EcoStruxure™ Power Design – 4.9.

8 INT Release Notes – July 2022


Ecodial Discover the main updates of our electrical design Software for
Design Firms

New Offers
• PowerTag Energy – M, P, F & R
• ComPacT NS 630b-3200
• Fupact – GSB (32A – 1250A), GSC (32A-125A) & GSD (63A-
1250A)
• Fupact ISFL1250 & ISFT100N
• PrismaSeT S

Offer withdrawal

• Multi 9 offers (Breakers, RCD, Switch)


• Compact C & CM

Features & improvements

• Having the Maximum length of the cable field in the Details tab
• SESU live update
• Microsoft Edge webview integration for authentication

Confidential Property of Schneider Electric | 01


EcoStruxure™ Power Design – 4.9.8 INT Release Notes – July 2022
Ecodial Discover the main updates of our electrical design Software for
Design Firms

Main Resolved Issues

• Application not able to propose KTA / KTC Canalis under source


• Correction on the marketing order of BTS
• Easy breakers solution in the automatic calculation
• NG125LMA curve correction
• LV substation source solution in the final report
• Locking of the RCD lost when we save the project
• The Application is not charging the suitable breakers based on iK1M Short circuit
current, Issue in lighting load
• Breaking capacities of iC60N,H&L Breakers under IT earthing system.
• NSX100F-Micrologic 2.2 / 40A & downstream an iC60H/20A although the Cascading
tables give a reinforced breaking capacity 36kA
• MVS ET5S, ETV5S & ETS5S Isd curve setting intervals
• Single phase Surge Arresters calculation
• File opening issue