ITY GOLD MINE

Geotechnical
Daily report
January 29th , 2024

Mining Department
BAKATOUO PIT HAZARD ZONE MAP JUNUARY 29th 2024
NE
POSSIBLE CIRCULAR/PLANAR SHEAR FAILURE ZONE

 Crack and planar relict structure in hold failure areas;


 Water seepage ,make proper surface water drainage
 Constant movement with velocity << 2 mm/hr since last 24 hrs monitoring
 safety bund wall on the 190 mRl
 In the event of rain fall, all employees should evacuate this zone.
 No equipment parking or idling under this zone
 Stay at least 20m away from the highwall.

Potential stability problem.

Potential stability problem.


Crack exist at ± 215 mRL,
ITY PIT HAZARD ZONE MAP JUNUARY 29th2024
N
POSSIBLE ROCKFALL/ TOPPLING FAILURE ZONE
SW  Loose block and hanging material
 Deviate the ramp after all mining done
POSSIBLE CIRCULAR/PLANAR SHEAR FAILURE ZONE  In the event of rain fall, all employees should
evacuate this zone.
 No equipment parking or idling under this zone
 Water still coming from the wall and ponding at  Stay at least 20m away from the highwall.
toe ,keep surface water around the failure area.
 Steady state movement with velocity << 2 mm/hr since
last 24 hrs monitoring
 Continue buttress to support the wall
 In the event of rain fall, all employees should evacuate
this zone.
 No equipment parking or idling under this zone
 Stay at least 20m away from the highwall.

2024/01/17 There are 2_3 loose rock fragments


hanging

Dec 29th 2023


Failure face E
POSSIBLE ROCKFALL/ TOPPLING FAILURE ZONE
 Loose block and hanging material
 Make bund wall (3m distance from the actual crest 165 mRL)
165 mRL  In the event of rain fall, all employees should evacuate this
zone.
 No equipment parking or idling under this zone
160 mRL
 Stay at least 20m away from the highwall.
LEPLAQUE PIT HAZARD ZONE MAP JUNUARY 29th 2024

SW
POSSIBLE CIRCULAR/PLANAR SHEAR AND WEDGE FAILURE ZONE

 Crack and planar relict structure in hold failure areas

 Continue buttress to support the wall ( 240 mRL)

 In the event of rain fall, all employees should evacuate this zone.

 No equipment parking or idling under this zone

 Stay at least 20m away from the highwall.

2024/01/23
Failure 2 occurred the
January 11th
Failure 1 occurred 2024
the January 09th
2024

260 mRL

Buttress material 250 mRL


242.5 mRL

240 mRL
DAILY TASK

No LOCATION PROJECT TASKS (% progress)

- wall sign off


1 Bakatouo - news prisms installation

-Follow Safety bund wall at 165 mRL ( 40 % )


2 Ity
- Follow Wall Buttress at south wall failure and seepage area ( 40 % )
-RTS plastform near dispatch ( 0 %)
3 Leplaque _ Wall buttress ( 40 %)

4 General - housekeeping of all RTS shelters

- all pit inspection continues

You might also like