Professional Documents
Culture Documents
Docs 80 Solar
Docs 80 Solar
Project scope: Solar panels shall cater the power to operate DOCS 80
(estimated 1~2 hours with current setup), with ON-Grid has an alternative option.
Project Updates:
Inverters and batteries for the experimental setup has been successfully
installed.
Solar panel installation expected to be completed within this week.
All relevant risk assessments have been completed with the team's agreement
and assistance.
Risk Assessment Link :
Off grid
Number of
Battery sizing or Solar panels
hours of Inverter capacity (kW) Area Required(sq.m) Cost in Lakhs
to Inhouse load sizing(kW)
operation
1000Ah 2 volts
8 8kW 3-P 8.17 39.33 13.4 L
stacked Batteries
1600Ah 2 volts
12 12kW 3-P 13.08 62.9 18.4 L
stacked Batteries
3000ah 2 volts
24 8kW 1-P X 3 24.5 117.9 33.9 L
stacked Batteries
Number of hours of To/From grid or In Inverter capacity Solar panels sizing (kW) Area Required(sq.m) Cost in Lakhs
operation house load
4 60000 4 20 ₹ 3.30
4
PCI Gases Business Confidential
ON- GRID SCHEMATICS
FLOW : 80LPM
TARGET PRESSURE : 100psi
Purity : <93%
NOISE LEVEL : less than 50dBA
.
Preliminary Commercial Assessment: Our present VSA-based plant is proving to be a little pricey. So, we
devised an alternative strategy which is Indigenized DOCS.
Preliminary Financial Assessment: Our budget for developing this indigenous DOCS is 8-9 Lakh/11,000 USD.