Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 33

WELCOME TO MY

PRESENTATION

ALAMGIR HOSSAIN
ID : 131107
CE – 3/2
SECTION : B
PRESENTATION ON

DESIGN OF THE SUPERSTRUCTURE OF A CANTILEVER


BRIDGE FOR GRAVITY LOADING
DIFFERENT CASE OF BRIDGE
DISCONTINUOUS

Advantage:
Disadvantage:
• Determinate Structure
• Large magnitude of bending moment requiring.
• No stress due to differential settlement.
• Bigger & heavier Section.
Advantage:
• Magnitude of maximum moment Disadvantage:
reduce. • Large BM due to uneven settlement.
• Resulting of economic section.
ADVANTAGES OF BOTH THE SIMPLE SUPPORTED & CONTINUOUS SPAN CAN BE RETAINED & DISADVANTAGES CAN
BE ELIMINATED BY INSERTING STRUCTURAL HINGES AT SOME OF THE POINT OF CONTAFLEXTURE……..
DATA
 BRIDGE LENGTH: 100FT
 BRIDGE WIDTH: 30FT WITH 2 LANE
 BRIDGE SPAN: 2.6*L= 2.6*100=260FT
 NO. OF GIRDERS: 5
 WIDTH OF GIRDER: 15IN
 LOAD TYPES: HS15
 WEARING SURFACE: 30PSF
 F’C : 5KSI
 FY : 60KSI
DESIGN THE DECK SLAB
Spacing:
d=
c/c spacing: =
Assume Thickness= 6” = 2.99’’
DL Slab: =
Wearing Surface= 30psf
Total DL= 105psf
MDL= As=
MLL= =
I= =0.4in2
I=0.3 Use #5@
MIMP= MLL*I
Distridution reinforcement
=2.38*.3
=0.714k’/ft
Asdb=0.67As=0.67
MT= .41+2.38+.714=3.504k’/ft
Use #@8’’ c/c
R=
=
=0.3915
Depth= 6’’
Using #5 @ 9’’c/c as main reinforcement
#4 @ 8’’c/c as distribution reinforcement
CROSS GIRDER DESIGN
LIVE LOAD
ANALYSIS
LIVE LOAD SHEAR

BBBBBBB
MOMENT
MOMENT CHART
THANK YOU