Professional Documents
Culture Documents
Tahapan Konstruksi Jetty
Tahapan Konstruksi Jetty
Tahapan Konstruksi Jetty
300
150
Daftar Isi
-Tahap Perencanaan.
-Persiapan Lahan
-Rekayasa
-Tahap Pelaksanaan
Coastway :
(+2.74 mMSL)
+3.50 mLWS
1:
2 2
1:
+0.25 mLWS
Coastway Layout
AT AU AV
(+2.74 mMSL)
2
1:
+1.00 mMSL
±0.00 mMSL
2
1:
0 kg
~35 kg
k 300 50 rock 5~10 kg
roc k 30~
roc
SECTION C-C
Coastway Long Section
Struktur Trestle
Coastway Layout
Jetty Layout
Coast way
BALOK
POER
TIANG PANCANG
3. Desain Balok Pra-cetak
4. Desain Plat Lantai Pra-cetak
Survey works
Coast way
Pile head treatment
3. Pengecoran Di Tempat
Cutting Pile
Double pile cap – spun pile
Single pile cap – spun pile
Special case on joint
Special design on jointing
Beam installation
The jointing rebar
Beams installation
Beams - installation
1st slabs layer - concreting
1st slabs layer - concreting
1st slabs layer - installation
1st slabs layer - installation
Slab rebar - jointing
Slabs rebar - jointing
Slabs concreting
Final elevation - slabs
Cantilever structure
Fender structure
Fender installation
Fender installation
Kansteen -rebar
Side wall - kansteen
Side wall
Pembuatan kansteen
Trestle - final