Brief Introduction

On
Electro Mechanical Work

march 2022
1
Outline

Dam Instrumentation
Pipe Installation
Valve Installation

2
Dam Instrumentation

 Piezometer
 V-Notch
 Monument
 Staff Gauge

3
Dam Instrumentation Cont.….
Piezometer (Casagrande )
 Used to the measure pore water pressure
 Open stand pipe piezometers are
recommended due to economical and practical
aspects

4
Dam Instrumentation Cont.….
Piezometer cont..

5
Dam Instrumentation Cont.….
Piezometer cont..
ab\DAM INSTRUMENT\PIEZOMETRY.dwg

6
Dam Instrumentation Cont.….
 Piezometer installation location( eg.kufa bobasa)

7
Dam Instrumentation Cont.….
 Piezometer installation location( eg.kufa bobasa)

8
Dam Instrumentation Cont.….
 Piezometer installation location( eg.kufa bobasa)
Station Piezometer Transverse
Piezometer List Section Elevation Range (masl) Remark
(CHAINAGE)(m) Location

1557.5-1562.5 Pore Water pressure Measuring Zone (FOUNDATION PIEZOMETER)


CENTER OF DAM
PZ1 A-A 0+330
CREST
1562.5-1575.6 Sealed zone (Use Bentonite Seal)

Pore Water Pressure Measuring Zone (EMBANKMENT


1562.5-1575.6
PIEZOMETER)
PZ2 B-B 0+420 CENTER OF DAM CREST

1575.6-1578 Sealed zone (Use Bentonite Seal)

1551-1554 Pore Water pressure Measuring Zone (FOUNDATION PIEZOMETER)


CENTER OF DAM
PZ3 C-C 0+470
CREST
1554-1575.6 Sealed zone (Use Bentonite Seal)

Pore Water Pressure Measuring Zone (EMBANKMENT


1562.5-1575.6
CENTER OF DAM PIEZOMETER)
PZ4 D-D 0+520
CREST

1575.6-1578 Sealed zone (Use Bentonite Seal)

1557.5-1562.5 Pore Water pressure Measuring Zone (FOUNDATION PIEZOMETER)


CENTER OF DAM
PZ5 E-E 0+600
CREST
1562.5-1575.6 Sealed zone (Use Bentonite Seal)

9
Dam Instrumentation Cont.….
Piezometer installation location

ab\DAM INSTRUMENT\sent\HAYU KENTERI DAM\HAYU KENT
ERI DAM INSTRUMENTATION (PIEZOMETER ) DESIGN AND
LOCATION.dwg
 ab\DAM INSTRUMENT\sent\kufa Bobasa
\KUFA BOBASA DAM INSTRUMENTATION (PIEZOMETER ) DES
IGN AND
LOCATION.dwg
 ab\DAM INSTRUMENT\sent\MERER DAM\MERER DAM INSTR
UMENTATION (PIEZOMETER ) DESIGN AND
LOCATION.dwg

10
Dam Instrumentation Cont.….
Piezometer Specification
ab\Piezometer spec..xlsx

11
Dam Instrumentation Cont.….
V-Notch
 Leakage measurement is one of the most
important indicator of the overall performance
of earth/rock-fill and concrete dams.
 The quantity of water to be released into
the irrigations water supply system can be
measured by installing water meters (V-
notch weirs)
12
Dam Instrumentation Cont.….
V-Notch cont..

13
Dam Instrumentation Cont.….
V-Notch cont..

14
Dam Instrumentation Cont.….
V-Notch installation location

15
Dam Instrumentation Cont.….
Monument
 Used for the measurement of vertical and
horizontal displacements
 Located at selected points on the dam crest.
 Permanent bench marks located outside the
influence of the dam and reservoir will serve as
the main reference points from which all
surveying works for the control of vertical
and horizontal displacements commence
16
Dam Instrumentation Cont.….
Monument cont..

17
Dam Instrumentation Cont.….
Staff Gauge
 The Reservoir Water Levels will be measured
by means of staff gauges installed on the walls
of the intake tower and on the banks of the
reservoir where observation and maintenance
could be useful in observing the flood
magnitude.

18
Dam Instrumentation Cont.….
Staff Gauge cont..

19
Pipe Installation

20
Pipe Installation cont..

21
Pipe Installation
 Steel Pipe specification
 ab\pipe spec.docx

22
Pipe Installation cont..
 Pipe fitting
Flange

Flexible Coupling

23
Valve Installation
 Valve location
Intake
Outlet

24
Valve Installation
 Type of valve
Butterfly Valve

 Gate valve

Sliding gate valve

25