ELECTRIC POWER PLANT

PREPARED BY :- B S Mule
TGT( W E )
INDEX
1)Working Principal
2) Factors for Selection of Site
3) General Arrangement of Hydro-electric
Plant
4) Constituents of Hydro-electric Power
Station
5) Advantages and Disadvantages
Working Principal

 Hydro-electric power plant utilizes the potential


energy of water stored in a dam built across the
river.
 The potential energy of the water is used to run

water turbine to which the electric generator is


coupled.
 The mechanical energy available at the shaft of

the turbine is converted into electrical energy by


means of the generator.
Factors for Selection of Site

1. Availability of water
2. Storage of water
3. Distance from load centers
4. Cost and type of land
5. Transportation facilities
6. Head of water
Arrangement of Hydro-electric Plant
Constituents of Hydro-electric Power
Station
1. Dam
2. Spillways
3 .Surge Tank
4. Penstocks
5 .Water Turbines
6. Draft tube:
7. Tail race:
8. Step-up transformer:
9. Power house:

You might also like