Benchmarking
International Company Existing
No Deliverable parameters Unit of measure
benchmarking position
Blow Room
1 Temperature 0C 27-30 27-30
Relative Humidity:-
60-65
2 Mixing % 60-65
50-55
Blow Room 50-55
3 Efficiency % 70-75 75
4 Production kg/line/shift 1350/scutcher 1450/scutcher
5 Blow room dropping % 4 1-3
Cleaning efficiency of Blow
6 % 55-65 55
room
7 Sweeping waste % 1 0.5
8 Invisible loss & gutter loss % 1.5 1
Fire sensors & metal
9 Weekly weekly weekly
detectors checking
10 Jossi Vision shield checking Daily Daily Daily
11 Bale Management System Daily Bale Management Lot Management
23.01.24 Seite 1 1
Seite
3.Benchmarking
International Company
No Deliverable parameters Unit of measure
benchmarking Existing position
Carding
1 Temp 0C 27 - 30 27-30
2 Relative Humidity % 50 - 55 45-50%
3 Efficiency % 85-90 90%
320 kg/for
4 Prod/card/shift Kg/KG 320 Trutzschler
23.01.24 Seite 3 3
Seite
3.Benchmarking
International Company Existing
No Deliverable parameters Unit of measure
benchmarking position
Drawing
Efficiency of Rieter Finisher
1 % 80 - 85 80-85
Drawing
Finisherr Rieter Drawing
2 % 2.0 2.0
sliver Unevenness
3 Sliver waste % 0.5 0.5
Roving
1 Production/ spindle /shift kg 4 kg/(HK rov 1.00) 4.2kg/spdl/shift
2 Roving frame Efficiency % 80-85 80-85
4.0 for carded
3 Roving Unevenness % 3.5
3.5 for combed
Speed frame end
4 % 3-4 2
breakages
5 Roving waste % 0.3 0.3
23.01.24 Seite 4 4
Seite
3.Benchmarking
Company
Deliverable International
No Unit of measure Existing
parameters benchmarking
position
Ring Spinning
7 Loss due to Doffing % 0.8 0.97
3.4
Yarn contraction for TPM 40S=1000
8 % 3.4
Twist Multiplier 4.00 TPI=25.4
TM=4.02
Pneumafil & Roller
9 % 2.5 0.2
bonda
2011
Carded=87.7
Combed=72.5
Carded= 87.5
10 Yarn Realization % 2012
Combed=71-73
Carded=87.3
Comber=72.7
Rotor Utilization 97
2 %
YARN REALISATION 87 89
20s=1.70
Rotor prod in 16= 2.38
3 % 10s=3.0
kg/Rotor/Shift 10= 3.90
7S/1=4.5
Auto coner
5 Auto Coner Efficiency % 70-75 78-80
20s=12 23.01.24 Seite 7 7
Seite
Auto Coner Prod in
3.Benchmarking
Quality control Auditing
23.01.24 Seite 8 8
Seite
3.Benchmarking
International Company Existing
No Quality parameters
Standard Position
20=3.5
13 Roving U% 30/40S=3.0 40s=3.5
20s16.5 20s=17
30s=17 30s=17
14 Ring Frame Count RKM 40s=17 40s=18
60s=18
60s=20.5
20s=1700
No instrument to
15 CSP 30s=1800
40s=2000 check
30s=1
30=0.71
16 Count CV % 40=0.75 40s=1
60s=.1.0 60s=1
No instrument to
17 Test CV% 2.5
check
18 TPI CV% 2.0 2.0
40s
20S CH=8
COMPACT=7.72
19 Yarn U% 30sCH=8.7
40sCH=9.5 40SCH=8.76
23.01.24 Seite 9 9
Seite
3.Benchmarking
International Company Existing
No Quality parameters
Standard Position
30=0
Compact40sCHs=00
20 Thin places 40=2
60s=5 40sCH=00
20=7
Compact40s=2.3
21 Thick places 30=15
40=35 40s CH=6
20=10
Compact40s=3.8
22 Neps 30=25
40=30 40sCH=33
20=17
40Compact=6.1
23 Total IPI 30=40
40=67 40sCH=39
20=16
Compact40s=17
24 RKM 30=16.5
40=17 40s CH=19.7
20=9
25 RKM CV % 30=8.5 Not available
40=8.5
Parameters
Length 30.01 MM Australian S M Leo 5/32
Mic 4.29
Maturity 0.89%
Uniformity 81.7
SFI 8.4
Strength 32.4 GMS/TEX
Elongation 5.3%
Moisture 7.0%
Actual Situation:
现状
提高细纱机运作速度
Actual Situation:
The unit consumption for producing 1 kg of 21s yarn (UKG) is
3.75 kWh as against 2.0 kWh at 40s combed conversion .The
average production/day in the year 2012 was appx 39 t
现状
生产 1 公斤 21 支纱线的单位能耗( UKG) 是 3.75 千瓦时,而不是
2.0kwh (国际标准) . 2012 年的天平均产量总计约为 39 吨
23.01.24 Seite
Seite 19
1919
Seite
Seite 19
4. 节能措施
节能点 3 : Speed increase of Ring Frames
细纱机提速
Optimised Situation:
If the mill could have produce 5% more production, the consumption & cost of power for
Humidification plant, chiller, compressor & lighting would remain same or almost constant
which accounts appx. 30-35% of total power costs
最佳情况:
如果产量提升 5% ,增湿车间、制冷、空压和照明的能耗及其费用将基本保持不变,而这些设备
在总能耗中占比 30-35%
23.01.24 Seite
Seite 20
2020
Seite
Seite 20
4. 节能措施
节能点 3 : Speed increase of Ring Frames
Optimised Situation:
If energy saving would like to be achieved, equipment could be turned off after 95% of actual
production time.
最佳情况:
要节能,设备在实际生产时间的 95% 后应关闭。
Energy Consumption 能耗值 6822万 kWh/a 每年 7100 万千瓦时
Energy Consumption HP, chiller, compressor & lighting, …
增湿车间,制冷,空压和照明设备的能耗 35%
Savings 节能率 5%
Energy Savings 节能值 119.4万 kWh/a 每年 124.3 万千瓦时
Electricity tariff 电价 0.68CNY/kWh 每千瓦时 0.68 元
Energy saving 节能值 81.2 万 CNY/a 每年 84.5 万元
Investment 投资 0CNY 0 元
Pay back periode 投资回收期 - a 无
23.01.24 Seite
Seite 21
2121
Seite
Seite 21
4. 节能措施
节能点 4 : Illumination 照明
Actual Situation 现状 :
FOTO
23.01.24 Seite
Seite 22
2222
Seite
Seite 22
4. 节能措施
节能点 4 : Illumination 照明
工厂的照明程度太高
纺织业照明标准(;勒克斯)
Department 工序 Good Average Poor
Blow room, humidification
plant & packing 开清棉、增 50 40 < 25
湿和包装车间
Preparatory
70 50 < 40
准备纺纱
Spinning, doubling & TFO
100 75 < 60
纺纱、并纱和倍捻
Post spinning 后纺 150 100 < 60
23.01.24 Seite
Seite 23
2323
Seite
Seite 23
4. 节能措施
节能点 4 : Illumination 照明
Optimised Situation: The authority can switch off a few rows of tube light to reduce
power consumption by 10% or otherwise there are 2 lights in one shade. One tube light
can be taken out from the shade keeping only one tube light in one shade. In this way
the mill authority can save energy consumption by 10%.
先进模式:主管可以关掉几排灯,节约 10% 的能耗
Energy savings 能源节约率 10%
Energy savings 节约的能源总计 7.6万 kWh/a
Electricity tariff 电价 0.68CNY/kWh
Energy saving 节约的能源价值总计 5.1 万 CNY/a
Investment 投资 0CNY
Pay back period 投资回收期 - a
•The Mill having 18 transformers with a capacity of 24.76 MW. The consumption load of
transformers are appx 40% instead of 60-65%. The Management should think how to
increase load at 50-60% to reduce energy loss.
•厂里共有 18 个总容量为 24.76 兆瓦的变压器,变压器载荷约为 40% ,没达到 60-65% 。
•领导应考虑如何提升至 60-65% 减少能源损失。
•There are 3 compressors installed in the factory. Out of 3, one compressor is working
continiously, one intermittently and the 3 rd one is idle. The base compressor which is
working continuously is loosing its life span than the compressor which is working
intermittently. Hence both the compressors should be used to run continuously alternately
every week.
•厂里有 3 个空压机,其中 1 个是持续运作的,另一个是间歇性运作,第 3 个没有用起来,持
续运作的空压机比间歇运作的空压机损耗大,因此需要每周交替使用这两个空压机,平衡两
者负担。
•There is no colour coding in Card & Blow Room pipe lines for easily
understanding which pipe line is carrying raw materials & which pipe
lines for waste or micro dust.
This should be done for detection & easily attending break down.
开清棉和梳棉车间内原棉、废棉和微尘三条管道没有标上不同颜色进行
区分。做颜色标记可以帮助检查和分析故障。