Platreef Smelter

Wet Gas Cleaning Plant Scope

+
07 June 2023

Copyright © Hatch 2023. All Rights Reserved.


Agenda
• Safety share
• Introduction
• Off-gas sizing
• Scope of work
• Timeline

Copyright © Hatch 2023. All Rights Reserved.


Safety Share – Safety Controls

Copyright © Hatch 2023. All Rights Reserved.


Introduction

Copyright © Hatch 2022.


2023. All Rights Reserved. 4
Introduction
• Ivanplats - Platreef Smelter and BMR PFS (greenfield)
• Define the flowsheet
• Determine the capital required
• Located in Limpopo, 10km South of Polokwane
• Conventional flowsheet
• Electric arc smelting
• Peirce-Smith converting
• SO2 abatement for primary off-gas treatment

Copyright © Hatch 2023. All Rights Reserved.


Phased Implementation
Phase 1 – 41% Phase 2 – Full
smelter throughput smelter throughput
~ 2 years

- ~36% furnace - Full furnace power


power rating rating
- 1 PSC operating - 2 PSC operating
and 1 in rebuild and 2 in rebuild

Copyright © Hatch 2023. All Rights Reserved.


Off-gas sizing

Copyright © Hatch 2022.


2023. All Rights Reserved. 7
Primary Gas Handling (Phase 1)
TO ATMOSPHERE

15,400 - 24,500 Nm /h
3

3.0 – 1.8 vol.% SO2


600 - 850 °C
bypass

DUST RECYCLE
SECONDARY
TO FURNACE
Furnace only OFF-GAS STACK
TO ATMOSPHERE
23,100– 42,000 Nm3/h
2.4 – 1.1 vol.% SO2
60 - 66 °C
33,800 – 38,900 Nm3/h
11.4 vol.% SO2 117,600 – 151,600 Nm3/h
3.7 – 3.2 vol.% SO2
1,250 °C
62 °C

WGCP WSA

WET GAS STACK

Acid Production

Copyright © Hatch 2023. All Rights Reserved.


Primary Gas Handling (Phase 2 – Full Capacity)
TO ATMOSPHERE

15,300 - 25,500 Nm /h
3

8.3 – 4.7 vol.% SO2


600 - 850 °C
bypass

DUST RECYCLE
SECONDARY
TO FURNACE Furnace only OFF-GAS STACK
23,200 – 42,400 Nm3/h TO ATMOSPHERE

5.5 – 2.7 vol.% SO2


60 - 66 °C
67,700 – 82,800 Nm3/h
213,500 – 276,700 Nm3/h
11.5 vol.% SO2
4.2 – 3.8 vol.% SO2
1,250 °C
62 °C

WGCP WSA

WET GAS STACK

Acid Production

Copyright © Hatch 2023. All Rights Reserved.


Gas Handling Design Requirements

Parameter Units Nominal Design


Outlet temperature °C 30 35
Pressure kPa(g) Consultant to confirm
Total solids, as dust and fume mg/dNm3 <1
Chlorides, as Cl mg/dNm3 <1
Fluoride, as HF mg/dNm3 <0.2
Total acid mist, as 100% H2SO4 mg/dNm3 <20

Copyright © Hatch 2023. All Rights Reserved.


Scope of work

Copyright © Hatch 2023. All Rights Reserved.

Copyright © Hatch 2022. All Rights Reserved. 11


Equipment Sizing
• Confirm that the WGCP can be designed as a single gas train
capable of handling the full design volume of EF and
converter off gas as well as any fluctuations in operating
conditions.
• Lowest overall CAPEX
• Ease of maintenance and operation
• Be energy efficient.

Copyright © Hatch 2023. All Rights Reserved.


Scope of work
• Budget quote for technology (equipment sizing)
• Engineering costs associated with the design and fabrication
• Costs associated to on-site support, commissioning and
training of operators
• Consumption rates for major utilities.

Copyright © Hatch 2023. All Rights Reserved.


Timeline Requirements
• Hatch is required to provide a CAPEX report (inclusive of the
WGCP budget quote) to the client by end of June 2023.

Copyright © Hatch 2023. All Rights Reserved.


Thank you