RP

EXP-COMP

Dryers

KOD SEP-II
SEP- I

Chiller
Filters
R.G. Comp LGC

LEF Compressor

GT
Propane Pentane HP Lean Gas
RG Heater LPG

MP Lean Gas

LEF Gas

SBPS
LEF Column Propane Column SBPS Column
LPG Column
Train-11

RP

E-107 EXP-COMP

Dryers

V-101 V-102 E-109 V-103


KOD SEP- I SEP-II

Chiller
Filters
R.G. Comp LGC

LEF Compressor

Propane
GT
LPG HP Lean Gas
RG Heater E-102
E-104
E-108 MP Lean Gas

LEF Gas

E-103 E-105

NGL to SBPS
Column
LEF Column LPG Column E-106 Equipment Summary
LEF-II Column
PROPANE Column
Offsites and Utilities
Equipments
• Vessels
• Heat Exchangers
• Pumps
• Compressors
• Columns
PUMPS
Ht/Length
OD (mm) (mm) Type MOC*
11-V-101 Feed Gas Knock Out Drum 3200 4200 V CS
11-V-102 Separator-I 3400 6200 V LTCS

11-V-103 Separator-II 3400 5600 V


11-V-104 LGC suction K.O.D. 3800 4700 V CS
11-V-105 Regeneration gas moisture separator 1200 3650 V CS
11-V-106 LEF-I reflux drum 1600 4200 V CS

11-V-106A LEF-II reflux drum 1600 4200 V LTCS


11-V-107 LPG reflux drum 1600 4000 H CS
11-V-108 Hot Water expansion vessel 1600 3800 H CS
11-V-109 Hot Water Chemical dosing vessel - - V CS
11-V-110 Fuel Gas K.O.D. 900 1800 V CS
11-V-111 Blow Down drum 2000 4200 V SS-304
11-V-112 Methanol Pot 2200 4400 V CS

11-V-113 Flare gas K.O.D. 3200 12000 H CS (Charpy)


11-V-114 R.G. Discharge K.O.D. 1200 2300 V CS
11-V-122 Propane Column Reflux Drum 1200 3600 H CS
11-V-123 Propane Refrigerant Accumulator 2800 8400 H CS
11-V-124 Propane 1st Stage Suction K.O. Drum 2400 3350 V LTCS
11-V-125 Propane 2nd Stage Suction K.O. Drum 1600 4300 V CS
11-V-126 Propane Refrigerent Flash Pot 1800 3300 V LTCS
11-V-128 Hot Water Expansion Vessel-II 1200 3000 H CS
11-D-101 A/B FEED GAS DRYERS 54.2 61/76.5 25 65 - 320 CS
11-V-105 REG. GAS MOIS. SEPERATOR 18.5 26.5 40 100 CS

11-V-106 LEF REFLUX DRUM 21.8 26.5 -40.2 (-) 45 - 65 LTCS

11-V-106 A LEF REFLUX DRUM-2 21.8 76.5 -40.2 (-) 45 - 65 LTCS


11-V-107 LEF REFLUX DRUM 11 15 44.4 65 CS

11-V-108 HOT WATER EXP.VESSEL 8 12 136-144 160 CS


11-V-109 CHEM. MIX DRUM 1 10/30 65 LS

11-V-110 FG. K.O. DRUM 19 26.5 40 (-) 20 - 65 CS

11-V-111 BLOW DOWN DRUM 3 6 -100/45 (-) 120 - 15 SS-304


11-V-112 METHANOL POT 1.05 4.5 35 65 CS
11-V-113 FLARE K.O.DRUM 1.5 4.5 0 -45 CS
11-V-114 RES. GAS COMPR. 31.7 40 40 65 CS

11-V-122 PROPANE COUMN REFLUX DRUM 15.7 20 43.5 65 CS


11-V-123 PROPYLENE ACCUMALATOR 16.82 24 40 65 C.S.

11-V-124 C5 5 STG. SUCTION K.O.D. 1.2 24 -44.3 (-) 50 - 65 LTCS

11-V-125 C3 2nd STAGE SUCTION K.O.D. 4.41 24 -9.5 (-) 27 - 65 C.S.

11-V-126 C3R FLSSH POT 1.2 24 -44.3 (-) 50 - 65 LTCS (1)

11-V-128 HOT WATER EXPANDOR 8 10 100 160 CS

11-V-129 PROPY.UNLOAD. COMPR SUCT.K.O.D. 2/16.8 24 8-40 65 CS


HEAT EXCHANGERS

11-E-101 Feed Gas Chiller 10.92 10.9 Brazed Aluminium


11-E-102 LEF Condenser 1.35 1.42 Charpy CS SS Alloy Steel

11-E-103 LEF reboiler 2.93 4 C.S. C.S.


11-E-104 LPG Condenser 4.158 4.16 C.S. C.S.
11-E-105 LPG Column reboiler 3.421 3.5 C.S. C.S.
11-E-106 NGL Cooler 0.26 0.26 C.S. C.S.
11-E-107 Regeneration gas cooler 4.5 4.5 C.S. with SS-304L Clad Duplex
11-E-108A Lean Gas Comp. Inter Cooler 5.4 5.4 C.S. C.S.
11-E-108B Lean Gas Comp. after cooler 2.17 2.17 C.S. C.S.
11-E-109 Exp. Comp. after cooler 1.276 1.28 C.S. C.S.
11-E-110 Blowdown vaporizer 0.64 0.64 C.S. C.S.
11-E-111 Waste heat exchanger 7.69 7.69 C.S. C.S.
11-E-112 R.G. Compr. After cooler 0.88 0.88 C.S. with SS-304L Clad Duplex
11-E-121 LEF-II Reboiler 2.15x1.1 CS CS
11-E-122 Propane column condenser 1.73x1.1 CS CS
11-E-123 Propane column reboiler 1.278x1.1 CS CS
11-E-124 Hot Water Heater 3.52x1.1 CS CS
11-E-125 Propane condenser 5.69x1.1 CS CS
11-E-126 LEF-II Ovhd. Condenser 2.13x1.1 Alloy Steel Alloy Steel
11-E-127 Propane 1st Stage Vaporiser 0.11x1.1 CS CS
PUMPS

11-P-101 A/B LEF Reflux Pumps Centrifugal 37.2 61 m C.S. C.S.


11-P-101 C/D LEF Reflux Pumps Centrifugal 41 3.3
11-P-102 A/B LPG Col Reflux & Transfer Pumps Centrifugal 90 146 m C.S.
11-P-103 A/B Methanol Injection Pumps Reciprocating 4 60 kg/cm2 SS-304/316
11-P-104 A/B Hot Water Circulating Pumps Centrifugal 180 97.3 m C.S. C.S.
11-P-105 A/B Chemical Dosing Pumps Metering (Recip) 0.07 12 kg/cm2 S.S. S.S.
11-P-121 A/B Propane Col Reflux & Transfer Pumps Centrifugal 60 7.5 C.S. C.S.
11-P-122 A/B Hot Water Circulation Pumps Centrifugal 100 3.5 C.S. C.S.
11-P-124 A/B Propane Refrigerant Transfer Pump Centrifugal 10 20.4
COMPRESSORS

11-EK-101 Feed Gas Expander Turbine 3150 -


Compressor Centrifugal 3150 Expander
11-K-101 Lean Gas Compressor Centrifugal 7300 Gas Turbine
11-K-102 A/B Residue Gas Compressor Reciprocating 650 Motor CS
11-K-103 Propane Refrigeration Compressor Centrifugal 3200 Gas Turbine SS/CS
11-K-104 LEF Overhead Compressor Centrifugal Gas Turbine
COLUMNS

11-C-101 LEF column-I


TOP 1600 9250 Packed CS
BOTTOM 2200 12300 Packed CS

11-C-101A LEF Column-II


TOP 1600 9300 Packed LTCS
BOTTOM 2200 15550 Packed CS

11-C-102 LPG Column 2020 28000 Packed CS

11-C-103 Propane Column 1500 27900 Tray *


Offsites and Utilities
• Raw Water Treatment Plant
• Cooling Water System
• Inert Gas Plant
• Instrument Air/Plant Air System
• Boiler
• Product Storage
• Product Despatch
• Effluent Treatment Plant
CHEMICAL DOSING
ACID DOSING
COOLING TOWER
8' MAKE UP WATER (95M3/HR)

LV
12 10
MESH MESH

CW SUPPLY
COOLING TOWER 33 DEG C
2 X 1500 M3/HR

36" WCR 45 DEG C

8" SIDE STREAM 8"


FILTER

PLANT AIR 20-P-205 A/B/C


WWTP COOLING WATER RECIRCULATION PUMPS
SS Q = 1500 M3/HR (2 + 1)
LPG STORAGE
ROV
ROV

10" RECIRCULATION
LINE
8'' VAPOUR
RETURN LINE
LPG Sphere

ROV ODORANT DOSING


TO RAIL LOADING LINE
24" INLET/
OUTLET LINE
LPG Rail Loading Pump 20-P-208 A/B
@ 40 LPH
TO ROAD
LPADING
6" RECEIPT

16" LINE 20-P-215 A/B


@ 2.4 LPH 6" MIN
REC. LINE

LPG Road Loading Pump DISCHARGE


FROM PUMP
COMPRESSED AIR SYSTEM
PLANT AIR AP HEADER
7 Kg/CM2
4"
AI HEADER
PV
I.A.
7.5 Kg/CM2

4"

PLANT AIR I.A. RECEIVER


RECEIVER 20-V-208
20-V-209
50 M3 50 M3
2"
DRYER
A/B/C
315 NM3/HR

20-K-201 A/B/C/D

AIR COMPRESSOR
WCS
650 Kg/HR
WCR
INERT GAS PLANT

N.G. I G UNIT: 150 NM3/HR (1 +1)


VENT
PV FV
VENT

AIR
FV

QUENCH
WATER E-102
V-101 V-104
FURNACE/
COMBUSTION
CHAMBER K.O. POT V-102 2nd STAGE
BLOWER SEPERATOR
GAS CONDITIONER
SEAL POT

DRAIN
3 STAGE
RECIPROCATING COMPRESSOR

PV

RECEIVER DRYER
TO ATM
AT HIGH POINT
LPG LOADING FACILITY

U
2"

12" 12"

3"

UFILTERS
20-X-218 A/B
TS TO 8" VAP
RETURN LINE 4"
CONDENSATE
POT
PD
BATCH PT METER
CONTROLLER TO SPHERE 2" FUEL GAS
TE
3"

LOADING TANKER SICK TANKER UNLOADING


c) Hydrotest at original test

Once in 5 yrs

19
pressure, internal and external

detailed inspection.

2. Safety Relief Set pressure Valve

As stipulated by

18

Statutory authorities

3. Internal a) Condition of valve Once in 1 yr


LPG Road Loading Gantry:
Following safety measures are provided:

In Gantry
ESD The actuation of this push button will result in cutting of power supply to all
Acculoads, tripping the LPG loading pumps and starting the sprinkler system.
Pump Trip The pressing of push button will trip loading pumps only.
Accuload Trip The pressing of push button will result in cutting of power supply to all Accuload.
Sprinkler can be started from field by cutting of instrument air to ROV.

In Loading Control Room


ESD The actuation of this push button will result in cutting of power supply
to all Acculoads, tripping the LPG loading pumps and starting the
sprinkler system.
Pump Trip The pressing of push button will trip loading pumps only.
Sprinkler Selector Switch The actuation of this switch will result in opening of firewater ROV that
in turn will start the sprinkler.
Main circuit breaker (MCB) are provided to cut off power supply to Acculoads.

Gas Detection System


Propane loading gantry is provided with Gas Detection system above PD Meter in each bay. Two alarms
are provided in LEL Detection Panel . Range of Alarm-1 is 20% and that of Alarm-2 is 40% of
LEL. In case of gas leakage, indications of LEL will come in Loading Control Room.
Propane Loading Gantry

In Gantry
Pump Trip The pressing of push button will trip loading pumps only.
Accuload Trip The pressing of push button will result in cutting of power supply to all acculoads.

In Loading Control Room


Pump Trip This will trip loading pumps only.
Accuload Trip This will result in cutting of power supply to all Accuload.
Sprinkler Selector Switch The actuation of this switch will result in opening of firewater DV that
in turn will start the sprinkler.
Gas Detection System
Propane loading gantry is provided with Gas Detection system above PD Meter in each bay. Two
alarms are provided in LEL Detection Panel . Range of Alarm-1 is 20% and that of Alarm-2 is
40% of LEL. In case of gas leakage, indications of LEL will come in Loading Control Room.
SBPS Loading Gantry

In Field
Pump Trip The pressing of push button will trip loading pumps only.
Accuload Trip The pressing of push button will result in cutting of power supply to all
Acculoads.

In Loading Control Room:


Pump Trip This will trip loading pumps only.
Accuload Trip This will result in cutting of power supply to all Accuload.
Sprinkler Selector Switch The actuation of this switch will result in opening of firewater DV that in
Pentane Loading Gantry

In Field
Pump Trip The pressing of push button will trip loading pumps only.
Accuload Trip The pressing of push button will result in cutting of power supply to all
Acculoads.

In Loading Control Room


Pump Trip This will trip loading pumps only.
Accuload Trip This will result in cutting of power supply to all Accuload.
Sprinkler Selector Switch The actuation of this switch will result in opening of firewater DV that
in turn will start the sprinkler.

Gas Detection System


Pentane gantry is provided with gas detection system. Gas Detectors are provided near bay no. 1 & 2 and
underground tank for unloading of pentane from sick tankers.
EFFLUENT TREATMENT PLANT
RECIEVING
SUMPS
SANITARY
WASTE DEGRITTING

CLARIFIER
PROCESS PRESSURE
WASTE SAND
FILTER
TPI AERATION
OIL TANKS
SKIMMER

TREATED
CONTAMINATED EFFLUENT
RAIN WATER
WATER FOR
DISPOSAL

OIL
SKIMMER SURGE TPI
POND
GAURD
POND
SLUDGE
TO
SLUDGE
PITS
SLOP OIL SLOP
SUMP OIL
TANK
OILY SLUDGE CENTRIFUGE
SLOP OIL SLUDGE THICKENER
FOR SUMP
DISPOSAL
LEGEND
WATER EFFLUENTS

SUPERNATANT WATER
SLUDGE
SLOP OIL
LEF Column - I
TI 509 To Chiller E-101
PSV 501 29.5 TI 511
E-102 To Chiller E-101
PHH 504 TI 512
Sep-II Vapours
C-101 TI 510 PIC 503
TI 502

V-106
TLL 515

FI 505 dPI 501 LIC 502


LLL 503
HIC 501 TI 501

FIC 503
TI 503

TI 504 dPI 502

TI 507 LEF Column


A P-101 B
LIC 501

FIC 501
WHS
To Propane Column
WHR E-103