PRESENTATION ON

BRIDGE

WELLCOME TO MY PRESENTATION
CE-3106
Structural Analysis & Design -II (Sess)
PRESENTATION ON BRIDGE

Submitted To Prepared By
Dr. Md. Rezaul Karim MD.Nazmul Hoque
Professor
Department of Civil St.Id. : 131097
Engineering, DUET
Dept. : CE
Md.Al-Amin Shikder
Year/Sem. : 3/2
Lecturer
Department of Civil
Engineering, DUET
DIFFERENT CASE OF BRIDGE:

Advantage:
• Determinate Structure
• No stress due to differential settlement.

Disadvantage:
• Large magnitude of bending moment requiring.
• Bigger & heavier Section.
Advantage:
• Magnitude of maximum moment reduce.
• Resulting of economic section.

Disadvantage:
• Large BM due to uneven settlement.
DATA:
Bridge Length: 100ft
Bridge Width: 30ft with 2 lane
Bridge Span: 2.6*L= 2.6*100=260ft
No. of girders: 5
Width of Girder: 15in
Load types: HS15
Wearing Surface: 30psf
f’c : 5ksi
fy : 60ksi
DESIGN
Spacing:
d=
c/c spacing: =
Assume Thickness= 6” = 2.99’’
DL Slab: =
Wearing Surface= 30psf
Total DL= 105psf
MDL= As=
MLL= =
I= =0.4in2
I=0.3 Use #5@
MIMP= MLL*I
Distridution reinforcement
=2.38*.3
=0.714k’/ft
Asdb=0.67As=0.67
MT= .41+2.38+.714=3.504k’/ft
Use #@8’’ c/c
R=
=
=0.3915
Depth= 6’’
Using #5 @ 9’’c/c as main reinforcement
#4 @ 8’’c/c as distribution reinforcement
CROSS GIRDER
Load Calculation
Wearing surface = 30
Slab
Rectangular Part of girder
Triangular part of main girder
Load from cross girder
Size
Size lb
Size
LIVE LOAD
ANALYSIS
LIVE LOAD SHEAR:
K
MOMENT