BASIC TERMS
3
Design Coal
GCV Kcal/Kg 3300
Free carbon % 24
Moisture % 14
Volatile matter % 21
Ash % 41
4
INCOME
• ROE on fixed charges ( 15.5 %)
• (Marginal contribution) SCHEDULE GENERATION
• DSM(SG-AG)
• RRAS (50 Paisa/unit for RRAS-UP and 25% fuel cost for RRAS-DOWN)
• SCED (7 paisa/unit)
• AGC (50 paisa/unit)
• RTM
• Additional ROE of up to 1% based on ramping.
EMPLOYEE COST (Incl/MGR/CHP Exp) Actual Expenditure
SALARIES & WAGES 6497.14
CONTRIBUTION TO PF & OTHER FUND 742.26
UNWINDING OF DEFERRED PAYROLL-IND AS 44.55
WELFARE EXPENSES 548.95
MEDICAL EXPS 488.58
NET EMPLOYEE COST (SUB TOTAL-v-vi) 83 Cr
REPAIR & MAINTENANCE (R&M) Actual Expenditure
PLANT & MACHINERY (incl.MGR/CHP & Cap OH)
-ROUTINE
-Material Cost 2775.83
-Contractor & Others 4425.33
-OVERHAUL
-Material Cost 0.00
-Material Cost-Cap OH as per Ind AS 247.54
-Contractor & Others 0.00
-Contractor & Others-Cap OH as per Ind AS 340.47
BUILDINGS & OTHER ASSETS
-Material Cost 41.35
-Contractor & Others 794.04
TOWNSHIP ASSETS
-Material Cost 5.93
-Contractor & Others 369.80
TOTAL R&M COST(2) (Incl/MGR/CHP Exp & Cap OH) 90Cr
STATION OVERHEADS (Incl/MGR/CHP Exp) Actual Expenditure
POWER CHARGES 1068.02
CHEMICALS & STORES CONSUMED 1002.31
WATER & ENVIRONMENT CESS 0.00
WATER CHARGES 2008.29
INSURANCE 544.15
SECURITY EXPENSES 1699.71
COMMUNICATION EXPENSES 98.27
INLAND TRAVELLING EXPENSES 320.21
FOREIGN TRAVELLING EXPENSES 0.00
HIRING OF VEHICLE EXPENSES (EXCL.VEHICLE RUNNING EXP) 173.72
TENDER EXPENSES 1.90
LEGAL & PROFESSIONAL CONSULT. 98.27
TRAINING EXPENSES 91.83
ADVERTISEMENT & PUBLICITY 1.04
EDUCATION EXPENSES 42.14
OTHER ADMINISTRATIVE OVERHEADS 1549.96
CSR EXPENSES(incl.transd from Education exp under Stn OH) 255.19
ASH UTILISATION EXP.(Net of Reserve) Fly Ash Transportation 0.00
ASH UTILISATION EXP.(Net of Reserve) Other than Transportation 0.00
ENERGY CONSERVATION 76.75
ENVIRONMENT MANAGEMENT EXPENSES 93.82
TOTAL STATION OVERHEADS (3) (Incl/MGR/CHP Exp) 91 Cr
Total 282 Cr
Start-up cost of unit 2 revival from RSD
TOTAL COST (excluding Revenue loss and AFC loss) Rs Crore 2.26
TOTAL COST (Including Revenue loss and AFC loss) Rs Crore 2.26
Start-up cost of unit 2 revival from TRIP
TRIP Outage cost Start-up
09/11/2022 at 07:12
Unit/Time/date Outage hours 3.67 OIL LDO - KL 16
hrs
Load 464.00 Outage Mus 2.42 OIL cost Rs 1465280
Frequency 49.99 ECR Rs/Kwh 5.74 Coal MT before Sync 64
Schedule 391.00 Revenue loss due to Coal cost Rs 473600
prevailing PLF at the 639206
AG 464.00 time of Trip Rs Make up water M^3 0
AFC loss in case
annual DC goes 4351122 water charges Rs 0
below 85% Rs
Net DSM Rs Cyclic+ Non cyclic DM
909743 150
(fuel cost adjusted) water M^3
Remark Chemical charges Rs 6750
Gross DSM Charges Rs 217885
Net DSM Rs 2692697
(fuel cost adjusted)
Maintenance cost Rs 0
TOTAL COST (excluding Revenue loss and AFC loss) Rs Crore 0.55
TOTAL COST (Including Revenue loss and AFC loss) Rs Crore 1.05
Click to edit Master title style
Day Ahead Scheduling--DAM
DAM
Review corridor
Bidding Matching and funds Result Confirmation Scheduling
availability
T1 T2 T3 T4 T5 T6 T7 T8
2345 0000 0015 0030
2230 Odd block 2245 2300 2315 2330
91st block Auction Results Schedule preparation Prep for Delivery Period
• Schedule
& Communications Dispatch
Revision can
happen from
T7 onwards.
• Auction will
take place for
T7 & T8 in the
next block after
schedules are Schedule revision stopped for T8 & T9
frozen in T1
T1 T2 T3 T4 T5 T6 T7 T8 T9
Even block 2345 0000
2245 2300 Odd block 2315 2330 0015 0030 0045 0100
92nd block Auction Results Schedule preparation Delivery Period
• Schedule Revision can Prep for
happen from T8 (T7 for & Communications Dispatch
the next block) onwards.
13
Ancillary Services- Support to Grid
Inertial
response Mandated as AGC
as stored per Grid Code Implementation
kinetic via
energy RGMO/FGMO
TRAS
/RRAS/Gas/hydro
scheduling
FRRAS scheduling
4000MW
• DC revision is to be done promptly during equipment issues, ramping and start-ups and trips by SCE.
• Ramping performance augmentation by coal quality management and ramp declaration optimization.
• Startup activities and sync time suitability, as per the demand and applicable charges.
• Asking rates for 2% deviation and ramp achievement – Main ABT feature screen incorporation
• AGC set point input during SG< Tech Min. and maximum load
• th
CERC Order Dt. 26th Dec-22 (amendment DSM regulation 2022)
3. Old DSM w.e.f 5th Dec-22 is valid between above frequency band only old DSM
In last day’s order, under injection is promoted by giving savings to generators at 50%
ECR whereas over injection is still penalized in same old way with no charges even for
2% above SG
For frequency <=49.9 hz, grid will be helped by over injection and will be further
disturbed by under injection.
In last day’s order, over injection is promoted by giving savings to generators at 50%
ECR whereas under injection is still penalized in same old way with no charges.
PROS
For any under-injection at frequency >=50.05 Hz, generators must pay only 50%
of ECR… 50% ECR savings
For any over-injection at frequency <=49.9 Hz, generators will get 150% of ECR
(irrespective of volume limit of 2%)… 50% ECR savings
CONS
Frequency >=50.05 hz, no deviation charges will be paid to the generator for any
over injection (Earlier up-to 2% of SG, generators were paid at ECR)
Solapur being high ECR station can gain from under or over injection savings
@50% ECR, provided we have margins for the same at frequency end.
As frequency profile is uncertain in this new regime, so best is to stick to schedule
for few days and then analyze and act