Electro Mechanical Training by WAYUMA
Electro Mechanical Training by WAYUMA
Electro Mechanical Training by WAYUMA
On
Electro Mechanical Work
march 2022
1
Outline
Dam Instrumentation
Pipe Installation
Valve Installation
2
Dam Instrumentation
Piezometer
V-Notch
Monument
Staff Gauge
3
Dam Instrumentation Cont.….
Piezometer (Casagrande )
Used to the measure pore water pressure
Open stand pipe piezometers are
recommended due to economical and practical
aspects
4
Dam Instrumentation Cont.….
Piezometer cont..
5
Dam Instrumentation Cont.….
Piezometer cont..
ab\DAM INSTRUMENT\PIEZOMETRY.dwg
6
Dam Instrumentation Cont.….
Piezometer installation location( eg.kufa bobasa)
7
Dam Instrumentation Cont.….
Piezometer installation location( eg.kufa bobasa)
8
Dam Instrumentation Cont.….
Piezometer installation location( eg.kufa bobasa)
Station Piezometer Transverse
Piezometer List Section Elevation Range (masl) Remark
(CHAINAGE)(m) Location
9
Dam Instrumentation Cont.….
Piezometer installation location
ab\DAM INSTRUMENT\sent\HAYU KENTERI DAM\HAYU KENT
ERI DAM INSTRUMENTATION (PIEZOMETER ) DESIGN AND
LOCATION.dwg
ab\DAM INSTRUMENT\sent\kufa Bobasa
\KUFA BOBASA DAM INSTRUMENTATION (PIEZOMETER ) DES
IGN AND
LOCATION.dwg
ab\DAM INSTRUMENT\sent\MERER DAM\MERER DAM INSTR
UMENTATION (PIEZOMETER ) DESIGN AND
LOCATION.dwg
10
Dam Instrumentation Cont.….
Piezometer Specification
ab\Piezometer spec..xlsx
11
Dam Instrumentation Cont.….
V-Notch
Leakage measurement is one of the most
important indicator of the overall performance
of earth/rock-fill and concrete dams.
The quantity of water to be released into
the irrigations water supply system can be
measured by installing water meters (V-
notch weirs)
12
Dam Instrumentation Cont.….
V-Notch cont..
13
Dam Instrumentation Cont.….
V-Notch cont..
14
Dam Instrumentation Cont.….
V-Notch installation location
15
Dam Instrumentation Cont.….
Monument
Used for the measurement of vertical and
horizontal displacements
Located at selected points on the dam crest.
Permanent bench marks located outside the
influence of the dam and reservoir will serve as
the main reference points from which all
surveying works for the control of vertical
and horizontal displacements commence
16
Dam Instrumentation Cont.….
Monument cont..
17
Dam Instrumentation Cont.….
Staff Gauge
The Reservoir Water Levels will be measured
by means of staff gauges installed on the walls
of the intake tower and on the banks of the
reservoir where observation and maintenance
could be useful in observing the flood
magnitude.
18
Dam Instrumentation Cont.….
Staff Gauge cont..
19
Pipe Installation
20
Pipe Installation cont..
21
Pipe Installation
Steel Pipe specification
ab\pipe spec.docx
22
Pipe Installation cont..
Pipe fitting
Flange
Flexible Coupling
23
Valve Installation
Valve location
Intake
Outlet
24
Valve Installation
Type of valve
Butterfly Valve
Gate valve
25
Thank you