urban planning and
comprehensive architectural and engineering consulting
services. K&A focuses on delivering innovative
solutions that meet clients' real needs.
Q1 in Assignment 1

They covering a broad spectrum of disciplines


from architecture to urban, transportation,
energy, water, and oil & gas projects. They
enhance infrastructure, create new buildings,
develop neighborhoods, and reshape entire
cities.
Q 2 in Assignment 1

Project scope
• Scope statement :
Produce 7.8 MTPA Sub cooled LNG at approximately -161 C which rundown
directly to storage and it has three modules

• Constraints : The contractor carried out a ±15 % cost estimate for the project to
enable the final investment (FID) to be made .

• Assumptions : the following options were considered for refrigeration


downstream of MCHE
1. Simple end flash unit
2. Extended end flash unit
3. Nitrogen cycle
Q 2 in Assignment 1

• Historical Informations : MLNG Dua, completed in 1995, uses gas


turbine drivers for the main refrigerant compressors, and hybrid sea water
and air cooling.
Q 2 in Assignment 1
• Project Charter
Q 2 in Assignment 1
Deliverables

• Background : This project aims to produce sub cooled LNG at


approximately -161 °C which is rundown directly to storage.
Utilities are provided by adjacent facilities .

• Objectives : to increase production capacity by approximately


20%

• Benefits : deliver an economically and technically feasible


approach to delivering increased LNG output from Petronas’
MLNG Dua facility to meet the growing demand for LNG
• Success Criteria
Q 2 in Assignment 1

MLNG DUA De-


Bottlenecking

Engineering Procurement Construction

Mobilization Start on site


Complete/Review BDEP Enquiry Deliverables Civil
Early Engineering Mech.
Prepare Estimate E&I
PEFS Place PO long Painting & Insulation
PO long
ISO production lead items RFSU Module 6
lead items
Substantially Complete Place PO rest RFSU Module 4
Rest equipment
Engineering equipment RFSU Module 5
Bulks
Place PO bulks Pre-Commissioning
/Commissioning
Shutdowns
‘Work Breakdown Structure (WBS)’
Thank You