Reduce Sheet Breaks and Blade Change 11,12,13 target from 50
minutes/day to 40 minutes/day
Leader: Patrick Sinion
Feb 2022
Reduce Sheet break Reduction Cost USD/T 50.00 40.00 - Patrick Sinion 107,081
Target
Actual
TAR (%)
Energy Cost
Target (USD/T)
Energy Cost
Actual (USD/T)
Benefit (USD/M)
SDA Reduce Sheet Breaks and Blade Change 11,12,13 target from 50
minutes/day to 40 minutes/day
- TM Control Stock
1 Control Machine Chest Freeness (450 ~ 470 csf), Cons 3.4 ~ 3.55%,
pH 6.3 ~ 6.8
1. Unstable quality Supply pulp 2 Control Broke Deflaked Freeness ( 400 - 420 csf), Cons 3.4 ~ 4.1%, pH All Block Head Feb-22 100%
3.8 ~ 4.1
3 Control Blending LBKP ratio 30 ~50 %
4 Control Broke Ratio 15 ~35 %
- Run felt conditioner 10 ~20 ml/min
Felt issue Compact - Control tension felt 3.5 ~ 4.5 Kn/m
2. - Control SPR Vacuum -0.27 ~ -0.45 bar All Block Head Feb-22 100%
- Using Felt 1240 ~ 1300 gsm to Prolong Felt life time and compactable
(+) Control chemical sprayboom
- Coating 1.4 ~ 2.0 mg/m2 All PIC TM/All
- Release 8 ~ 12 mg/m2
3. Coating on surface yankee not uniform - DAP/MAP 0.7 ~ 1 mg/m2 Vendor Feb-22 100%
- Control Pressure spray boom 4.0 bar Chemical
- Control Coating mixing tank TEMP 45~50C
4. Produce Low Bw 12.5 gsm Control Blending ratio NBKP 10 ~ 15 % All PIC TM Feb-22 100%
Control Temperatur Jumbo ( 50 ~55 Celcius Degree), Frequentcy
5. Produce high Handfeel >35 change Cleaning blade change every Jumbo roll and using Blade 5 All PIC TM Feb-22 100%
degree
- Naikan Headbox 1st pass retention;
- Control slice opening 11-12 mm (issue 1st pass dan consistency)
- Control Head box Circulation 15-20% (issue Formasi dan kelancaran)
6. Setting Head Box Parameters - Control Circulation wire ww tank ke silo channel 100% (issue Formasi All PIC TM Feb-22 100%
dan kelancaran)
- Control PH silo 7.5-8
SDA Reduce Sheet Breaks and Blade Change 11,12,13 target from 50
minutes/day to 40 minutes/day (Febuary Performance)
2. paprima system not working properly Routine flushing paprima tubing, nozzle every schedule shutdown All PIC TM 0Mar-22 0%
3. Poor blades grinding quality - training manpower concerning operating machine grinding All Block Head Mar-22 0%
Build up stock fiber carry on frame machine and Cleaning machine wet end area minimum 2 times Per shift every
4. Nip sheet breaks or Crepe blade change ALL PIC TM Mar-22 0%
Felt issue Compact Felt life time - Control SPR Vacuum -0.27 ~ -0.45 bar
2. All Block Head Feb-22 100%
- Using Felt 1240 ~ 1300 gsm to Prolong
Felt life time and compactable
SDA Reduce Sheet Breaks and Blade Change 11,12,13 target from 50
minutes/day to 40 minutes/day (Febuary Performance)
6. Control Blending ratio NBKP 10 ~ 15 % High Sheet break ontrol Blending ratio NBKP 10 ~ 15 % All PIC TM Feb-22 100%