3.1.

Street Hierarchy and Connectivity


CTM Char Rasta

Arterial Sub-Arterial Collector Local Railway Line Metro


Dead-end 2 -Way 3-Way 4-Way 5-Way & Above

41% 21% 38%

20.1%
Area under Roads
0.74
Connected node ratio
1.61
Link node ratio
Source : Primary Survey
3.2. Block and Walkability
CTM Char Rasta

Less than 200m 201-400m 401-600m


601-800m 801-1000m Above 1000m

574.5 m
Average Block Perimeter
Lowest block perimeter: 84.1m
Walking Time = 2 minutes

Highest block perimeter: 1,785.7m


Walking Time = 30 minutes
Source : Primary Survey
3.3. Walkability Audit
CTM Char Rasta

Walkability Score
0-3 4-6 7-9 10-12 13-15
Very Poor 24.4% Poor 0% Average 45.6% Good 30% Excellent 0%

24.4%
Of streets have walkability
0%
Of streets have footpaths of
score below 6 >1.5m on both sides
Source : Primary Survey
3.4.
Street Activity Mapping
CTM Char Rasta

LEGEND:
Carriageway
Unpaved areas
Tree Cover
Vending Activities
Pedestrians crossing
1.2m Carriageway- 18m 1.2m at non-designated
crossings

Scale- 1 : 500 Key Map


Source : Primary Survey