Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 4

Qualified repair inspectors

• Pre‐ and Post‐placement inspections


and testing
• Training modules (education) and
knowledge / performance exams
(certified)
• QA / QC program
• Understand – why and how of good
repair

Qualified repair inspectors


• Pre‐ and Post‐placement inspections and testing
• Training modules (education) and knowledge / performance exams (certified)
• QA / QC program
• Understand – why and how of good repair
Brisbane

Conduits, Pipes, and Culverts


Associated with Dams and Levee
Systems
A1

Torsional behavior of glass textile-reinforced plus millions more, with a free trial
beams with minimum transverse reinforcements: Experimental study
• reduce the time spent on project preparation. However, there is need to exercise
• utmost care in their design to bring about economy in the overall cost ofthe project. With this objective in
• view, the revised Special Publication No. 13 "Guidelines for the Design of Small Bridges and Culverts"
• taking into account a number ofmajor changes made
2020 – started in 2000
• Develop a repair code
• Develop repair specifications
• Code for repair of existing concrete
structures
• First version published in 2013
• Adoption and use of ACI 562
• Statewide adoption in HI, OH, FL,
others ongoing
• Referenced in ACI 318, ACI 369
• Referenced in NYC DOB TPPN
• Referenced in LA

You might also like