Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 12

Name: Bassim Thaqil Alshammari.

ID :401800199
Program :Coop program
SKILLS LEARNED

1. I have applied the skills and information that I studied at the institute.
2. I know and I understand the safety rules which must be followed during my training period inside the factory.
3. I understated the process inside my plant (methanol process).
4. I went to the plant every week to see the equipment.
5. I took reading for some equipment
6. Time management.
7. Creativity.
8. Responsibility.
9. Problem Solving.
10. Work under pressure.
11. Team work.
12. Planning and Organizing.
Building: Operation 2
Area(Plant):Plant 3
Process: methanol
Product: methanol.

Company profile:
Ar-razi company Joint Venture 75-25 partnership between SABIC and Japan Saudi Arabia Methanol Company
(JSMC) with objectives to develop, construct and operate chemical methanol plants; and markets its products
internationally. Company established at 1979 and it has over than 600 employees. Also it has 5 methanol Plants
and the Production capacity 4.6M per year .The first shipment of methanol was at 1983. Also it is reached
around +21 countries around the world. Ar-razi it is the 1st largest methanol Complex. As for the products that
Al-Razi takes from the second companies, such as natural gas on which the methanol industry is based, it takes it
from Saudi Aramco and also takes water from a company from MARAFIQ and takes the most important thing,
which is electricity from the Saudi Electricity Company. It also feeds the gas company GAS and Kemya with
oxygen and nitrogen and off gas. Now I am going to talk about when each plant had start and how much the
plant How much production per day and year?.
The Process of methanol. Preheater
PNG
NG boster
H.D.S
K-3101

V- 3101

NG

SL
E-3108 Reactor

FNG
Furnace
Out PG
(H2)

Reactor
Reactor
Reformer (Saturator) (PNG)
PNG
Reformer
Saturator
350 C
E-3222

CP
RG LINE

H.D.S

RG out 350 C
Steam add
SM (Header) boilers 50-47
CP
172 C PNG
SM synthrsis E-4201 A

E-4201 B
Pump A/B P-4222 A/B
BFW
PNG Furnace

E-3222
SM
BOILER
SM Syntises

W W
E-4201 A E-4201 B

To Waste heat boiler


RG
E-4205 A

E-4205 B
Waste heat boiler.

Furnace
E-4201 A
IDF FDF
E-4201 B

E-4206

BFW

Steam Dram

E-4205A

E-3222
RG out

E-4205B
V-4300
RG LINE compressor

Furnace E-4208 N

CCW
N V-4204
T-4505 T-4501 V-4203
Heavy hydro lite column V-420 DFW
Carbone
column
A/B
Waste heat boiler
E-4205 A V-4221
PNG

BFW
CONVECTION
V-4222
E-4206
CP tank.

Waste heat boiler


E-4205 B

P-4222 A/B
Compressors
N
N
RG V-4301 CCW E-4303
SH 80 kg
CCW V-4300 16 kg 80 kg

LP HP HP
K-4301 T
K-4301 1ST K-4301 3RD K-4301 2ND

108 kg
40 kg
SM 40 kg

N
SYNTHESIS
loop
E-4301 CCW V-4301 E-4402
SYNTHESIS Loop ATM SM to reformer stack
PG H2 H.D.S FRG
To reduce the
amount of FNG use
in Furnace

circulator

R-4401A/B
K-4302

BFW
Compressors
E-4405
RG N DMW
E-4404 A

E-4405 A (Fan)

E-4403 B (12 Fan) E-4404 B

CMA TANK
Distillation columns CCW
PMA

V-4501
V-4503
V-4506
T-4501

T-4502
TK-4801

T-4503
RG
Heat exchanger
TK
SL
Heat
exchanger
W.W
RG
SL Heat exchanger
SL
Heat exchanger
Heat exchanger
A/B
A/B