Quoting Exercise 2022
Quoting Exercise 2022
S = Seller
B = Buyer
• For this quoting exercise and in order to simplify calculations just consider
the following costs in your final Price per unit:
• Packaging.
• Freight charges to destination.
Material Cost
• Material: Aluminum. Weight 325 gr per piece.
• Price average August 2019 – July 2020 = 1.664 USD/KG
• Price/325gr = 0.5410 USD/PC
Processing Cost
• Annual Required Production = 5.5 M pcs
• Annual Required Production + 10% SS = 6,050,000 pcs
• Monthly Production = 504,167 pcs
• Weekly Production (4.5 weeks/month) = 112,038 pcs
• Daily Production (6 days per week) = 18,673 pcs
• Production / hours = 778 pcs (24 hours - 3 shifts – 8 hours each)
• Required Personnel per day = 24 persons.
* Personnel per shift* = 8
• Daily Minimum Salary DOF = 7.86 USD/ person (172.87 MXN/day)
• Total Daily direct labor = 188.59 USD (24 persons/day).
• Total Weekly direct labor = 1,131.51 USD (6 days a week).
• Daily Direct Labor / daily produced pieces = 0.01 USD (188.59 USD / 18,673 pcs).
a) Packaging Cost
a) Packaging Cost
• L 490 x W 490 x H 300 mm (20” x 20” x 12”) –
- Cardboard size selected. Double Corrugated
• Approx recommended weight per box 70 Kgs
• https://es.uline.mx/Product/GuidedNav?t=184360&
dup=over
• 215 pcs/box (70 kgs / .325 kgs)
• 87 daily boxes (18,673 pcs / 215 pcs/box)
• Approximated Price / Box = 2.87 USD
• Daily cardboards spend = 249.69 USD (2.87 USD X
87)
• Daily cardboard spend /daily pieces = 0.0133 USD
(249.69 USD/ 18,673 pcs)
a) Packaging Cost
1m
1.64 m
b) Freight Cost & Cubic Analysis
• Daily Production = 18,673 pcs
• Weekly Production (6 days a week) = 112,038 pcs (need to send all of these pieces in
one shipment)
• Considering a 53’ ft truck:
• Maximum authorized weight = 59,000 Kgs
• Width 2.52 m X Height 2.8 m X Length 16.15 m
b) Freight Cost & Cubic Analysis
• 52 ft box view from the top.
• 32 skids on 1st stacking level (12 boxes per skid) = 384 boxes = 82,560 pcs
• 17 skids on 2nd stacking level (8 boxes per skid) = 136 boxes = 29,240 pcs
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
1.2 m
2.52 m
Width 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1.2 m
8 Pallets
2.8 m Height
1.64 m
16 Pallets
16.15 m Length
b) Freight Cost & Cubic Analysis
• Weight/cont = 32 pallets on 1st level * 860 Kgs + 17 pallets on 2nd level * 580 Kgs) = 37,380 Kgs vs
59,000 kgs that are the limit.
• Distance between Mexico City & Ciudad Hidalgo, Chiapas = 1,188 Kms
• Approximated Cost per shipment = 4,500 USD (no insurance included) – 3.36 USD/KM approx.
• Total pieces / cont = 112,038 pcs
• Freight cost / piece = 0.0401 USD
Tooling Costs
• Annual Required Production + 10% SS = 6,050,000 pcs
- Estimated Tooling investment = 25,000 USD
- Tooling cost / piece = 0.0041 USD
Parts Cost
- No additional components are required for the clamp.
Cost Break Down
Purchase price
Processing cost
0.01 USD
: Processing time x ratio or rate
+
Parts cost
0.0000 USD
: Part unit price x quantity used
+
16.25 MXN