SUMMER
INTERNSHIP
(WORKSHOP)
CONDUCTED BY : MECHANICAL ENGINEERING
DEPARTMENT
INTERNSHIP
DURATION : 01.07.2019 CO-ORDINATOR :
– 10.07.2019
RAVI KUMAR
WORKSHOP CO-ORDINATOR :
ANKIT KUMAR
GROUP(C-3) MEMBERS
ROLL NUMBER NAME
Iron nut
Iron rod
DIMENSION OF LAMP
DAY 1 :
GET THE PROJECT (RANDOM PROCESS)
“MAKING AN ART USING METALLIC SCRAP”.
(WELDING).
DAY 2 :
MAKE PLAN WITH TEAM MEMBERS FOR
MAKING TABLE LAM P FROM USELESS AND
DEFECTIVE NUTS AND RODS.
DAY 3:
MAKE APPROVAL LETTER .WE MENTION ALL
MATERIAL AND TOOLS REQUIRED AND DIVIDE
THE WORK AMONG GROUP MEMBERS.
DAY 4
ON THIS DAY ALL THE GROUP MEMBERS REACH THERE ON
TIME .
WE GET ALLOW FOR THE ALL WELDING TOOLS AND
EQUIPMENTS ON TIME FROM THE WORKSHOP .
CONNECT THE WELDING EQUIPMENT AND KEEP ALL THE
TOOLS AT SUITABLE POSITION.
REMOVE RUST FROM THE NUTS USING FILING AND SCRAPING.
ARRANGE THE NUTS WITH PROPER ALIGNMENT
ON THE WELDING TABLE.
ONE OF THE GROUP MEMBER WEARS GLOVES ,SHOES,APRON
AND HELMET THEN START THE WELDING PROCESS.
SWITCH ON THE POWER SUPPLY AT 70 A CURRENT.
JOIN THE NUTS WITH THE BUTT JOINT ON FLAT POSITION.
FIRST WE MAKE BASE OF LAMP WITH NUTS .
DURING WELDING WE USE WIRE BRUSH FOR REMOVING
CARBON AND TONGS FOR HOLDING NUTS AND CHIPPING
HAMMER FOR HAMMERING ,EACH MEMBER DO WELDING
ALTERNATIVELY THEN SWITCH OFF THE POWER SUPPLY.
FINALLY WE PREPARED BASE OF THE LAMP.
Welding process
DAY 5
Grinding
Top/shade of lamp
DAY 6