Professional Documents
Culture Documents
Deep Foundation - Ir. Masyur Irsyam
Deep Foundation - Ir. Masyur Irsyam
Jenis Tanah Sc
Percepatan permukaan = 0.20 x 1.2 = 0.24 g
Pelabuhan Internasional Bojonegara
Deepsea Port Pertama di Indonesia
Masyhur Irsyam
Awal Surono
Andi Kartawiria
Jembatan Suramadu
20 m 15 m
100 m 100 m
56 Tiang
Diameter 2.4 m
PROSES PEMBUATAN CASING DIAMETER 2.70 M
PLTU
Pondasi untuk Gas Turbine Generator
Intake Pump House
PERHITUNGAN PONDASI
3.2.1 D ry M e th od
3.2.1 Casing Method
Pemboran
tanah untuk
pondasi
Dry metod and casing
Fully cased drilling using oscillator
Drill and push the Drill with the rotary Install reinforcement Pour concrete through Extract the casing with
casings into the ground tools: bucket, auger or cage with the auxiliary the tremie pipe into the the rotary drive during
with the rotary drive core barrel. Stabilised winch of the drill rig into cased borehole concreting (with the os-
(and attached oscillator) the wall of the bore the bore stabilised by the cillator)
with the casing casings
3.2.1 Slurry Method
BENTONITE SUSPENSION
Tiang
Tanah
Ram
Capblock
Helmet
Cushion
Relationship between Cohesion and N-Value (Cohesive soil)
Relationship between Angle of Internal Friction and N-Value
(Sandy Soil)
CPT (Cone Penetration Test) atau Sondir
Friksi
End Bearing
Rumus umum daya dukung aksial fondasi dalam:
Qult = Qs + Qp
Pasir
Lempung
Pasir
Lempung Pasir
Lempung
Pasir
Lempung
Pasir
Lempung Pasir
Tahanan Geser Selimut
Tanah Kohesif
Tiang Pancang
Tiang Bor
Tanah Pasir
Tiang Pancang
Tiang Bor
Data Tanah:
Teoritis
Empiris nilai N-SPT
Beban
Friksi
End Bearing
Load Transfer Friksi
Friksi
6% Diameter Pile
displacement
Apa arti a untuk tiang pancang?
tpeak = C tresidual = a
tresidual tpeak
Tahanan Geser Selimut Tiang Pada Tanah Lempung :
t=aC
Faktor Adhesi (a) pada Tanah Kohesif untuk
“Tiang Pancang” :
1. API Metode - 2, 1986
Faktor Adhesi (a) pada Tanah Kohesif untuk
“Tiang Bor” :
1. Reese and Wright, 1977 :
Manurut Reese dan Wright koefisien a untuk bored
pile adalah 0.55
2. Kulhawy, 1984
(kN /m 2
)
D a ta g ro u p 3
A d h e s i o n f a c t o r (
S h a ft s in c o m p r e s s io n
D a ta g ro u p 1
D a ta g ro u p 2
D a ta g ro u p 3
6 5 U 8 4 1 C lo a d te s ts
= 0 .2 1 + 0 .2 6 p a / su ( < 1 )
U n d r a i n e d S h e a r i n g R e s i s t a n c eu , s (ts f)
Tahanan Geser Selimut Tiang Pada Tanah
Lempung :
sv
t = sh tan d
sh = sv K
Tahanan Geser Selimut Tiang pd Tanah Pasir :
Limiting f,
Soil , degrees
kips/ft2 (kPa)
very loose to medium, sand to silt 15 1.0 (47.8)
loose to dense, sand to silt 20 1.4 (67.0)
medium to dense, sand to sand-silt 25 1.7 (83.1)
dense to very dense, sand to sand-silt 30 2.0 (95.5)
dense to very dense, gravel to sand 35 2.4 (114.8)
Tahanan Geser Selimut Tiang dari Tanah Berpasir
Dari Korelasi Empiris dng N-SPT
Menurut Naval Engineering Facilities Command :
1. Tiang Pancang :
Qs = 0.2 x (N SPT) x Li x p (ton) displasemen besar
2. Tiang Bor :
Qs = 0.1 x (N SPT) x Li x p (ton)
Tahanan Geser Selimut Tiang Bor pada Tanah
Berpasir Dari N-SPT Rojiani, Duncan and Barker (1991)
(=27.5 t/m2)
= 0.11 N (t/m2)
20
10
Tanah Lempung
Tiang Pancang
Tiang Bor
Tanah Pasir
Tiang Pancang
Tiang Bor
Terzaghi
Daya Dukung Ujung untuk Tanah Kohesif Cu
Qp = Nc x Cu x Ap
= 9 x Cu x Ap
Daya Dukung Ujung untuk Tanah Pasir
Qp = q x Nq x Ap
Berdasarkan API
q = σ’ x Nq
Limiting q,
Soil Nq
kips/ft2 (MPa)
very loose to medium, sand to silt 8 40 (1.9)
loose to dense, sand to silt 12 60 (2.9)
medium to dense, sand to sand-silt 20 100 (4.8)
dense to very dense, sand to sand-silt 40 200 (9.6)
dense to very dense, gravel to sand 50 250 (12.0)
Daya Dukung Ujung Tiang Bor Tanah Pasiran f:
Daya Dukung Ujung untuk Tanah Pasiran
dng Korelasi Empiris N-SPT
Tiang Pancang :
Qp = 40 x N SPT x Ap
Dimana,
N–SPT = (N1+N2)/2
N1= harga rata-rata N dari dasar ke 10-D keatas
N2= harga rata-rata N dari dasar ke 4-D kebawah
Ground Surface
Tiang Pancang
(10 x D)
dirata-rata untuk
desain tahanan ujung = N1
(4 x D)
dirata-rata untuk
desain tahanan ujung = N2
D
=7 N (t/m2)
qp = 7 N (t/m2) < 400 (t/m2)
=400 (t/m2)
Ultimate Side Resistance (t/m2)
500
400
300
200
100
Qp = 13 x N-SPT x Ap
Qu = Qp + Qs
Qs =2r l ( C)
+ 2r l (k v tan)
l Qu
Q all =
k sv F.S .
sv
Qp =Ap(c Nc +q Nq)
Summary Perhitungan Daya Dukung Aksial Pondasi Tiang
Rangkuman Perhitungan Daya Dukung Aksial Pondasi Tiang
Lempung
Tiang Pancang Tiang Bor Tian
Panca
Berdasarkan c Berdasarkan c
t= ac t = ac
- a (API, 1986); Gbr. 3.15 - a (Kulhawy, 1984); Gbr. 3.17
QS t - a (revised API meth, 1987) - a = 0.55 (Reese & Wright, 1988)
a = 0.5(y)-0.5, untuk y ≤ 1.0 - a (Reese & O’Neil,1988); Gbr 3.18
a = 0.5(y)-0.25, untuk y > 1.0
- a (Tomlinson, 1977); Gbr 3.16
QP
QP
t = Ks’tand
K = 0.8 (open ended piles)
K = 1.0 (full displacement
piles)
d → Tbl. 3.5
QP
qb qp = 9c
Pasir
Tiang Pancang Tiang Bor
QS t
Berdasarkan c Berdasarkan c
t= ac t = ac
- a (API, 1986); Gbr. 3.15 - a (Kulhawy, 1984); Gbr. 3.17
- a (revised API meth, 1987) - a = 0.55 (Reese & Wright, 1988)
QS t a = 0.5(y)-0.5, untuk y ≤ 1.0
a = 0.5(y)-0.25, untuk y > 1.0
- a (Reese & O’Neil,1988); Gbr 3.18
QP
qb
t = Ks’tand
K = 0.8 (open ended piles)
K = 1.0 (full displacement
piles)
d → Tbl. 3.5
QP
qb
t = Ks’tand
K = 0.8 (open ended piles)
K = 1.0 (full displacement
piles)
d → Tbl. 3.5
QP
qb qp = 9c
t = Ks’tand
K = 0.8 (open ended piles)
K = 1.0 (full displacement
piles)
d → Tbl. 3.5
314 430
rope and pulley (bukan free falling)
Prediksi Daya Dukung Tiang Pancang
Tambak Lorok
314 430
rope and pulley (bukan free falling)
Axial Capacity of Single Bored Pile
Based on Data at Sta 1+050
(Tomlinson, 1977)
Ketebalan Lapisan Tanah Yang Harus Diperhitungkan Dalam
Perhitungan Daya Dukung :
D a er a h P en ga r u h P on da si da n M in im a l Keda la m a n
P en yelid ik a n Ta n a h Ya n g D ip er lu k a n u n tu k D isa in
a=4B
Minimal kedalaman
penyelidikan tanah adalah
sampai 4 diameter tiang
b=6-8 B
(atau 5 m) dibaw ah dasar
pondasi
3-4B
Cross section of Soil Investigation
R
1 R
2 Proposed Additional Soil
R
3 R
4 R
4 R
3 R
5 R
5 R
2 R
1
Investigation
3
6.9
5 3
8.2
0 3
1.0
0 4
3.2
0 3
1.0
0 3
8.2
0 3
8.2
0 3
8.2
0 3
6.9
5
BH-202 BT-01 B
T-1
R1 R2 R5 R5 R5 R5 R2 R1
36.95 32.20 28.20 38.20 38.20 38.20 36.97
BH-201 BT-2
Bored Pile Diameter 1,5m, panjang 45m East Side
(STA 1+050)
45m
Dense
Dense
Hard
Very stiff
Very stiff
Hard
Very stiff
Medium stiff
Stiff
Dense
Hard
Very Hard
Hard
Very stiff
Dense
Based on Bored P-0 Bored Pile Kiara Condong
1.20
Meyerhof
Tebal
Skin Friction End Bearing
No. Depth Lapisan Deskripsi N-SPT c (t/m2) Ks Kumulatif Qall (ton)
Qult (Ton)
(m) Cu As or Friction (ton) SF = 2.5
C N atau qNq Ap
0.2N As
0.0 0
1 0.0 - 1.0 1.0 Silty Gravel 0 0.0 1.00 0.0 0 0 0 0
2 1.0 - 2.0 1.0 Silty Gravel 0 0.0 1.00 0.0 0 0 0 0
3 2.0 - 3.0 1.0 Silty sandy clay 5 3.0 0.80 9.0 9 31 40 16
4 3.0 - 4.0 1.0 Silty sandy clay 5 3.0 0.80 9.0 18 31 49 19
5 4.0 - 5.0 1.0 Silty sandy clay 7 4.2 0.62 9.8 28 43 71 28
6 5.0 - 6.0 1.0 Silty sandy clay 11 6.6 0.26 6.5 34 67 102 41
7 6.0 - 7.0 1.0 Silty sandy clay 11 6.6 0.26 6.5 41 67 108 43
8 7.0 - 8.0 1.0 Medium - Stiff clay 6 3.6 0.71 9.6 50 37 87 35
9 8.0 - 9.0 1.0 Medium - Stiff clay 20 12.0 0.40 18.1 69 122 191 76
10 9.0 - 10.0 1.0 Tuffaceous 20 12.0 0.40 18.1 87 122 209 84
11 10.0 - 11.0 1.0 Tuffaceous 31 18.6 0.40 28.0 115 189 304 122
14 11.0 - 12.0 1.0 Tuffaceous 60 36.0 0.40 54.3 169 366 535 214
15 12.0 - 13.0 1.0 Tuffaceous 60 36.0 0.40 54.3 223 366 590 236
16 13.0 - 14.0 1.0 Tuffaceous 37 22.2 0.40 33.5 257 226 483 193
17 14.0 - 15.0 1.0 Tuffaceous 48 28.8 0.40 43.4 300 293 593 237
18 15.0 - 16.0 1.0 Tuffaceous 51 30.6 0.40 46.1 346 311 658 263
19 16.0 - 17.0 1.0 Tuffaceous Silty sand with Gravel 51 30.6 0.40 46.1 392 311 704 282
20 17.0 - 18.0 1.0 Tuffaceous Silty sand with Gravel 57 34.2 0.40 51.6 444 348 792 317
21 18.0 - 19.0 1.0 Tuffaceous Silty sand with Gravel 62 37.2 0.40 56.1 500 379 879 352
22 19.0 - 20.0 1.0 Tuffaceous Silty sand with Gravel 62 37.2 0.40 56.1 556 379 935 374
23 20.0 - 21.0 1.0 Tuffaceous Silty sand with Gravel 54 32.4 0.40 48.9 605 330 935 374
24 21.0 - 22.0 1.0 Tuffaceous Silty sand with Gravel 54 32.4 0.40 48.9 654 330 984 394
25 22.0 - 23.0 1.0 Tuffaceous Silty sand with Gravel 60 36.0 0.40 54.3 708 366 1075 430
26 23.0 - 24.0 1.0 Tuffaceous Silty sand with Gravel 60 36.0 0.40 54.3 763 366 1129 452
27 24.0 - 25.0 1.0 Tuffaceous Silty sand with Gravel 51 30.6 0.40 46.1 809 311 1120 448
28 25.0 - 26.0 1.0 Tuffaceous Silty sand with Gravel 51 30.6 0.40 46.1 855 311 1166 467
29 26.0 - 27.0 1.0 Tuffaceous Silty sand with Gravel 39 23.4 0.40 35.3 890 238 1128 451
30 27.0 - 28.0 1.0 Tuffaceous silt very stiff 39 23.4 0.40 35.3 925 238 1164 465
31 28.0 - 29.0 1.0 Tuffaceous silt very stiff 47 28.2 0.40 42.5 968 287 1255 502
32 29.0 - 30.0 1.0 Tuffaceous silt very stiff 47 28.2 0.40 42.5 1010 287 1297 519
33 30.0 - 31.0 1.0 Gravel with sand noncemented 60 12 45.2 1056 452 1508 603
34 31.0 - 32.0 1.0 Gravel with sand noncemented 60 12 45.2 1101 452 1553 621
35 32.0 - 33.0 1.0 Tuffaceous silty sand very stiff 30 18.0 0.40 27.1 1128 183 1311 525
36 33.0 - 34.0 1.0 Tuffaceous silty sand very stiff 35 21.0 0.40 31.7 1160 214 1373 549
37 34.0 - 35.0 1.0 Tuffaceous silty sand very stiff 35 21.0 0.40 31.7 1191 214 1405 562
38 35.0 - 36.0 1.0 Tuffaceous silty sand very stiff 42 25.2 0.40 38.0 1229 257 1486 594
Maximum end bearing 400 ton/m2
Unplug dan Plug Tiang Pipa
atau Spun Pile
(umumnya pada friction pile)
Unplug dan plug tiang pipa (umumnya pada friction pile)
=
=
=
Unplug dan plug tiang pipa
(umumnya pada friction pile)
Unplug dan plug tiang pipa
(umumnya pada friction pile)
Unplug dan plug tiang pipa
(umumnya pada friction pile)
= = = = =
Static Loading Test
Penyelidikan Tanah Perhitungan Pelaksanaan Tiang
Settlement (mm)
Contoh Penyusunan Uji Pembebanan
Aksial Loading Test
Loading Test Result
1800
1600
1400
1200
Load (ton)
1000
800
600
400
200
0
0 2 4 6 8 10 12 14 16
Settlement (mm)
Lateral Loading Test
Lateral Loading Test
Loading Test
• Test Pile
– Dilakukan hingga tiang mengalami keruntuhan
80
200%
70
60
150%
50
Beban (ton)
1st Cycle
50%
20
10
0
0 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000
Waktu (menit)
Hasil Uji Pembebanan
• Hasil Uji Pembebanan dalam bentuk:
Load (ton)
Settlement (mm)
Kurva Loading Test
Load (ton)
Settlement (mm)
Metoda Interpretasi Hasil Uji Pembebanan
Nilai Maksimum
Nilai Asimtotik
Kriteria Daya Dukung Ultimit Pondasi Tiang
1800
1600
1400
1200
Load (ton)
1000
800
600
400
200
0
0 2 4 6 8 10 12 14 16
Settlement (mm)
Kriteria Daya Dukung Ultimit Pondasi Tiang
Nilai Maksimum
Nilai Asimtotik
Titik asimtotik
2 2.311
Deflection = 2.831 mm @ 90 ton
8
Settlement (mm)
10
Deflection = 9.995 mm @ 180 ton
12
14
16
18
20
0 20 40 60 80 100 120 140 160 180 200
Applied Load (tons)
Interpretasi Berdasarkan Metoda Chin
Figure 4 : Chin Method
Test No.2 on Pile No. 4
0.06
0.05
(mm/ton)
Settlement/Load (mm/tons)
0.04
y = 0.0036x + 0.0193
Settlement/Load
0.03
0.01
0
0 2 4 6 8 10
Settlement (mm)
Settlement (mm)
Kriteria Daya Dukung Ultimit Pondasi Tiang
Settlement (mm)
L=45m, f=60 cm
AXIAL LOAD TEST FOR PILE #22
End bearing
Friction
(plastic deformation)
Elastic deformation
Beban
Friksi
End Bearing
Load Transfer Friksi
Friksi
6% Diameter Pile
displacement
Kriteria Daya Dukung Ultimit Pondasi Tiang
Total Settlement
Elastic Settlement
Relationship between Cohesion and N-Value (Cohesive soil)
2/3 N
Korelasi untuk tanah Clay-Shale
Geotechnical Problem for
Construction of Bored Pile in ClayShale
20.0m 20.0m
Clay Shale
From Reese
From Stoud
C=4N
= 2 N (kPa)
Lempung kaku
Penurunan Tanah Akibat Beban Urukan Reklamasi
Lempung kaku
70 cm
Kondisi Visual
Elevasi awal
Elevasi awal
Elevasi awal
Tiang Pancang
Terekspose
Kondisi Visual
Elevasi awal
Elevasi awal
Beban
Qu = Qp + Qs
Friksi Qu
Q all =
F.S .
End Bearing
Review: Daya Dukung Aksial
Beban
Qu = Qp + Qs - QNSF
Friksi (negatiff)
Friksi (positif)
End Bearing
METODA PERHITUNGAN NEGATIVE SKIN FRICTION :
Negative Skin Friction pada Kondisi Un-Drained :
x Lf Lc Lb
Pfriction
x Lf Lc
area se lim ut
dimana,
a = faktor adhesi
Cu = undrained shear strength dari nilai N – SPT
Ks = Koeffisien lateral earth pressure.
d = interface sudut geser dalam antar tiang dan tanah.
sv = effective overbourden pressure.
Fill material
Soft soil,
Consolidating soil
Bearing soil
KAPASITAS IJIN TIANG YANG MENGALAMI
NEGATIVE SKIN FRICTION (NSF):
Ppositif NSF
Pijin
SF
atau
Ppositif
Pijin NSF
SF
z Lf Le
(Qf ) negatif R z
z 0
z Lf Le
z 0
0 N0 R z
dimana,
so’ = Effective vertical stress at depth z
f = pile diameter
Le = panjang effective dari lapisan yang terkonsolidasi yang menimbulkan
negative skin friction. Lc = 0.75 Le
No = Non dimensional factor.
Soil Type No
a. Uncoated Pile
- Sand 0.35 – 0.50
- Silt 0.25 – 0.35
- Clay 0.20 – 0.25
b. Coated Pile with Bitumen SL pile : = 0.2 ton/m2
Tiang
Tanah
Berat Hammer
Capblock
Helmet
Cushion
Kalendering Waktu Pemancangan
Final Set = ? In/10 blows
Spesifikasi
end bearing = 1 in/ 10 blows
Persyaratan/ Spesifikasi Yang Umum Dipakai
Ru
DSe
Load
S
C=DSe Ru=Pult
Sett
S C
E2 = Ru (S + ½ DSep)
Energy Hammer
Pultimit?
S dan C
Energy Dalam Pemancangan Tiang
Saat Setelah
mencapai tiang Impak
Wr
E1
Wr E2 = E1 eiv
E1 = Energi yg dihasilkan
= ef W r h
Kerja yg dikerjakan selama impak:
Diabaikan
E2 = Ru (S + ½ DSep)
So + DSep + DSes
Ru DSep Ru
AE
L
= Ru (S + ½ )
Ru = Ru
Modified New ENR
ö æç W R + n W p ö
2
æ E .W R .h ÷
=
Qu ç ÷
è S +C ø çè W R + W P ÷
ø
dimana:
E : Efisiensi hammer
C : 0.254 cm untuk unit S dan h dalam centimeter
Wp : Berat tian g
n : koefisien restitusi antara ram dan pile cap
Angka keamanan yang direkomendasikan adalah 6.
Michigan State Highway Commission
æ W
æ 2 .5 H E ö ç R + n 2
W ö
Qu = ç ÷
p ÷
è S + C ø çè W R + W P ÷
ø
dimana:
WR × h
Qu =
S +C
atau
E.H E
Qu =
S +C
dimana:
Qu : Kapasitas daya dukung ultimate
WR : Berat ram (kN)
h : Tinggi jatuh ram (cm)
S : Penetrasi tiang untuk setiap pukulan(m/blow)
C : konstanta, untuk drop hammer = 2.54 cm, untuk steam hamm
er = 0.254 cm
Angka keamanan yang direkomendasikan adalah 6.
Dannish’s Formula
æ ö
ç ÷
ç E.H E ÷
=
Qu ç ÷
ç + E.H E .L ÷
çS 2. Ap .Ep ÷
è ø
dimana:
Ep : Modulus Young dari material tiang
L : Panjang tiang
Ap : Luas penampang tiang
Ang ka keamanan yang direkomendasikan bervariasi dari 3 hingga 6.
Contoh Perhitungan
Diameter PC Spun Pile : 400 mm
Berat Tiang Per m : 200 kg
Berat hammer pemancang : 3,42 ton (K – 35)
Tinggi Jatuh : 1,60 m
Daya Dukung Ultimate yang diinginkan : 210 ton.
Daya Dukung Ijin yang diinginkan : 50 ton.
Panjang tiang : 18m
E.WR .h WR n 2
Wp
Qu
S C WR W p
0.8 x3.42 x1.6 3.42 0.523,6
300
S 0.254 3.42 3.6
18.91
300
( s 0.254) x(7.02)
18.91
300
7.02S 1.783
2106s 534.9 18.91
2106s (523,08)
s 0,248 cm
Final Set adalah 0,248 cm/blow 2,48 cm/10 blows.
Contoh Perhitungan
2.5 H E WR n 2W p
Qu
S C WR W p
2.5 5,5 3,42 0,5 2 3,6
300
S 0.254 3,42 3,6
13.75
300 0.6154
s 0.254
8,461
300
s 0.254
300 s 76,2 8,461
300 s (67,74)
s 0,2258 cm
Final Set adalah 0,225 cm/blow 2,25 cm/10 blows.
Contoh Perhitungan
L
Efisiensi Grup
Tiang:
Salah satu perilaku tiang group adalah ada group effisiensi yang
Berhubunan dengan jarak tiang tunggal dalam group tiang:
P
m
1 2 3 4 n
D
Efisiensi Pondasi Tiang Kelompok pada Pasir
2n 1 n 2 2 d 4D
pn 1 n 2
p=keliling tiang
m
(P/m)
(P/m) P
akibat P VP = =
n nxm
(M/m)
V =
V =
V =
Beban Aksial Terbesar dalam Grup Tiang Akibat Vertikal
m
(P/m)
(P/m) P
akibat P VP = =
n nxm
(M/m)
V =
V =
V =
(P/m)
(P/m) P
akibat P VP = =
n n x m
(M/m)
V =
V =
V =
Beban Aksial Terbesar dalam Grup Tiang Akibat Momen
M
m
(P/m)
(P/m) P
akibat P VP = =
n nxm
(M/m)
V =
V =
V =
Beban Aksial Terbesar dalam Grup Tiang Akibat Momen
m M/4
(P/m)
(P/m) P
akibat P VP = =
n nxm
(M/m)
V =
V =
V =
l3 l2 l1 P1 P2 P3
P1 l1 l2 l
P2 3
P3 P1= l1 a
P2= l2 a
P3= l3 a
M/4= 2 (l1. P1 + l2. P2 + l3 . P3)
M/4= 2 (l1 l1 a + l2 l2 a + l3 l3 a)
P3= l3 a a = M/4 /(2 (l1 l1 + l2 l2 + l3 l3))
Beban Aksial Terbesar dalam Grup Tiang
Akibat Vertikal dan Momen
= Vpt + Vm3
P
.3
n .m
(P/m)
P M
3
akibat P VP =
(P/m)
=
P n . m 2m i
2
n nxm
(M/m)
< Pijin tiang tunggal
V =
V =
V =
M
2 VMi i 2 i .i 2 .i
2
m
M
2m i
2
P=1800 ton
M=12000 tm
4m 4m 4m 4m 4m
1 =2.0m
2 = 6.0 m
3 = 10 m
1800 ton
1800
VP = = 75 ton
6x4
1200 ton
1200 4 2 x 2 2 x 6 2 x 10 2
1200 4 x 2 x (2 2 6 2 10 2 )
1200
1.07
2 4 x 2 x (2 2 6 2 10 2 )
6 140
M2
P VP
VM1
M1
VM2
M2
Consolidation Settlement
of Pile Group
Consolidation Settlement
Pondasi Grup Tiang
di Tanah Lermpung
Settelement of Building Supported by Shallow Foundation
Kantor Pelabuhan
Settlemet Pondasi Dangkal di Tanah Lempung:
6.00 m
1.5 1.5
0.75 m
1 1
2.50 m
Pondasi Dangkal
Settlement Grup Tiang Di Tanah Lempung
Lempung (Clay)
Settlement Grup Tiang Di Tanah Lempung
Lempung terkonsolidasi
Jembatan Suramadu
PONDASI CABLE STAYED BRIDGE
20 m 15 m
100 m 100 m
56 Tiang
Diameter 2.4 m
e 1D
A MBO O, Spac
B
10.0 m
Pemancangan Cerucuk Bambu
Pembuatan Matras bambu
Transfer beban pada Group Tiang:
Soft
Clay
Clay
Hard Layer
(Tomlinso, 1977)
Settlement Grup Tiang Di Tanah Lempung
L
Transfer Beban
Settlement Grup Tiang Di Tanah Lempung
2/3 L
L
Settlemet Pondasi di Tanah Lempung:
6.00 m 6.00 m
1 1
4 4
P P
2
3D 4
D
1
q
Settlement Grup Tiang Di Tanah Lempung
2
3D 4
D
1
q
Settlement Grup Tiang Di Tanah Lempung
2
3D 4
D
1
q
Lempung terkonsolidasi
Settlement Grup Tiang Di Tanah Lempung
2
3D 4
D
1
q
Lempung terkonsolidasi
1:4
1:4
D 2/3 D
Dp?
1. Diasumsikan beban pondasi menyebar secara linier
PEMODELAN KONSOLIDASI PRIMER
kecepatan air
ditentukan perm eabilitas
S
U0 + pegas U0
(tanah)
air
0
Seluruh Seluruh
dipikul air dipikul Tanah
Kurva Test Konsolidasi
Persamaan untuk Menghitung Penurunan Konsolidasi
(Normally Consolidated Clay)
Hc p o Δp av
Cc log
1 eo po
Dimana,
p0 = tekanan efektif akibat berat sendiri
pav = tambahan tekanan efektif akibat
beban diatas lapisan kompresible
e0 = initial void ratio
Cc = compression index
Hc = tebal lapisan lempung
Settlement
Analysis
Settlement
Analysis
Settlement
Analysis
Calculation of Settlement (STA 0+490)
(Tomlinso, 1977)
Transfer beban pada Group Tiang:
(Tomlinso, 1977)
Perhitungan Gaya-Gaya Dalam dan Deformasi
Fondasi Grup Tiang
19 April 2012
PERHITUNGAN PONDASI
Perlu menghitung:
1. gaya-gaya dalam pada setiap tiang penulangan
Sendi (Pinned)
T
Z
T-Z Curve
H
Y
P-Y Curve
P
Y
P-Y Curve T
Z
T-Z Curve
H
P
Tekanan ultimit
Ks
Y
P-Y Curve
X
Y
X
Y
X
Y
X
Y
X
Y