Craneburg Presentation 04-10-22

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 54

CONTENTS

1. OVERVIEW OF CRANEBURG
2. PROJECT EXPERIENCE
3. ASSETS & EQUIPMENT
4. CONCLUSION
SECTION ONE

OVERVIEW
OF
CRANEBURG
OVERVIEW OF CRANEBURG

A transformational world for one-stop infrastructure and


engineering solutions
 Craneburg Construction Company is one of Nigeria’s leading
infrastructure and engineering company offering and delivering single-
source solutions for highly complex infrastructure projects with
presence in different geopolitical regions of Nigeria.

 Our team comprises of local and international experts with extensive


experience in various fields.

 We have successfully completed projects, ranging from EPC


contracts such as ports and airports, roads and bridges, residential
and commercial projects such as towers, restaurants, convention
centers, malls, as well as multipurpose developments.

 Some key projects are; Construction of Indorama multi-purpose


terminal, Onne, Development and construction of port terminal
expansion at Onne port, Construction of Anambra international
airport, Construction of Ogun state agro-cargo airport, Gas
Turbine 6 (GT6) installation and civil works for Indorama
petrochemicals limited, Onne, Reconstruction and upgrading of
Lekki-Epe expressway, Rehabilitation and upgrading of 14km
dual carriageway from Ijebu-ode to Epe, Lagos, Construction and
renovation of number one building (Fmr. IMB), Construction and
rehabilitation of Port-Harcourt towers (old stock exchange
building).
LOCATIONS

UK
• Head offices (Lagos and Port-Harcourt)
• Presence in 13 States
• Over 20 Operational Sites
• Over 2,500 employees (Permanent & Contract)

Lagos Nigeria
Rivers
Abuja
Ondo
Edo
Cross-River
Anambra
Taraba
Ogun
Ekiti
Bayelsa
Imo
Sokoto
PRODUCTS AND SERVICES

AIRPORT/PORTS INDUSTRY
OIL AND GAS
INFRASTRUCTUR
E
• Design • Design
• Construction • Construction • Design
• Expansion • Expansion • Construction
• Refurbishing • Refurbishing • Expansion
• Refurbishing

ROADS AND WATER AND


BUILDINGS
BRIDGES WASTEWATE
R
• Design
• Design • Construction
• Construction • Rehabilitation
• Refurbishing • Reticulatio
• Surfacing Works
• Demolition • n
Earthworks
• Earthworks • Storage
• Excavation
• Maintenance • Treatment
• Drainage works
• Steel works
SINGLE WINDOW SOLUTIONS
Concept to Commissioning

Engineering
• Optimized Solutions

Procurement & Logistics


• Global Resources, Just in Time
Complete
Value Fabrication & Construction
• Safe. Quality. Time & Budget
Chain
Operation & Maintenance
• Lifetime Support

Financing & Equity Investment


• Making it Easy for you
CERTIFICATIONS
SECTION TWO

PROJECT
EXPERIENCE
NUMBER ONE BUILDING (FMR. IMB PLAZA), LAGOS STATE

 Project name- Construction and


renovation of number one building
(Fmr. IMB) project.
 Building rehabilitation of seven (7)
floors.
 Installation of fire fighting system.

 Installation of distribution panels.

 Installation of two (2) standby


generators.
 Construction of 4211 meter square
additional floor spaces.
 Construction of two (2) parking lots
100-meter square each.

Location: Victoria Island, Lagos State


Client: Locodove Ventures
Status: Completed
PORT-HARCOURT TOWER (FMR. STOCK EXCHANGE
BUILDING), RIVERS STATE

 Project name- Design, construction


and rehabilitation of Port-Harcourt
towers (Old stock exchange building).
 Design and construction of a
seventeen (17) storey office building.
 Construction of 16,000 sqm. Of Grade
A offices.
 External and internal parking.

 Access control, CCTV, fire systems,


water and sewage treatment facilities,
sound control systems, lifts etc.

Location: Port-Harcourt, Rivers State


Client: Rivers State Government
Status: Ongoing
ANAMBRA INTERNATIONAL
AIRPORT
 Project name- Construction of Anambra
international airport.

 Engineering, design, and construction of


3.6km, 60m wide concrete runway.

 Control tower building.

 Ground lightning.

 Apron.

 Internal road and car parks.

Location: Awka, Anambra State


Client: Anambra State Government
Status: Completed
OGUN STATE AGRO-CARGO AIRPORT,
IPERU
 Project name- Construction of Ogun
State Agro-Cargo Airport.

 Engineering, design, and construction of


passenger terminal, fire station &
electrical substation, fuel depot, patrol
road, non-instrument navigation, control
tower, apron, terminal and taxiway,
runway, gate, fence and drainage for the
runway.
 2.3km access road

 Airfield & ground lightning.

 passenger terminal, fire station &


electrical substation.

Location: Ikenne, Ogun State


Client: Ogun State Government
Status: Ongoing
INDORAMA MULTI-PURPOSE TERMINAL (PORT FACILITIES),
RIVERS STATE

 Project name- Indorama multi-purpose


terminal (port facilities) is a construction
of 295m concrete jetty and complete
material handling installations and
various PEB buildings (office and
industrial).
 The container terminal annual capacity
of containers and break bulk cargo of
12,000 TEU and 150,000 tons.

 Design, supply, installation and


commissioning of all work was carried
out with a one year warranty for select
facilities.

Location: Eleme, Rivers State


Client: Indorama Eleme Petrochemicals
Status: Completed
PORT TERMINAL EXPANSION PROJECT,
RIVERS STATE

 Project name- Development and


construction of port terminal expansion
at Onne port.

 Demolition, repair, concrete works,


MEP, rerouting of fire water, sewage
and potable water line, installation and
commissioning.

Location: Onne, Rivers State


Client: Indorama Eleme Petrochemicals
Status: Completed
GAS TURBINE 6 (GT6) INSTALLATION, RIVERS
STATE
 Project name- Gas Turbine 6 (GT6)
installation and civil works for Indorama
petrochemicals limited
 Installation of gas turbine (GT-6) along
with all electrical, mechanical, civil,
structural, architectural works for different
buildings, structures, systems and
facilities.

Location: Eleme, Rivers State


Client: Indorama Eleme Petrochemicals
Status: Completed
NEW GOVERNOR’S LODGE (STATE HOUSE), ONDO STATE

 Project name- Construction of the new


Governor’s lodge (State House),
Alagbaka, Akure.
 Structure sits on approximately 2,000
square meters of land and measuring
about 18 meters from the ground floor
to the tip of the iconic roof.
 250 guest banquet hall, basement
parking, indoor and outdoor kitchen,
swimming pool, sitting lounge, atrium
sitting room, bedrooms and other
functional spaces

Location: Alagbaka, Ondo State


Client: Ondo State Government
Status: Ongoing
HOUSE OF ASSEMBLY QUARTERS, PORT HARCOURT,
RIVERS STATE

 Project name- Construction of New


House of Assembly Quarters.
 Design and construction of 32 semi
detached units.
 Banquet hall, Security house, gate
house.
 Internal roads with drainages and
street lighting.

Location: Port-Harcourt, Rivers State


Client: Rivers State Government
Status: Ongoing
RESIDENTIAL ESTATE DEVELOPMENT FOR RIVERS STATE
GOVERNMENT, RIVERS STATE

 Project name- Design and construction


of a residential estate and associated
facilities for Rivers State Government.
 Design and construction of four (4)
high-end, five (5) bedroom villas.
 Fully furnished, along with clubhouse,
swimming pool, internal roads, parking
spaces and greenery.
 Total construction area of 4,000
meters.

Location: Port-Harcourt, Rivers State


Client: Rivers State Government
Status: Completed
PORT-HARCOURT TOWER (FMR. STOCK EXCHANGE
BUILDING), RIVERS STATE

 Project name- Design, construction


and rehabilitation of Port-Harcourt
towers (Old stock exchange building).
 Design and construction of a
seventeen (17) storey office building.
 Construction of 16,000 sqm. Of Grade
A offices.
 External and internal parking.

 Access control, CCTV, fire systems,


water and sewage treatment facilities,
sound control systems, lifts etc.

Location: Port-Harcourt, Rivers State


Client: Rivers State Government
Status: Ongoing
HOUSE OF ASSEMBLY QUARTERS, PORT HARCOURT,
RIVERS STATE

 Project name- Construction of New


House of Assembly Quarters.
 Design and construction of 32 semi
detached units.
 Banquet hall, Security house, gate
house.
 Internal roads with drainages and
street lighting.

Location: Port-Harcourt, Rivers State


Client: Rivers State Government
Status: Ongoing
ALARO CITY – LAGOS STATE

 Project name- Development of Alaro


City.
 Construction of offices, logistics and
warehousing, homes, schools,
healthcare facilities, hotels,
entertainment and 150 hectares of
parks and open spaces..
 Construction of 2.5km main boulevard
roads, drainage and street lighting,
 Installation of water distribution
pipelines & sewer collection systems .

Location: Lekki, Lagos State


Client: Rendeavour
Status: Ongoing
LEKKI – EPE EXPRESSWAY PHASE 1, LAGOS STATE

 Project name- Reconstruction and


upgrading of 18.75km Eti-Osa/
Lekki /Epe expressway (Phase 1) from
Eleko junction to t junction in Epe.
 Provision of reinforced concrete
drains, culverts and median barrier.
 Installation of traffic lights.

 Landscaping of road verges.

 Preservation of rail line corridor with


50m row.
 Installation of street lights.

 Installation of weigh bridges in each


direction of the road.

Location: Lekki, Lagos State


Client: Lagos State Government
Status: Ongoing
MOJODA ROAD, EPE TO IJEBU ODE ROAD, OGUN STATE

 Project name- Rehabilitation and


upgrading of 14km dual carriageway
from Ijebu-ode to Epe.
 The road will have two and a half lanes
in each direction, lay-bys and 14 box
culverts and bridges.
 Refuge/ breakdown lanes.

 Drainages and culverts.

 Installation of street lights.

Location: Ijebu Ode, Ogun State


Client: Ogun State Government
Status: Completed
OTHER PROJECTS
GUZAPE RESIDENTIAL VILLA, ABUJA QUEEN’S DRIVE RESIDENTIAL BUILDING,
LAGOS

PROJECTS DETAILS PROJECTS DETAILS


Location: Guzape, Abuja Location: Ikoyi, Lagos state
Status: Ongoing Status: Ongoing
Project description: Project description:
• Construction of residential villa consisting of main building (3 • Design and construction of residential building
floors), guest house, staff quarters, spa/salon, swimming pool,
gate house, retaining walls/fence, landscaping.
OTHER PROJECTS
ACCESS BANK IKORODU BRANCH, LAGOS STAFF RESIDENTIAL QUARTERS, PORT-
HARCOURT

PROJECTS DETAILS PROJECT DETAILS


Location: Ikorodu, Lagos state Location: Port Harcourt, Rivers state
Client: Access bank plc. Status: Completed
Status: Completed Project description:
Project description: • Construction of high-rise staff residential building.
• Design and construction of ultramodern bank branch at
Ikorodu.
OTHER PROJECTS
ELEME PETROCHEMICAL COMPLEX, PORT- SANGOTEDO PRINCE COURT HOUSING
HARCOURT SCHEME, LAGOS

PROJECTS DETAILS PROJECT DETAILS


Location: Port Harcourt, Rivers state Location: Sangotedo, Lagos state
Client: OIPL Client: Lagos state government
Status: Completed Status: Completed
Project description: Project description:
• Design and construction of two (2) residential buildings and • Design and construction of 5km of internal roads, Installation
residential flats. of 325km uPVC pipes, LV, HV power cable extension, PVC
distribution lines.
OTHER PROJECTS
LASEMA RESPONSE UNIT, EPE, LAGOS ACCESS BANK APAPA BRANCH, LAGOS

PROJECTS DETAILS PROJECT DETAILS


Location: Epe, Lagos state Location: Apapa, Lagos state
Client: Lagos state government Client: Access bank plc.
Status: Completed Status: Completed
Project description: Project description:
• Design and construction of fire station and residential hostel. • Design and construction of ultra modern banking hall.
OTHER PROJECTS
OWERRI- ORLU ROAD, IMO OWERRI- OKIGWE ROAD, IMO

PROJECTS DETAILS PROJECT DETAILS


Location: Owerri, Imo state Location: Owerri, Imo state
Client: Imo state government Client: Imo state government
Status: Completed Status: Ongoing
Project description: Project description:
• Rehabilitation/reconstruction and dualization of 37km Owerri - • Rehabilitation/reconstruction and dualization of 55km Owerri -
Orlu road. Okigwe road.
OTHER PROJECTS
OKITIPUPA –IGBOKODA BYPASS ROAD, ONDO IJEBU ODE – SAGAMU
INTERCHANGE/FLYOVER BRIDGE, OGUN

PROJECTS DETAILS PROJECT DETAILS


Location: Okitipupa, Ondo state Location: Ijebu Ode, Ogun state
Client: Ondo state government Client: Ogun state government
Status: Ongoing Status: Ongoing
Project description: Project description:
• Design and construction of 10km road Okitipupa –Igbokoda • Reconstruction of Ijebu Ode- Epe expressway and Sagamu-
bypass road. Ore interchange, Ijebu Ode/ Odogbolu local government area
(flyover bridge/ interchange over federal highway).
OTHER PROJECTS
OYO- OGBOMOSHO ROAD, OYO STATE BRITISH AMERICAN JUNCTION,
PLATEAU STATE

Location: Ogbomosho, Oyo state Location: Jos, Plateau state


Client: Oyo state government Client: Plateau state government
Status: Ongoing Status: Ongoing
Project description: Project description:
• Construction of 38km Apewo • Design and Construction of
Village Junction to Ogbomosho Interchange (Fly Over) at British
road network. America Junction and
Dualization from British
OTHER PROJECTS
YABA OVERPASS (FLYOVER BRIDGE), LAGOS EKITI RING ROAD TOLL PROJECT- PHASE 1,
EKITI

PROJECTS DETAILS PROJECT DETAILS


Location: Ojuelegba, Lagos state Location: Ekiti state
Client: Lagos metropolitan area transport authority Client: Ekiti state government
Status: Ongoing Status: Ongoing
Project description: Project description:
• Detailed design, traffic management and construction of • Construction, operation and maintenance of a 17.85km Ekiti
overpass (flyover bridge) at Ojuelegba road, Yaba ring road toll project- phase 1 under a (DBFOM) arrangement.
OTHER PROJECTS
MUMUNI ADIO (BUBA MARWA) AND NAVY
REVEREND BRAITHWAITE STREET NETWORK,
TOWN (SECTION 1) ROADS, LAGOS
LAGOS

PROJECTS DETAILS PROJECT DETAILS


Location: Epe, Lagos state Location: Amuwo Odofin, Lagos state
Client: Lagos state government Client: Lagos state government
Status: Ongoing Status: Ongoing
Project description: Project description:
• Construction of 1,028m road networks including • Rehabilitation of 3,560m of road networks including
streetlight installation, drainages and culverts. drainages, culverts, weighbridge and street lighting.
OTHER PROJECTS
TAKUM-LISSAM ROAD, TARABA DUAL CARRIAGEWAY, FLYOVER &
PEDESTRIAN BRIDGES, TARABA

PROJECTS DETAILS PROJECT DETAILS


Location: Jalingo, Taraba state Location: Jalingo, Taraba state
Client: Taraba state government Client: Taraba state government
Status: Ongoing Status: Ongoing
Project description: Project description:
• Construction of 1.5km section of Takum-Lissam road. • Construction of 18km dual carriageway from N.Y.S.C. camp
along Wukari road to Pantinapu city gate along Yola road with
walkways, a bridge, a flyover and six (6) pedestrian bridges
OTHER PROJECTS
DUALIZATION OF IGBOGENE, AIT SECTION ROAD, OWO SELECTED ROADS, ONDO
BAYELSA

PROJECTS DETAILS PROJECT DETAILS


Location: Yenegoa, Bayelsa state Location: Owo, Ondo state
Client: Bayelsa state government Client: Ondo state government
Status: Ongoing Status: Ongoing
Project description: Project description:
• Dualization of Igbogene, AIT section (Outer ring road). • Construction/rehabilitation of 14.511km selected roads in
Owo (Phase B).
OTHER PROJECTS
AKER BASE ROAD, PORT-HARCOURT LAFARGE HOLCIM CONCRETE ROAD, CALABAR

PROJECTS DETAILS PROJECT DETAILS


Location: Port Harcourt, Rivers state Location: Calabar, Cross-Rivers state
Client: Rivers state government Client: Lafarge Plc.
Status: Ongoing Status: Completed
Project description: Project description:
• Design and construction road network with rigid pavement • Construction of 10km highway which cuts through swamp and
(2.8km road network with a width of 17m). dense bush. (This was first time a concrete paving machine
has been used for road construction in Nigeria).
OTHER PROJECTS
LEKKI TRAFFIC CIRCULATION PROJECT (ONIRU), ABULE- EGBA FLYOVER BRIDGE, LAGOS
LAGOS

PROJECTS DETAILS PROJECT DETAILS


Location: Oniru, Lagos state Location: Abule-Egba, Lagos state
Client: Lagos state government Client: Lagos state government
Status: Completed Status: Completed
Project description: Project description:
• Construction of three (3) road networks and five (5) • Design and construction of 81m long flyover bridge,
junctions with rigid pavements. consisting of 8-lanes of highway, with 3km of drainage.
OTHER PROJECTS
EMURE JUNCTION – IYERE JUNCTION, OWO, BENIN – ORE FLYOVER BRIDGE, ONDO
ONDO

PROJECTS DETAILS PROJECT DETAILS


Location: Owo, Ondo state Location: Ore, Ondo state
Client: Ondo state government Client: Ondo state government
Status: Completed Status: Completed
Project description: Project description:
• Design and construction of road network of approximately • Construction of interchange/flyover bridge across Lagos-
7.3km, which includes dual carriageways, sidewalks, drainage, Benin expressway
and lighting.
OTHER PROJECTS
EPE ROADS – PHASE I, LAGOS EPE ROADS – PHASE II, LAGOS

PROJECTS DETAILS PROJECT DETAILS


Location: Epe, Lagos state Location: Epe, Lagos state
Client: Lagos state government Client: Lagos state government
Status: Completed Status: Completed
Project description: Project description:
• Design and construction of road network of 17km, including • Design and construction of road network of 44km, including
dual and single carriageways, sidewalks, drainage, traffic dual and single carriageways, sidewalks, drainage, traffic
signage and lighting. signage and lighting
OTHER PROJECTS
NNAMDI AZIKIWE ROAD, PORT-HARCOURT OLU OBASANJO ROAD, PORT-HARCOURT

PROJECTS DETAILS PROJECT DETAILS


Location: Port-Harcourt, Rivers state Location: Port-Harcourt, Rivers State
Client: Rivers state government Client: Rivers state government
Status: Completed Status: Completed
Project description: Project description:
• Design and construction of a 3.9km dual carriageway of • Rehabilitating and expansion of the road into a double
19m width, with underground drainage. carriageway with a width of 23m and a length of 3km
approximately.
OTHER PROJECTS
IKWERE ROAD, PORT-HARCOURT IGWURUTA ROAD, PORT-HARCOURT

PROJECTS DETAILS PROJECT DETAILS


Location: Port Harcourt, Rivers state Location: Igwuruta, Rivers State
Client: Rivers state government Client: Rivers State Government
Status: Completed Status: Completed
Project description: Project description:
• Expansion of Ikwerre road, to a 22m wide road, with a • Designing and constructing a dual carriageway 14.3km long
walkway, dual carriageway, median separator, and 7km of and 25m wide, with walkway and underground drainage.
underground storm water network.
OTHER PROJECTS
N.B.C. (COCA COLA) PLANT, BENIN OML 58 UPGRADE PHASE 1, RIVERS STATE

PROJECTS DETAILS PROJECT DETAILS


Location: Benin, Edo State Location: Obagi, Rivers State
Client: Nigeria Bottling Company Client: Ponticelli Nigeria Limited/Total E&P Nigeria Limited
Status: Completed Status: Completed
Project description: Project description:
• Rehabilitation and expansion of storage area. • Bush clearing and general civil works for water and sewage
treatments, installation of electrical generators, fuel storage
and fencing.
PROJECT EXPERIENCE LIST

PROJECT TITLE CLIENT STATUS YEAR


Development of Alaro City, Lagos State Rendeavour Ongoing 2021
Construction of Anambra State International Cargo/ Passenger
Anambra State
Airport Runway, Control Tower Building, Ground Lighting, Apron, Completed 2020
Government
Internal Roads and Staff Car Parks
Ogun State
Construction of Ogun State Agro-Cargo Airport Ongoing 2021
Government

Development of Indorama Multi-Purpose Terminal(OIPL) – Jetty and 2013


OIPL Indorama Completed
Port Facilities, Rivers State
Reconstruction of Number One Building ( fmr. IMB Plaza), Lagos
Locodove Ventures Completed 2018
State
Construction of the New Governor’s lodge (State House), Alagbaka, Ondo State
Ongoing 2021
Akure, Ondo State Government
Residential Estate Development for Rivers State Government, Rivers Rivers State
Completed 2020
State Government

Port-Harcourt Tower ( fmr. Stock Exchange Building), Rivers State Private Client Ongoing 2020

Rivers State
Construction of House of Assembly Quarters, Rivers State Ongoing 2020
Government
Reconstruction and Upgrading of Eti-Osa/ Lekki /Epe Expressway Lagos State
Ongoing 2020
(Phase 1) from Eleko Junction to T Junction Epe, Lagos State Government
PROJECT EXPERIENCE LIST
PROJECT TITLE CLIENT STATUS YEAR
Rehabilitation and Upgrading of Dual Carriageway from Mojoda Ogun State
Completed 2020
Road, Epe to Ijebu Ode Road, Ogun State Government
Rehabilitation/Reconstruction and Dualization of Owerri - Orlu Road, Imo State
Ongoing 2020
Imo State Government
Rehabilitation/Reconstruction and Dualization of Owerri - Okigwe Imo State
Ongoing 2020
road, Imo State Government
Design and Construction of 10km Okitipupa –Igbokoda Bypass Road, Ondo State
Ongoing 2020
Ondo State Government
Reconstruction of Ijebu Ode- Epe Expressway and Sagamu- Ore
Ogun State
Interchange, Ijebu Ode/ Odogbolu Local Government Area (Flyover Ongoing 2020
Government
Bridge/ Interchange over Federal Highway), Ogun State
Rehabilitation/Upgrading of Mumuni Adio (Buba Marwa) and Navy
Town (section 1) Roads In Amuwo Odofin L.G.A (Phase 1) of Lagos State
Ongoing 2021
Network of Roads in Ijegun Egba, Amuwo Odofin Local Government Government
Area, Lagos State
Ekiti State
Ekiti Ring Road Toll Project- Phase 1, Ekiti State Ongoing 2021
Government
Lagos Metropolitan
Construction of Overpass (Flyover Bridge) at Ojuelegba Road, Yaba,
Area Transport Ongoing 2020
Lagos State
Authority
Lagos State
Construction of Reverend Braithwaite Street Network, Lagos State Ongoing 2021
Government
PROJECT EXPERIENCE LIST
PROJECT TITLE CLIENT STATUS YEAR
Taraba State
Construction of 1.5km Section of Takum-Lissam Road, Taraba State Ongoing 2020
Government
Construction of 18km Dual Carriageway, Flyover and Pedestrian Taraba State
Ongoing 2020
Bridges in Jalingo, Taraba State Government
Dualization of Igbogene, AIT section (Outer Ring Road), Bayelsa Bayelsa State
Ongoing 2020
State Government
Ondo State
Construction of Selected Roads in Owo, Ondo State Ongoing 2020
Government
Reconstruction of Aker Base Road with Rigid Pavement Including Rivers State
Ongoing 2020
Additional Works, Rivers State Government

Lafarge Holcim Concrete Road, Cross River State Lafarge Holcim Completed 2013

Lekki (Oniru) Traffic Circulation Project, Lagos State Access Bank Plc. Completed 2020
Construction of Reinforced Concrete Dual Carriage Flyover Bridge at
Lagos State
Abule-Egba Junction along Lagos - Abeokuta Expressway including Completed 2015
Government
Additional Works, Lagos State
Construction of Dual Carriageway from Emure Junction-AUD and Ondo State
Completed 2018
from Ministry Of Works- Iyere Junction, Owo, Ondo State Government
Construction of Interchange/ Flyover Bridge across Lagos -Benin Ondo State
Completed 2019
Expressway in Ore, Ondo State Government
PROJECT EXPERIENCE LIST

PROJECT TITLE CLIENT STATUS YEAR


Rehabilitation/ Upgrading Of Strategic Arterial/Inner Roads in Epe Lagos State
Completed 2015
L.G.A (Phase 1), Lagos State Government
Rehabilitation/ Upgrading Of Strategic Arterial/Inner Roads in Epe Lagos State
Completed 2017
L.G.A (Phase II), Lagos State Government

Gas Turbine 6 (GT6) Installation for Indorama Petrochemicals


OIPL Indorama Ongoing 2020
Limited, Rivers State

Port Terminal and Material Handling Expansion Project, Onne, Rivers Ongoing
OIPL Indorama 2020
State

Guzape Residential Villa, Abuja Private Client Ongoing 2020

Queen’s Drive Residential Building, Lagos State Private Client Ongoing 2018

Construction of Access Bank Branch, Ikorodu, Lagos State Access Bank Plc. Ongoing 2020

Construction of Staff Residential Quarters, Rivers State Private Client Ongoing 2020
Design and Construction of Eleme Petrochemical Complex, Rivers Completed 2013
OIPL Indorama
State
Prince Court Scheme Sangotedo, Lagos Including Additional Works, Lagos State
Completed 2018
Lagos State Government
PROJECT EXPERIENCE LIST

PROJECT TITLE CLIENT STATUS YEAR

Access Bank Apapa Branch, Lagos State Access Bank Plc. Completed 2018

Design and Construction of LASEMA Emergency Fire Response Unit Lagos State
Completed 2018
and Hostel, Epe Branch, Lagos State Government

Rivers State
Design and Construction of Nnamdi Azikiwe Road, Rivers State Completed 2013
Government
Rivers State
Rehabilitating and Expansion of Olu Obasanjo Road, Rivers State Completed 2013
Government

Design and Construction of Forces Avenue, Rivers State Rivers State


Completed 2014
Government
Rivers State
Design and Construction of Igwuruta Road, Rivers State Government Completed 2013

Construction of Internal Roads within NYSC Orientation Rivers State Ongoing


Training Camp, Rivers State Government 2019

Rehabilitation of Eleme - Afam Road, Rivers State Rivers State Ongoing 2019
Government
Construction, Fencing And Beautification of Urban Parks Under Mile
One and Mile Four Flyovers along with Road Repairs at Mile One, Rivers State Ongoing 2019
Agip Junction And Ada-George-Rumuokwuta Junction, Rivers State Government
PROJECT EXPERIENCE LIST

PROJECT TITLE CLIENT STATUS YEAR

Rivers State
Rehabilitation of Road Network in Elekahia, Rivers State Ongoing 2019
Government

Construction of Krispy Kreme Buildings, Lagos State Quality Foods Africa Completed 2018

APM Terminals/WACT – Road and Drain Installation – WACT APM Terminals/WACT Completed 2017
Access Road Tt Car Park, Rivers State

Construction of Mgbuoshimini- Rumuolumeni-Nkpor Road, Rivers Rivers State


Ongoing 2020
State Government
SECTION THREE

ASSETS
&
EQUIPMENTS
ASSETS & EQUIPMENTS
 Asphalt Pavers

 Asphalt Batching Plant

 Bulldozers

 Back Hoe Loaders

 Concrete Batching Plant

 Concrete Pumps

 Dump Trucks

 Excavators

 Excavator Loaders

 Low-beds

 Mobile Cranes

 Motor Graders

 Pneumatic Road Rollers

 Skid Steer Loader

 Slip Form Paver Machines

 Tele Handlers

 Wheeled Loaders
ASSETS & EQUIPMENTS
SECTION FOUR

CONCLUSION
CONCLUSION

Commitment To deliver the best infrastructure services whilst maximizing Nigerian content

100% owned equipment's, capable personnel and experience in delivery of


Capability and Capacity similar and major infrastructural projects and services

ISO certified to ensure processes and systems currently in place will


Best practice be used to deliver best practice; ISO 14001:2015, ISO 9001:2015,
ISO 45001:2018

Our services are specifically tailored to maximize effectiveness and efficiency,


Cost Efficiency delivering a quality product on time and within budget.

You might also like