Visual inspection

(GRINDING MACHINE & DRYING OVEN)


Location- RLS(Pellet
Prepared by- Biswaranjan Sahoo iRISE India Pvt Ltd
Plant)
Inspection tag

(GRINDING MACHINE & DRYING OVEN)


Location- RLS(Pellet
Prepared by- Biswaranjan Sahoo iRISE India Pvt Ltd
Plant)
Visual inspection

(BOLT TIGHTENING MACHINE)


Location- RLS(Pellet
Prepared by- Biswaranjan Sahoo iRISE India Pvt Ltd
Plant)
Inspection tag

(BOLT TIGHTENING MACHINE)


Location- RLS(Pellet
Prepared by- Biswaranjan Sahoo iRISE India Pvt Ltd
Plant)
Visual inspection

(WELDING MACHINE)
Location- RLS(Pellet
Prepared by- Biswaranjan Sahoo iRISE India Pvt Ltd
Plant)
Inspection tag

(WELDING MACHINE)
Location- RLS(Pellet
Prepared by- Biswaranjan Sahoo iRISE India Pvt Ltd
Plant)
Summery
 Welding machine should be physically sound and in working condition.

 Switches should be free from damage and properly insulated.

 Welding and return led connection should be properly tight by means of socket/lugs.

 Portable Grinder should be physically sound and in working condition.

 Portable Grinder Cable should be damage free and always use industrial plug to take power
connection.

 Capacity of Motor should be marked clearly or refer manual

 Once you've tightened the bolts, check them using a calibrated torque wrench.

 When you hear a click sound from the wrench, you know you've reached the proper tightening