Work Order
10/30/23
Welcome to the Course
• Practical details
Timetable, breaks
Others
• Introduce yourselves
Name
Role at Total ...
SAP experience and/or other softwares
Expectation for the courses ...
2
Training documents
3
Module Agenda
4
Format of the Training
• Presentations
Concepts & business background
• Work Instructions
Step by step guide on how to complete an SAP transaction
• Demonstrations
Demonstration of the SAP transaction
• Exercise
Your chance to complete the SAP transaction using the exercise
data provided
5
Module Agenda
6
How will SAP affect
me?
7
PM Process
8
Key information
9
PM WORK ORDER PROCESS
A PM ORDER…
serves as a JOB instruction…
Provides the mechanism for preparing the WORK…
Acts as a mailbox for receiving and sending COSTS…
Provides scheduling information, Start/Finish/Duration…
Provides a historical record of work completion…
The TFE EP CR-EXP-200 & GS-EXP-209, defines the basic rules for the
“Work Orders”
10
Types of Work Orders
• The standard order types used by the business are:
Type of Notification Type of Work Order Maintenance Activty Type
NC - Malfunction Report WDF Defect/Breakdown Work Order BK Breakdown
DE After Defect
PC Preventive on Condition
NG - Maintenance Request WGN Work Order on Request CN After Construct/Modif
EX External/Others
FO For Operations
MD Modifications
MS General Maint. Support
RP After Repair
SP Special
WRO Special Order EX External/Others
FO For Operations
PC Preventive on Condition
PS Preventive Scheduled
SP Special
NP - Activity Report WPM Planned Work Order BL Baseline
PS Preventive Scheduled
RO Routine
ST Statutory
11
WORK ORDER Header Data - WO Types
12
WORK ORDER Header Data - WO Types
13
WORK ORDER Header Data - WO Types
14
WORK ORDER Header Data - WO Types
15
Overview
16
Creating Work Orders
17
WORK ORDER Header Data - Priority
- 1 : immediately
- 2 : within 2 days
- 3 : within 1 week
18
WORK ORDER Header Data - Activity Types
Guideline In our R/3 EXAMPE SYSTEM on how to use NOTIFICATION types for ACTIVITY TYPES
…
TYPE DESCRIPTION Activity type Use EXAMPLE
Cont…
19
WORK ORDER Header Data - Activity Types
…
TYPE DESCRIPTION Activity type Use EXAMPLE
NG General Wk CN-Inspect. Used where inspection is required •Radiograph welds for new pipe
Req. to perform work as a consequence •Survey on Punch-listing a new vessel
to Modif. work •NDT on patch repair to damaged tank
NC Correct Wk Req. PC- Used where the equipment no •Isolation valve stiff to operate. Grease to
OnCond. longer perfoms 100% efficiency improve operation…
•Control valve erratic, fluctuating
control
•Drift in calibration on Pressure
transmitter…
20
WORK ORDER Header Data - Other data
21
WORK ORDER Components & Services
• Component requirements
– When a component is needed to perform an intervention, you have to
assign the component to the corresponding Work Order internal
operation. For this component, when the order will be released, a stock
reservation (stock material) or a purchase requisition (non stock material)
will be created.
• Services requirements
– When a service needs to be purchased to perform an intervention, the
corresponding material number should be identified and planned in the
Work Order Component tab. Consequently, a Purchase Requisition will
be created during the Work Order release process.
22
Planning PM Work Orders
• Operations
The initial planning process involves defining and scheduling the
tasks to be performed
– Each task is assigned to an operation
23
Planning PM Work
Orders
• Components
All components must have a material master number, required
quantity, recipient, unloading point and is carried out against the
relevant operation
24
WORK ORDER Costs
•Estimated Costs have to be
entered manually. This costs
will be frozen at the WO
release.
•Planned costs are
automatically calculated with
opérations durations and
material & services indicated
in the operations
•Actual costs are the costs
already confirmed (stock
movement, hours
confirmations)
25
Demonstration / Exercise 1
Transaction IW22/IW32
• Tips
Remember to set the system status to WREL before you save the
work order
26
Capacity Planning
27
Planning Table
28
Profiles
29
Dispatching
• Dispatching may be done manually using drag-and-drop functions, or
automatically
• In the case of automatic dispatching, another profile (dispatch sequence) will give
hints which parameters to consider to automatically dispatch the PM work orders
The standard profile is a combination of start date/time and priority, but
things like work order type can also be added if relevant
A log records the results of every action
30
Release & Print Work
Order
• When the labour and purchasing needs have been entered, the Work
Order can be released
The work order can be printed, work can be started and time can
be posted against the work order
31
Release & Print Work
Order
32
Perform Physical Work
• Note that:
33
Summary
• Work Orders form the documentation basis for the preparation and
performance of work
• Once completed, Work Orders capture the cost information for the
work
34
Key Learning Review
35
Questions?
• Ready to go?
36