Safety Weekly Highlights

 DG1 Health and Safety


 23rd Jan 2024
Content
 Infrastructure, Site Wide Logistics and Adobe
processing facilities
 Bujari, Samhan, Wadi Hanifah, DSQ Districts &
Northern Cultural District
02  Incidents and Significant Near misses
 Weekly HSE Activities
Bujari, Samhan, Wadi  Achievements
Hanifah,  Major HSE Highlights / Critical Activities
 Major HSE Concerns
 Next week Look ahead Major Construction activities
Incidents and Significant Near misses

HSE Statistics – Wadi Hanifa –Zone F

Description Week # 113

Near Miss 0

Site Observations 31

Fatality 0
Lost Time Incidents (LTI) 0
Environmental Incidents (EI) 0
Medical Treatment Cases (MTC) 0
First Aid Injury (FAI) 0
Fires 0
Motor Vehicle Accidents (MVA) 0
Property Damage 0
Incidents and Significant Near misses

HSE Statistics – Wadi Hanifa – At-Turif Lighting

Description Week # 113

Near Miss 0

Site Observations 16

Fatality 0
Lost Time Incidents (LTI) 0
Environmental Incidents (EI) 0
Medical Treatment Cases (MTC) 0
First Aid Injury (FAI) 0
Fires 0
Motor Vehicle Accidents (MVA) 0
Property Damage 0
Weekly HSE Activities
Individual Site HSE Award & Celebrations
Project HSE Walkthrough HSE Meeting Focused Inspection
Inspections Campaigns /Training

Samhan Car Park

Al-Zallal

Samhan Residential Early Work

DGCL HQ Offices

BSH

Wadi Hanifa Assets (landscaping) 0 1 11 2 3

BU-DAF
Incidents and Significant Near misses
Brief :
No incident or Near Miss was reported for this week Type:

Action taken: Location:


Immediate Actions:
• N/A.
00:00 a.m.
Recommended and corrective actions:
• N/A. 00/00/2024

Picture
Achievements
Wadi Hanifah - Asset Pictures

landscaping project (Badan):

• (12) TBT Conducted on Site. Hazardous waste


• management
Occupational Health & Safety Training: Hazardous waste management training
training.
and Slip Trip and falling hazards Training.

• Focus Inspection Conducted: Waste management and Fire protection.

At-Turiaf Lighting project (Enpro): Slip Trip and falling hazards


Training

• (5) TBT Conducted On Site.

• Focus Inspection Conducted: Fire protection.

HSE induction for MOS. Power tools inspection.


Critical Activities – WH

No. Activity / Task Project / Location MSRA Remark

WH-WHG-605-0000- Code-A
BDN-MTS-CE-000001/
1 HOT WORK For installation of hoarding fence. Zone- F
WH-WHG-605-0000-
BDN-MTS-LA-000008
Stone Paving & Curbs Activities for walkways Zone- F WH-WHG-605-0000- Code- A
2
(Hardscape work) BDN-MTS-LA-000003
Major HSE Concerns
Wadi Hanifa - Assets

 No Major HSE Concern for this week activities.


Next Week Look ahead Major Construction Activities
Wadi Hanifa – Assets

landscaping Project: At-Turaif Lighting Project:

 Planting (Planting Plants & maintenance) in zone- F.  Light Fixtures Installation, and Alignment of lights..
 Preparation of sitting area (Installation of furniture) in zone F.  Hiding cables in gravel / Mashashco, alignment,
 Cladding stones around electrical panel & gate columns in zone Reflector and casement replacement for some
F. lights.
 Installation of Cladding Stone for Sunken Area in zone F.
 Stone Paving & Curbs Activities for walkways (Hardscape work) in
zone F.
 Stone Paving & Curbs Activities for walkways (Hardscape work) in
zone F.
 Testing & commissioning Reverse Osmosis (RO System) in zone F.
 Pipe Culvert – extension of pipe for F & D1.
 Planting & Irrigation work for Sport Boulevard- wadi Hanifa (small
excavations, soil mixing and planting) in Wadi Hanifah Sport
Boulevard-Wadi Hanifa.
Waste Management and Onsite storage
Pictures
Activity Number of Number of Number of closed Number of daily
inspection observation raised observation cleaning conducted
conducted by the contractor

Waste Yard Continuous


04 01 03
Material Yard
Material yard Continuous
01 01 00
Housekeeping Continuous
03 04 04

Major Observations

Positive: Waste Container Waste Yard replaced with empty


 A dedicated housekeeping team is maintaining proper housekeeping on site. full one
 Temporary Storage area for material storage
 Designated waste yard area .
 Litter picking ongoing

Areas for Improvement:


 Proper removal of unwanted material from material yard, Litter Picking
 Maintain the Housekeeping around skip bin