North South Commuter Railway

Contract Package S-07 South Depot, Banlic

Alternative LGICT Access Road Plan

04. October. 2023


Index NSCR CP S-07

Introduction

Purpose

BICUTAN
Location of Alternative LGICT Access Road CP S-03
SUCAT

Site Lay-out Plan & Construction Schedule

CP S-07 Banlic Depot


Site Photo

CP S-07
Item for Discussion
Introduction NSCR CP S-07

▣ Introduction

1. The original plan at the time of bidding was to access the site via ①Manila South Road
→ ②Banlic Mamatid Road → ③Villa Palao Road. However, due to changes in the site
conditions of CP S-06 (delay in Site land Acquisition), the original access roads cannot
be used as planned. Therefore, an alternative access road was needed, and this
document is a plan for the alternative access road.

2. ACCESS ROAD/HAUL ROAD OPTIONS:


2.1 Initial usage of the LGICT Access Road is 2 years. Thereafter, the access / haul road
is planned to be shifted along Villa Palao Road
2.2 LGICT access road to be used for the entire project duration.
Purpose NSCR CP S-07

▣ Purpose

1. The purpose of this document/presentation is to coordinate the location and schedule


of the work interface with CP S-06 in connection with the construction and usage of
the alternative LGICT Access road going to CP S-07 site.

2.1 LGEJV to obtain Schedule for the Permanent Road along Villa Palao Road towards
CP S-07 site.
Location of Alternative LGICT Access Road NSCR CP S-07

CP S-07(Depot)

CP S-06 CP S-06
LGICT

Alternative LGICT Access Road

National Road (AH26)


Site Lay-out Plan NSCR CP S-07

Security Point 2

Security Point 5
Security Point 1 Unpaved Road (L=532m)

Security Point 3
Stabilized Road (L=900m)
Security Point 4

Information for Alternative LGICT Access Road


Already Concrete Paved Road 870 meters
Unpaved Road (Leveling and Repairs needed) 532 meters
Stabilzed Road (New Construction) 900 meters
Secure Fencing 386 meters
Basic Barricading 697 meters
Site Lay-out Plan (CP S-06 Drawing) NSCR CP S-07

The Required Occupancy


(Interface Section)
Site Lay-out Plan (CP S-06 Drawing) NSCR CP S-07

CP S-07 (Depot)

Meeting with CP S-06

○ Date : 14-Sep-2023

○ Request Item

1. Arrangement Security guard for


interface section

2. Gate installation for fence


demolition section

3. Detailed plan and drawing for


Interface section

LGICT
Site Lay-out Plan (Detailed Drawing for Interface Section) NSCR CP S-07

CP
S-0
6B
oun
dar

Pi e

12
y

M
r-1
18
5
4M
10.

CP S-07 (Depot)
M
CP S-07 Fence 50
4M
10.

Pie
r-1
18
6
CP
S- 0
6F
LGICT

en c
e
Site Lay-out Plan (Photo for Interface Section) NSCR CP S-07
Site Lay-out Plan (Photo for Interface Section) NSCR CP S-07
Site Lay-out Plan (Detailed Plan for Interface Section) NSCR CP S-07

※ The proposal is under revision and This Plan is subject to change

LGICT CP S-07 (Depot)

L=50M

RC PIPE

① LEFT SIDE ② RIGHT SIDE


Site Lay-out Plan (Detailed Plan for Interface Section & Construction Schedule) NSCR CP S-07

※ The proposal is under revision and This Plan is subject to change

① LEFT SIDE
Base Course (300mm)
② RIGHT SIDE

Embankment
RC Pipe (Depth Varies)

LGICT
CP S-07 (Depot)

2023
Oc t o b e r No v e m b e r
De s c r i p t i o n Re m a rk
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2
D+ 1 D+ 2 D+ 3 D+ 4 D+ 5 D+ 6 D+ 7 D+ 8 D+ 9 D+ 10 D+ 11 D+ 12 D+ 13 D+ 14 D+ 15 D+ 16 D+ 17 D+ 18 D+ 19 D+ 20 D+ 21 D+ 22 D+ 23 D+ 24

Cle a rin g a n d Gru b b in g Cle a rin g a n d Gru b b in g

E x c a v a t i o n ( De p e n d o n S i t e C o n d i t i o n ) E x c a v a t i o n ( De p e n d o n S i t e C o n d i t i o n )

P NR R a i l w a y
In s t a l l a t i o n G e o t e x t i l e & R C p i p e E m b a n k m e n t & C o m p a c t i o n ( Ap p r o x i m a t e l y 2 . 5 m )
In t e r fa c e
S e c t io n
E m b a n k m e n t & C o m p a c t i o n ( Ap p r o x i m a t e l y 2 . 5 m ) T r i m m i n g &Le v e l i n g
Co n s t ru c t io n
S c h e d u le
T r i m m i n g &Le v e l i n g La y i n g &C o m p a c t i o n o f b a s e c o u r s e ( 3 0 0 m m )

La y i n g &C o m p a c t i o n o f b a s e c o u r s e ( 3 0 0 m m )
Site Photo NSCR CP S-07

1
3

2
1

2 3
Item for Discussion NSCR CP S-07

1. Alternative LGICT Access Road Construction Period

○ 2023.10 ~ 2023.12 (Approximately 2 Months)

2. Period of Use

○ Min 24 Months / Max 60 Months

3. Work interface of CP S-06 piers constructions (P1185 & P1186)

○ Alternative Access Road during CP S-06 Construction Period

4. Safety and Site Security between the 2 packages (CP S-07 & CP S-06)

5. Permits that needs to be applied in CP S-06 area

6. Other matters