DOCS 80 - SOLAR

26th July 2023

PCI Gases Business Confidential


DOCS 80- Solar

Project scope: Solar panels shall cater the power to operate DOCS 80
(estimated 1~2 hours with current setup), with ON-Grid has an alternative option.

Project Updates:
 Inverters and batteries for the experimental setup has been successfully
installed.
 Solar panel installation expected to be completed within this week.
 All relevant risk assessments have been completed with the team's agreement
and assistance.
Risk Assessment Link :

Solar powered DOCS 80 (Green DOCS)

PCI Gases Business Confidential


EXPERIMENTAL SETUP

Off grid

Number of
Battery sizing or Solar panels
hours of Inverter capacity (kW) Area Required(sq.m) Cost in Lakhs
to Inhouse load sizing(kW)
operation

1 400 Ah Battery 8kW 3-P 2.18 10.48 ₹ 316,590.00

4 800 Ah Battery 8kW 3-P 4 20 6.1 L

1000Ah 2 volts
8 8kW 3-P 8.17 39.33 13.4 L
stacked Batteries

1600Ah 2 volts
12 12kW 3-P 13.08 62.9 18.4 L
stacked Batteries

3000ah 2 volts
24 8kW 1-P X 3 24.5 117.9 33.9 L
stacked Batteries

PCI Gases Business Confidential


EXPERIMENTAL SETUP

ON grid (Up to Sanction load of the utility Solar panel sizing)

Number of hours of To/From grid or In Inverter capacity Solar panels sizing (kW) Area Required(sq.m) Cost in Lakhs
operation house load

1 50000 2.18 10.48 ₹ 2.50

4 60000 4 20 ₹ 3.30

8 70000 8.17 39.33 ₹ 4.60

12 80000 13.08 62.9 ₹ 6.20

24 90,000 17.44 83.9 ₹ 10.56

4
PCI Gases Business Confidential
ON- GRID SCHEMATICS

PCI Gases Business Confidential


OFF-GRID SCHEMATICS

PCI Gases Business Confidential


INDIGENISED DOCS 80

Project scope: Docs 80 with output specifications

 FLOW : 80LPM
 TARGET PRESSURE : 100psi
 Purity : <93%
 NOISE LEVEL : less than 50dBA
.

 Preliminary Technical Assessment: P&ID

 Preliminary Commercial Assessment: Our present VSA-based plant is proving to be a little pricey. So, we
devised an alternative strategy which is Indigenized DOCS.

 Preliminary Financial Assessment: Our budget for developing this indigenous DOCS is 8-9 Lakh/11,000 USD.