ON

TRAINING

OHE
1 – INTRODUCTION ON RAILWAY ELECTRIFICATION
 Systems on Indian Railways
 Major Advantage of 25kV AC
 Why 25kV A.C has been adopted?
 Why 25kV is upgraded to 2x25kV A.C?
 Voltage Profile of Section
 Harmonics
 Technology
 Substation Spacing
 Improvements on Train Operation
 Merits of the System
 Demerits of the System
 Brief of 2x25kV A.C Electric Traction System

Transportation Infrastructure I RSBG L&T Construction | 2


2 – VARIOUS TYPES OF OHE

Transportation Infrastructure I RSBG L&T Construction | 3


3 – TERMINOLOGY / BASIC RULES & CLEARANCES
Setting Curve Allowance
Distance/Implantation
Track Center Cantilever Assembly
Radius of Curvature  Stay Arm
Versine  Bracket Arm
Mast Deflection  Register Arm
Super Elevation  Steady Arm
Chainage  Bent Steady Arm
Obligatory Location
Track Separation Encumbrance
Rail Level
Displacement of Pantograph
Axis due to Super Elevation

Transportation Infrastructure I RSBG L&T Construction | 4


4 –OHE SUPPORTS AND SPS
Masts Selection of Mast

Independent Structures Small Parts of Steel

BFB Mast

B-Series Mast

Fabricated Mast

Bridge Mast

Portal Structures

Drop Arm

Two/Three Track Cantilever Structure


Transportation Infrastructure I RSBG L&T Construction | 5
5 – BASICS OF OHE
Height of Contact Wire - for IR and DFCC

Gradient of Contact Wire – Absolute and Relative

Span and Clear Span

Stagger – for IR and DFCC

Tension on Contact Wire and Pre-Sag of OHE & Push-Up & Oscillation

Jumpers – In-Span (‘H’), Turnout (‘G’), Uninsulated (‘G’), Potential

Equalizing Jumper (‘F’) & Anti-Theft Jumper (ATJ)

Droppers

Overlaps – UIOL, IOL, Need of Overlap and Overlap Location


Transportation Infrastructure I RSBG L&T Construction | 6
5 – BASICS OF OHE (CONT..)
Turnouts & Cross-over - Obligatory Mast and Track Separation

Auto-Tensioning Device

Tension Length

Different Types of Insulators

Neutral Section

Section Insulator

Isolators

Blocks & Demand for Proper power Blocks – Traffic Blocks, Power Blocks,

Operation and Earthing


Transportation Infrastructure I RSBG L&T Construction | 7
5 – BASICS OF OHE (CONT..)
Pantograph Entanglements, Reasons & Precautions – OHE Defect,

Pantograph Defects & External Defects

Different Types of Boards and Number Plates

Feeding Post, Sectioning Post & Sectioning and Paralleling Post

Clearances – Electrical, Working, Positive Conductor to Negative

Conductor & OHE to Earthing Part

Track Slewing and Effect on OHE

OHE Conductors – Catenary, Contact, Large Span, Feeder, Aerial Earth

Wire, Buried Earth Conductor & Anti-Creep Wire.


Transportation Infrastructure I RSBG L&T Construction | 8
6 – AUXILLIARY TRANSFORMER OR LT SUPPLY
TRANSFORMER

Transportation Infrastructure I RSBG L&T Construction | 9


7 – BRIEFING OF OHE DESIGN DRAWINGS & ASSOCIATED
OHE DRAWINGS
ASSOCIATED OHE DRAWINGS

 Engineering Scale Plan (ESP)

 Signal Interlocking Plan (SIP)

OHE DESIGN

 General Power Supply diagram (GPSD)

 Sectioning Diagram

 Survey

 Pre pegging plan


Transportation Infrastructure I RSBG L&T Construction | 10
7 – BRIEFING OF OHE DESIGN DRAWINGS & ASSOCIATED
OHE DRAWINGS (CONT..)
 Pegging Plan

 OHE Layout Plan (LOP)

 Cross Section Drawing (CSD)

 Structure Erection Drawing (SED)

 Wire run Diagram

 Profile Drawing (Clearance study Drawings)

 As Build/ As erected Drawings

 Station Working Rule Diagram (SWR )


Transportation Infrastructure I RSBG L&T Construction | 11
8 – EXECUTION
(A) EXCAVATION Cantilever Erection

Foundation Casting CW & MW stringing

Mast Erection Droppering & clipping

Mast Grouting Post Wiring ( Jumpering )

Earthing & Bonding Cantilever Adjustment

SPS Erection ATD ( X & Y Adjustment) Cutting

BEC Laying SED checking

NFW/AEW stringing Tower Car checking / Pantograph Run

Transportation Infrastructure I RSBG L&T Construction | 12


8 – EXECUTION (CONT..)
(B) SEQUENCE OF OHE EXECUTION WORK

(C) TOOLS AND PLANTS USED FOR OHE

(D) OHE BREAKDOWNS, THEFT CASES & ITS TYPES AND QUICK RESTORATION -

 OHE Breakdowns

 Theft cases & its types and quick restoration

 Temporary & Permanent restoration of OHE

(E) NECESSITY OF SLEWING OF OHE. PRECAUTION AND TOOLS REQUIRED FOR

SLEWING OF OHE

Transportation Infrastructure I RSBG L&T Construction | 13


9 – COMMISSIONING & ENERGIZATION
CURRENT COLLECTION TEST

TOWER WAGON CHECKING

PRE-COMMISSIONING TEST / CHECKS

MAINTAINING OHE

 Special Checks

 OHE checking by Tower Wagon

 Seasonal Checks

Transportation Infrastructure I RSBG L&T Construction | 14


10 – SAFETY RULES

SAFETY RULES FOR WORKING ON OHE


 General
 Stand-By Emergency Vehicle
 Earthing of OHE before commencement of work
 Rules for use of ladders
 Rules for use of Tower Wagon
 General responsibility of Supervisory Staff
GENERAL QUESTIONNAIRES FOR SAFE WORKING ON OHE
ACCESS TO TRACK AND PRECAUTIONS IF TAKEN IN EMERGENCY DURING COMMERCIAL
HOURS AND NIGHT

Transportation Infrastructure I RSBG L&T Construction | 15


11 – MONITORING OF MATERIAL PLANNING &
HOUSEKEEPING

TRACTION (OHE) STORES MONITORING & COORDINATION

FABRICATION WORKSHOP & MONITORING

Transportation Infrastructure I RSBG L&T Construction | 16