KZB / KZB-Q

MAINTENANCE SEMINAR
PAN CONVEYOR
KZB / KZB-Q KZB / KZB-Q : 1
AUMUND PREVENTIVE MAINTENANCE TRAINING
WE CONVEY QUALITY

KZB / KZB-Q
AUMUND
Apron Conveyor

More than 5.500 units in


service since 40 years

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 2


WE CONVEY QUALITY

KZB / KZB-Q
Contents of the Training:
1 – Application of pan conveyors
2 – Contents of the operation manual
3 – Components and assemblies
4 – Maintenance
- Requirements
- Inspection intervals
- Lubrication
- Wear measurement
- Parts replacement
- Adjustments
- Erection instruction
- Faults
5 – Ordering spare parts

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 3


WE CONVEY QUALITY

KZB / KZB-Q Application of KZB, KZB-Q,


BZB and Bucket elevator

90°
60°

Bucket elevator
Z B
B 45°

Z B-Q
Application of K
KZB, KZB-Q, BZB 28°
with different slopes
Based on a 34° angle of
repose KZB

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 4


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Operation manual

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 5


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Operation manual

Content of the operation manual:

Chapter 1 – General Survey


Chapter 2 – Safety
Chapter 3 – Operation
Chapter 4 – Faults
Chapter 5 – Maintenance and servicing
Chapter 6 – Lubricating instruction
Chapter 7 – Spare part list
Chapter 8 – Annex 1
Chapter 9 – Annex 2 - Drawings
Chapter 10 – Erection instructions
Chapter 11 – Package list

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 6


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Operation manual

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 7


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Operation manual

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 8


WE CONVEY QUALITY

KZB / KZB-Q
Components and assemblies

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 9


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

Runway track Drive Station

Take up station Conveying section

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 10


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

• Drive station 9 8

1. Motor
2. Fluid coupling
3. Gear box
4. Coupling 7

5. Drive shaft
6. Fixed bearing
7. Hubs
8. Toothed segments
9. Loose bearing 3 2 1 5 6 4

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 11


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

• Drive shaft
1. Shaft
2. Toothed segments
3. Hub
4. Flange bearing comp.
5. Connecting plate
6. Cone block
7. Feather key
8. Hexagonal screw
9. Washer
10. Hexagonal nut
11. Hexagonal screw
12. Washer
13. Washer
14. Hexagonal nut
15. Hexagonal screw
16. Washer

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 12


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

• Flange bearing
1. Flange bearing housing
2. Flange bearing housing
3. Flange bearing lid
4. Flange bearing lid
5. Disc
6. Bearing bush
7. Bearing
8. Shaft sealing ring
10. Hexagonal screw
11. Washer
12. Hexagonal screw
13. Washer
14. Grease nipple
15. Fitting

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 13


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

• Drive shaft
- Toothed segments
- Easy assembly and disassembly
- Not necessary to open the chain
- Self alignment roller bearing
- Lower Maintenance cost

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 14


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 15


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

TOOTHED RIMS WITH 7,5 TEETH, WHAT DOES IT MEAN ?

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 16


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

• Runway 5 1

1. Upper run
2. Lower run
3. Curve
4. Supports
5. Upper guiding

4 3 2

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 17


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

3 1
• Runway 5

1. Upper run
2. Lower run
3. Curve
4. Supports
5. Upper guide line

AUMUND rails are twofold rolled, to provide the surface 2


more hardness, therefore less wear than standard rails.
AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 18
WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

• Tension station 1 2 3 4 5 6

1. Frame
2. Springs
3. Spindles
4. Loose Bearing
5. Tension axle
6. Hubs
7. Toothed segments
8. Fixed bearing

7 8

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 19


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

• Tension axle
1. Tension axle
2. Toothed segments
3. Hub
4. Loose tension bearing
5. Fixed tension bearing
6. Feather key

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 20


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

• Tension spindle
1. Tension spindle
2. Parallel bolt without head
3. Washer
4. Split pin
5. Pressure spring
6. Spring washer
7. Spindle nut

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 21


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

• Tail axle
- Toothed segments
- Easy assembly and disassembly
- Not necessary to open the chain
- Self alignment roller bearing
- Lower Maintenance cost

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 22


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

• Tension station

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 23


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

• Conveyor Section
1. Pan with roller bracket
2. Pan without roller bracket
3. Baffle plate
4. Chain (right)
5. Chain (left)
6. Hexagonal screw
7. Lock nut
8. Hexagonal screw
9. Pan with baffle plate
10. Pan without baffle plate
11. Hexagonal screw
12. Nut

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 24


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

• Conveyor Section
- Patented beats in sideboards
- Dust tight
- Separately mounted rollers
- Overlapping pans
- Self supporting chain design

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 25


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 26


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

Patented overlapping system


contact free no wear and
tear
no spillage exact determination
of discharge position
low maintenance
requirements

design Transport of
characteristics clinker up to an
inclination of
28°
without baffle

Conveying direction

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 27


WE CONVEY QUALITY

KZB / KZB-Q

- old design - - current design -


without beaded With beaded sideboards
sideboards

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 28


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

• Chain (AU 4540.1) 3


1
1. Inner link 5

2. Outer link
3. Bushing
4. Bolt
5. Closing link

2
5

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 29


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

Explanation of Chain Designation


Chain generations

Pitch x Width / Side bar height x Side bar thickness

160x45 / 70X10
1960 to 1980

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 30


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

Explanation of Chain Designation


Chain generations

Pitch x Width / Side bar height x Side bar thickness

250x45 / 70X10
early 1980 to 2005

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 31


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

Explanation of Chain Designation


Chain generations
Bush diameter
Chain width Development phase

AU 4540.1
since 2005

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 32


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

• Chain (AU 4540.1)


1. 10-20 % higher breaking load
2. Pre-mounted chain locking link
3. Shorted delivery period
4. Geometry of pans and
…..buckets kept unchanged
5. High precision laser cut
6. Press-fit for bolts and
…...bushings
9. Fabricated fine grained steel

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 33


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

Frequently asked questions


Will the bolts potentially shift in the holes due to the missing locking
ring?
NO! Long experience with bolts of bucket elevator chain
with press fit

Will the plates wear more than the old design?


NO! Wear of plates possible, if conveyor misaligned.
This applies to chains of new and old generation.

Will it be easy to duplicate the new chain generation?


NO! Special fine grained steel
New cam design only possible in laser-cut technologies
Design of the press fit not exactly reproducible after first
…………assembly

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 34


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

• Rollers
1. Roller body
2. Roller axle
3. bush
4. bush
5. bush
6. lid
7. Sealing lamella
8. Sealing lamella
11. Circlips for bores
12. Circlips for shafts
13. Bearing
14. Cupped lubrication nipple
15. Sealing lamella
16. Sealing lamella

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 35


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

• Rollers
- Sturdy design
- Three sizes: 108, 140, 160 mm
- Stub shaft
- Forged roller body
- Inductively hardened
- SKF Bearings
- Lifetime lubrication
- Special sealing's
- Low maintenance
- Long service life
- Easy assembly and disassembly

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 36


WE CONVEY QUALITY

KZB / KZB-Q Components and assemblies

• Rollers

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 37


WE CONVEY QUALITY

KZB / KZB-Q
Maintenance

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 38


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Safety

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 39


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Requirements

A precondition for perfect operation of the pan conveyor KZB is


proper maintenance, i. e.:

- Qualified/trained maintenance personal


- Regular inspections according to the operation manual
- Prompt replacement of worn or damaged parts
- Immediate elimination of defects
- Regular lubrication
- Operation according operation manual

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 40


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Inspection intervals

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 41


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Inspection intervals

The inspections and checks to be carried out are subdivided in the operation manual according
to operating time and maintenance intervals.
The following means:

Daily Weekly Monthly Yearly


X daily
X weekly
X monthly
X yearly
2 Every 2 weeks
3 or 6 Every 3 or 6 months
2 Every 2 years
Start With each commissioning
Team With each beginning of shift
Need As required

to see in the AUMUND Operation Manual: Chapter 5


AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 42
WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Inspection intervals

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 43


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Lubrication

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 44


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Lubrication

Lubrication General

Here you will find an example of lubrication list for pan


conveyor.

This lubrication list is to find in each “Operation Manual” in


chapter 5,
»for each machine there is a specific lubrication list that you
have to take in consideration.

All these instructions are to protect your equipment against


normal wear but also excessive wear.

An optimal lubrication will give you a good function of your


equipment and also to your complete installation.

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 45


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Lubrication

• Main lubricating points


1. Gearbox / Drive bearings
2. Tension bearings
3. Rollers
4. Chain – only to avoid creaking

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 46


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Lubrication

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 47


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Lubrication

• Specification

See chapter 6 of the operation manual

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 48


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Lubrication

Drip feed lubrication of the chain

1- Oil tank
2- Valve
3- Pipe
4- Injector

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 49


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Lubrication

Lubrication or

no lubrication ?

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 50


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Lubrication

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 51


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Lubrication

• Lubrication of the rollers

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 52


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

Regularly wear measurement according to the operation manual


will lead to:

- Early detection of wear


- Early detection of failures
- Optimized maintenance management
- Optimized spare part management
- Less spare parts on stock
- Lower maintenance costs
- Less unplanned stops
- Increase of production

!!! Your boss will like it !!!


AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 53
WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

Two different methods of wear measurement

1 – Visual check

2 – By measuring

For a perfect result we have to operate with both methods

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 54


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

1 – Visual check

- seeing

- feeling

- touching

- hearing

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 55


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

2 – Dimensional check
- Measure tape
- Calliper gauge
- Feeler gauge
- Spirit level
- Folding rule
- Wire
- Plummet
- Laser
- Theodolite
- Thermometer
- Torque wrench

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 56


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

• Toothed Segments
- Toothed segments must be replaced once the hardened zone of the tooth
paces has been worn away.

- Considerable wear of the toothed segments occurs:


- if the tooth shape differs by more than 6 mm at any point from the
shape of a new toothed segment compared with new toothed segment
or a template (see Fig. 4a and 4b)
- if the chain does not leave the tooth space of the sprocket wheel
smoothly, but jerkily.

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 57


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

The toothed segments must be replaced :


- If wear acc. to the drawings can be ..observed

- When the chain is exchange with a new ..one

- If the chain elongation has not yet


exceeded ..the X50 wear dimension

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 58


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

• Toothed Segments Wear limit

End of the hardening zone

! This segments are working at the wear limit and must be changed !

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 59


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

• Toothed Segments

!!! Don’t wait too long !!!


AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 60
WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

• Toothed Segments

!!! Typical catching due worn sprockets !!!


AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 61
WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

• Toothed Segments

If you wait too long

!!! This will happen !!!


AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 62
WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

• Chain
- The table in the operations manual shows two different dimensions
of :::wear:

X 50
& X max
What does that mean ??
AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 63
WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

• Chain

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 64


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

• Chain (new generation)

X 50 : until this value it is possible to replace chain parts or segments

X max: when this value is reached, it is necessary to replace the


. complete chain and segments!

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 65


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

• Chain (old generation)

X 50 : until this value it is possible to replace chain parts or segments

X max: when this value is reached, it is necessary to replace the


. complete chain and segments!

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 66


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

• Chain (forged chains)

AU 725 W AU 625
Chain-type Ø Bush Ø Pin X50 Xmax
(mm) (mm) (mm) (mm)
AU 625
250 x 60 /
Pitch 250mm 66,5 44 317,7 318,6

AU 725 W
250 x 80 /
75,95 49,95 328 330
Pitch 250 mm

X 50 : until this value it is possible to replace chain parts or segments

X max: when this value is reached, it is necessary to replace the


. complete chain and segments!
AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 67
WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

If you change the You must change


chains of the left the chain on the
side right side too!

Chains always must be replaced in pairs!

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 68


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 69


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

• Chain (measurement)

The chain must be


tensioned and cold. The Never take the measurement
measurement must be taken at an inner link!
between two outer inks!!

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 70


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

• Bushings
This bushing is worn

!!! Replace the chain and the toothed segments !!!


AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 71
WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

• Bushings
Pittings

!!! Replace the chain and the toothed segments !!!


AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 72
WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

• Bushings
Cracks

!!! Replace the chain and the toothed segments !!!


AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 73
WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

• Rollers

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 74


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

• Rollers

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 75


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

• Rails

Rail: S18

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 76


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

• Rails

Rail: S18

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 77


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Wear measurement

• Rails

! Always check the supports and the weldings of the rails !

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 78


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Parts replacement

Parts replacement
BEFORE CARRYING OUT ANY REPAIR OR MAINTENANCE WORK,
ALWAYS STOP AND SWITCH OFF THE CONVEYOR AND PROTECT
AGAINST ANY ACCIDENTELY UNAUTHORISIZED RESTARTING!!!!

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 79


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Parts replacement

• Replacement of the toothed segments:

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 80


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Parts replacement

• Replacement of the toothed segments:

1. Empty the conveyor


2. Move the conveyor until the toothed segments to be replaced
....are not located in the meshing area!
3. Switch off the conveyor and protect it against any unauthorized
restarting!
4. Remove the bolts and the toothed segments
5. Put the new segments in place and tighten the bolts
6. Carry out steps 2, 3, 4 and 5 for the other toothed segments
7. Once all new toothed segments have been installed,
tighten ....all the bolts to the correct torque
8. Run the conveyor for one or two hours and check the
torque, ...making any corrections needed

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 81


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Parts replacement

• Replacement of the toothed segments:


2. Move the conveyor until the toothed segments to be
replaced ....are not located in the meshing area!

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 82


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Parts replacement

• Replacement of the toothed segments:

4. Remove the bolts and the toothed segments

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 83


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Parts replacement

• Replacement of the toothed segments:

5. Put the new segments in place and tighten the bolts

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 84


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Parts replacement

• Replacement of the toothed segments:

6. Carry out steps 2, 3, 4 and 5 for the other toothed segments

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 85


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Parts replacement

• Replacement of the toothed segments:


NOTE:
The toothed segments is indicated by engraved figures in the intersections!

1–1 2–2 3–3 4–4

!!! THE SAME FIGURES = MATCHING INTERSECTIONS!!!

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 86


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Parts replacement

• Replacement of the toothed segments:


NOTE:
The type of toothed segments are marked by engraved figures in the segments!

!!! THE TOOTHED SEGMENTS HAVE TO FIT WITH THE CHAIN !!!

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 87


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Parts replacement

• Wrong assembling of the toothed segments

5–1

Contact area Different


of the wear
bushings
THE USE OF OLD WITH NEW TOOTHED SEGMENTS WILL CAUSE EXTREMLY WEAR
AND MAY DAMAGE THE CHAIN
AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 88
WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Parts replacement

• Replacement of the toothed segments:


NOTE:
All bolts must be tightened with the correct torque

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 89


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Parts replacement

• Replacement of the chain:

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 90


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Parts replacement

• Replacement of the chain:

How to open the chain?

1. Empty the conveyor


2. Switch off the conveyor and protect against any unauthorized restarting!
3. Loose the tension spindle nuts so far that
the ...springs will be completely tension-free.
4. Support the chain and/or the conveyor section at the cut-off point so that
...it cannot fall down after separation.
5. Use an angle grinder to cut/open one outer link plate at both bolts at
each end of the chain strand to be replaced

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 91


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Parts replacement

• Replacement of the chain:


Use a angle grinder to cut the chain!

! Never cut the link plates by flame-cutting. The high temperatures may cause
the loss of the chain strength !
AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 92
WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Parts replacement

• Replacement of the chain:

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 93


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Parts replacement

• Replacement of the chain:

How to close the chain!

1. Close the chain by means of the mounting device!


2. Remove the support of the conveying elements
3. Reinstall any previously removed rollers
4. Tension the chain again
5. Carry out a test run and make the necessary adjustments

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 94


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Parts replacement

• Replacement of the chain:

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 95


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Adjustments

Tensioning the chain:

1. Trouble-free operation of the conveyor is only possible if the chain


is ....tensioned correctly.
2. The correct chain tension is set by tensioning the springs on
both ....tensioning spindles.
3. Only check and adjust the chain tension without load.
4. Only check and adjust the chain in cold conditions! ....
(Environment Temperature).
5. Do not compress the springs completely (to a block)
6. Pretension both springs to the same size

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 96


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Adjustments

Tensioning the chain:

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 97


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Adjustments

Tensioning the chain:

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 98


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Adjustments

Tensioning the chain:

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 99


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Adjustments

Tensioning the chain:

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 100


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 101


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

Assembly:

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 102


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

Preparation of the site of installation:

1. The side of installation of the conveyor and the required transport


path ...must be cleaned and free from any possible obstacles

!!! KEEP THE SITE ALWAYS CLEAN AND ORGANIZED !!!

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 103


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

Where can I find the machine parts?

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 104


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

Position of tension station and drive station:


2. The cross points of the tension axle and the drive shaft center with
the ... conveyor axis define the locations of the stations.
Cross point of the
tension axle!

Cross point of the


drive shaft!

!!! Determine these points with utmost accuracy !!!

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 105


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

Conveyor path / Conveyor center line:


3. The conveyor center line is the connecting line between tension
station ...and drive station
Center line

!!! Detailed information about erection you will find in the operation
manual !!!
AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 106
WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

Alignment of the drive station:

- Misalignment of the chain at the drive station occurs due to:

1. Bad alignment during assembling


2. Drive shaft out of level
3. Settling of the steel structure
4. Loose bolts of the drive bearings
5. Bad alignment after assembling of new spare parts…. etc.

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 107


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

Alignment of the drive station:

!!! Strong misalignment of the drive shaft at the drive station !!!

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 108


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

Alignment of the drive station: Center line of the chain

Center line of the toothed segment

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 109


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

Alignment of the drive station:

!!! Alignment of the drive shaft !!!

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 110


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

Alignment of the drive station:

!!! Alignment of the drive shaft !!!

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 111


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

Alignment of the drive station:

!!! Level of the drive shaft !!!

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 112


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

Alignment of the drive station:

!!! Level of the drive shaft !!!

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 113


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

Transport of the conveying elements:

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 114


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

Assembling the conveying elements:

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 115


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

Assembling the conveying elements:

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 116


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

Assembling the conveying elements:

!!! Never do it like these guys !!!


AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 117
WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q


15.11.2004, Liß,:Pz
118
WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 119


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 120


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 121


WE CONVEY QUALITY

KZB / KZB-Q

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 122


WE CONVEY QUALITY

KZB / KZB-Q

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 123


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

Adjustment of the rails:

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 124


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

Adjustment of the rails at the drive station:

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 125


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

Adjustment of the rails at the take up station:

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 126


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

Test run:

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 127


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Erection instructions

Checklists for test run in chapter 6 of the operation manual:

!!! Before start up – use the check list !!!


AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 128
WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Faults

Possible faults:

See chapter 4 of the operation manual

If you need further information


contact the:

AUMUND AFTER SALES SERVICE


Phone: +49 (0) 2843 72-0
Fax: +49 (0) 2843 72 400
E-Mail: aumund@aumund.de

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 129


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Ordering spare parts

Ordering spare parts:

You will find all necessary information


in our operation manual!
Chapter 7

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 130


WE CONVEY QUALITY

KZB / KZB-Q Maintenance / Ordering spare parts

Ordering spare parts:

You will find all necessary information


in our operation manual!
Chapter 7

AUMUND PREVENTIVE MAINTENANCE TRAINING KZB / KZB-Q : 131


WE CONVEY QUALITY

Thank you for listening!

BW-Z : 132