Cluster summary

Portfolio Statistics Energy Performance Indicators


• Total # of sites: • % of clean energy: ?? (Target:86%)
• # of Access sites VDC: • Energy intensity (MWh/TB): ??
• # of Access Sites TowerCo: (Target:1.2)
• # of Technology Centres: 4 • PUE (ICT kWh/Total kWh): ?? (Target:
msc , drp, mariapolis, kamukol 1.6)
• # of RCS sites: • Fuel Consumption (litres):
• # of sites off Grid VDC: • Grid Consumption (kWh): Consumption KPI
• # of sites Off Grid TowerCo: • Solar Consumption (RCS):
• # of new sites: • Energy split per segment:
• # of Upgraded sites: Access sites VDC (%), RCS (%), TC(%),
Compliance to Best practices RISKS
• # of grid connected sites:0 • Grid failures:
• # of grid metered sites: 0 • Electricity Bills not received:
• # of check metered sites: • Sites with very low autonomy:
• # of fuel monitored sites : Compliance RISKS
• Any other relevant risks;
• # of RAN Sites with HPS:
• # of sites with autonomy < 4h:

C1 Public
Fuel analysis: High Fuel consumption (Top 10)
Energy Intensity (MWh
Site ID Site Name Fuel (liters) Explanations
per TB) if access sites

Insert Confidentiality Level in slide footer 4 12 January 2024


C1 Public
Fuel analysis: High fuel variance (Top 10)
Site ID Site Name Fuel (litres) Variance (%) Explanations

Insert Confidentiality Level in slide footer 5 12 January 2024


C1 Public
Portfolio Change : Upgrade/Downgrade/New sites/Disposal
Energy Expected completion
Project Name # of sites Project Description Comments
Impact dates
Increase/
Decrease/Not sure

Insert Confidentiality Level in slide footer 6 12 January 2024


C1 Public
Energy Performance Project (In Progress): Progress Status
# of SOW Expected
Project Name Budget Current Status % Completion Comments
sites completed? completion dates
Access Sites
AC meters
Technology Centres
AC meters
Access sites fuel
monitoring
Technology Centres
Fuel Monitoring
Grid Connection

Grid Restoration

HPS deployment

Battery Upgrade
Energy savings
Features Activation

Insert Confidentiality Level in slide footer 7 12 January 2024


C1 Public
Energy Performance Project (Completed): Savings Achieved
Project Budgeted YTD Actual
Project Name # of sites Completion date Comments
Description Savings Savings
Grid Connection

Grid Restoration

HPS deployment

Battery Upgrade

Energy savings Features


Activation
Solar Deployment

Mini-Grid connection

…………………..

…………………………

Insert Confidentiality Level in slide footer 8 12 January 2024