Emaar District Cooling - MINA RASHID DEVELOPMENT

Design
VSC vsEnvelope
ViL | MZ
Armstrong Connect
DCPEnergy
Global | 2023
India
| Summit
OM
| 2020 | June 2018 1 1
Evaluate Pump Type by Considering Six Major Criteria

A. Floor space
B. Ease of installation
C. Maintainability
D. Reliability
E. Sustainability

Design
VSC vsEnvelope
ViL | MZ
Armstrong Connect
DCPEnergy
Global | 2023
India
| Summit
OM
| 2020 | June 2018 2 2
Floor Space Savings

Reduced Footprint with Armstrong DE-ViL


Original

Design
VSC vsEnvelope
ViL | MZ
Armstrong Connect
DCPEnergy
Global | 2023
India
| Summit
OM
| 2020 | June 2018 3 3
Floor Space Savings:
(Superimposed)

Reduced Footprint of ~ 250 Sq.m

VFD cabinets are removed.

Design
VSC vsEnvelope
ViL | MZ
Armstrong Connect
DCPEnergy
Global | 2023
India
| Summit
OM
| 2020 | June 2018 4 4
Floor space (500 USgpm/90ft)

Vertical Inline 66% less floor space than Vertical Split Case

Vertical Split Case

Vertical In-line

Design
VSC vsEnvelope
ViL | MZ
Armstrong Connect
DCPEnergy
Global | 2023
India
| Summit
OM
| 2020 | June 2018 5 5
Ease of Installation
Pipe mounted Vertical In-line
Pumps are easy to install.

1. Grouting
2. Inertia pad
3. Concrete base
4. Flex connectors

Additional costs to install can


be as much as up to $ 6,375.00
on an 8” pump

Design
VSC vsEnvelope
ViLGlobal
Armstrong
Armstrong | MZ Connect
DCP | 2023
Energy
Global India
| Summit
OM
Summit
Energy | 2020
| 2018
| June 2018 6 6 6
Ease of Installation

Vertical In-line installations are simpler and


less costly
Vertical Split Case Pump ‘sits’ on a big inertia
block with spring isolator installed at the
bottom. Cumbersome & expensive to install.

Design
VSC vsEnvelope
ViLGlobal
Armstrong
Armstrong | MZ Connect
DCP | 2023
Energy
Global India
| Summit
OM
Summit
Energy | 2020
| 2018
| June 2018 7 7 7
Maintainability:
Split case

• 2 seals to maintain and 2 bearings to remove and


replace
• The whole rotating part (shaft, impeller, bearing
mechanical seal) needs to be taken out for servicing
of mechanical seal.
• This means that the pumps need to be re aligned
once the servicing are done.
• Inboard seal can be replaced in an estimated 6
hours in an 8” pump

Dismantling & assembly is complicated. Need well trained technician with experience to align the casing just right so the
casing will not leak from the side

Design
VSC vsEnvelope
ViL | MZ
Armstrong Connect
DCPEnergy
Global | 2023
India
| Summit
OM
| 2020 | June 2018 8 8
Vertical In-line vs Horizontal Split Case – Maintenance

• 2 seals to maintain and 2 bearings to remove and


replace
• seal replacement in an estimated 6 hours in an 8”
pump
Split case vs Armstrong VIL seal change comparison Video

Design Envelope
Armstrong Connect
Global IndiaSummit
Energy | 2020 | June 2018 9 9
Reliability

Vibration is the number one common root cause influencing the use-able life span of a pump.

• Shaft alignment at the coupling to the motor,


• Rotating elements in the pump & motor bearings
• Electric motor induced vibration

Vertical in Line Pump runs vibration free


ViL VSC
10 hp 0.125 0.125
100 hp 0.175 0.2
In / sec rms unfiltered
Source - Hydraulic Institute 9.6.4-2000

Design
VSC vsEnvelope
ViL | MZ
Armstrong Connect
DCPEnergy
Global | 2023
India
| Summit
OM
| 2020 | June 2018 10 10
Reliability
When repair costs exceed replacement cost, the pump is at end of life

• Vibration over time will change the shape of bearing housings to cause
alignment problems that further lead to increased maintenance
• Surface damage of the shaft alignment housings eventually produces
un-predictable failure cycles and requires bearing housing replacement

The lower bearing always fail


because of the inherent design of
the Vertical Split Case pump. All
debris fall towards the bearing due
to gravity.

Design
VSC vsEnvelope
ViL | MZ
Armstrong Connect
DCPEnergy
Global | 2023
India
| Summit
OM
| 2020 | June 2018 11 11
Reliability

Use of a rigid couplings allows for


repeatable concentricity which is
duplicated during every seal change
Rigid permanently
factory
Aligned
Coupling

Design
VSC vsEnvelope
ViL | MZ
Armstrong Connect
DCPEnergy
Global | 2023
India
| Summit
OM
| 2020 | June 2018 12 12
Reliability

Centrifugal Pumps Vertical In-Line


Failure Rate Versus Pump Type
Shell Limited 58%
more reliable
150 –
Failure Rate / Million
Hours of Operation

100– Drive Others


Drive Bearings
50 – Pump Others
Pump Closure
Pump Bearings
0–
VSC/ ViL
HSC

Design
VSC vsEnvelope
ViLGlobal
Armstrong
Armstrong | MZ Connect
DCP | 2023
Energy
Global India
| Summit
OM
Summit
Energy | 2020
| 2018
| June 2018 13 13 13
Environmental Impact – Inertia Base and Housekeeping Pad

According to the World Green Building Council, reducing the amount of embodied Carbon is one of the
biggest challenges to the building sector in the next few decades.

VS

Vertical Split Case



Vertical In-line
Carbon footprint of concrete for typical 8”
• No Concrete
pump - 2 metric tons.
• No inertia base
• 360 lbs of CO2 to produce
Design
VSC vsEnvelope
ViL | MZ
Armstrong Connect
DCPEnergy
Global | 2023
India
| Summit
OM
| 2020 | June 2018 14 14
Evaluate Pump Type by Considering Six Major Criteria

Vertical
A. Floor space 
B. Ease of installation 
C. Maintainability 
D. Reliability 
Sustainability
E.

Why the building trade market prefer vertical in-line pumps

Design
VSC vsEnvelope
ViL | MZ
Armstrong Connect
DCPEnergy
Global | 2023
India
| Summit
OM
| 2020 | June 2018 15 15
Payback over Premium

With VFDs

158474.044
8434.07563334733

171613.1004 180047.176033347 171613.1004

diate
me-
Im-
463175.9504

$ 291,563 $ 291,563 $ 291,563

Desi gn En v el o p e Bi d To tal Base Bi d Di ff . f o r Desi gn In stal l ed C o st f o r Net In stal l ed C o st A n n u al O p er ati n g P ay b ack P er i o d ( i n


En v el o p e Bi d Base Bi d S av i n gs C o st S av i n gs Year s)

Design Envelope
Armstrong Connect
Global IndiaSummit
Energy | 2020 | June 2018 16 16
Installation Cost Savings
Firs t Co s t S avin g s d u e t o :
· Sm a lle r Po w e r Wiring d ue t o s m a lle r kW/ hp ra t ing m o t o rs $ 72
· VFD Mo unt ing a nd w iring t o p um p $ 5,239
· Co m m is s io ning Sa ving s $ 293
· Ele c tro Mag n e tic (EM) Flo w-me te r Sa v in g s (Primary lo o p e a c h b ra n c h 3 X $ 9 0 3 2 .2 5 ) $ 27,097
· Pro p e lle r Flo w me te r (FM) Sa v in g s (Co n d e n s e r lo o p e a c h b ran c h 3 X $ 5 3 3 2 ) $ 15,995
· Pa n e l Siz e Sav in g s $ 23,303
· Fle x Co n n e c to r Sa v in g s $ 52,254
· Gro u tin g / Co n c re te b a s e Sa v in g s $ 15,680
· In e rtia Ba s e Sa v in g s $ 26,133
· Pip in g s a v in g s d u e to le s s e r fo o t p rin t $ 13,982
To t al In s t alle d Co s t S avin g s $ 180,047

Ta g # Qty Ba s e Bid Pu mp Design Envelope Pump


PP-0 1 4 LSV 3 0 0 -2 0 0 -4 5 0 A / 4 p 2 0 0 kW DE4 3 0 0 2 5 3 7 -2 0 0 .0 , 4 p
CP-0 1 4 LSV 6 0 0 -5 0 0 -4 9 8 A / 6 p 1 8 5 kW DE4 3 0 0 4 0 3 8 L1 6 0 .0 , 4 p
TESP-0 1 2 LSV 1 5 0 -1 2 5 -4 1 5 Ax 2 / 4 p 7 5 kW DE4 3 0 0 2 0 3 7 -0 5 5 .0 , 4 p

Design Envelope
Armstrong Connect
Global IndiaSummit
Energy | 2020 | June 2018 17 17
Operational Cost Savings
Country Dubai
Annual Energy Cost Savings (Full Load - Extreme Case)
Energy $/kWhr 0.110
Working Hours 24
Working Days 365
Base Bid
Total annual
Base Bid # of Duty annual DE Bid # of Duty DE annual op.
Energy cost
BkW pumps operating BkW pumps cost (ea)
savings
cost (ea)

175.50 3 $ 507,335 144.89 3 $ 418,848 $ 88,487


123.10 3 $ 355,857 106.71 3 $ 308,477 $ 47,380
49.97 1 $ 48,151 42.18 1 $ 40,645 $ 7,506
Total Annual Energy cost savings $ 143,374
Maintenance Savings due ease of Seal Change, labour reduction $ 15,100
Total Annual Operating Cost Savings $ 158,474

Design Envelope
Armstrong Connect
Global IndiaSummit
Energy | 2020 | June 2018 18 18
Flow Meter Capability

Sensorless flow reading Test rig flow reading

Pump is a flow
meter!
Design
VSC vsEnvelope
ViL | MZ
Armstrong Connect
DCPEnergy
Global | 2023
India
| Summit
OM
| 2020 | June 2018 19 19
Design Envelope Advantages
An integrated approach to reducing Design Envelope advantages
system cost 1. Selections save energy and cost

Traditional Wall mount


1. Energy & Flow metering 2. Impeller trim saves energy and cost
2. Harmonic and RFI filtering
3. Superior control
3. VFD mounting & Wiring
4. Coupling re-alignment. 4. Smaller size motor and control
5. Concrete base, grouting, flex connectors* 5. Wiring vfd mounting bracket savings

VFD
Wall Mount
VFD 6. Harmonic distortion
7. Emission and immunity requirements
8. Reflected wave voltage
9. Envelope selection reduces risk and cost
10. Energy metering capability
Pump with Sensorless Control
Armstrong Design Envelope

11. Saves wall space


12. Load Limiting feature to protect motor
13. Active performance management (Pump
Manager)

Flow, Energy, Power, Speed, Trend, alerts and many other


parameters can be monitored on the User Interface.

Design
VSC vsEnvelope
ViL | MZ
Armstrong Connect
DCPEnergy
Global | 2023
India
| Summit
OM
| 2020 | June 2018 20 20
Integrated DE Controls vs Wall / Panel Mounted Drives
Wall Mounted Drives Integrated Controls
Usually, generic drives are used for wall mounting Pump Specific controls & Functions are provided on the Design
Envelope Controls
Additional power wiring from VFD to motor is required. No Additional power wiring is required as the controls are integrated
with the pumping unit.

Additional AC line reactors are required on the power line Built-In DC line reactors removes requirement of AC line reactors.

Wall Mount Wall-mounted drives often do not include RFI filters and must In built RFI filters in compliance to low emission and immunity
VFD
be provided as an extra requirements EN6800-3 to the 1st Environment Class C1 which
limits THD to 35-40%.
When distance between VFD & Motor is lengthy, long No risk due to long standing wave since controls are mounted on the
standing wave can form which increases voltage at motor motor.
terminals causing motor pre-mature failure.

It is often not possible to mount wall drives in the optimum Minimized risk of reflected wave voltage since controls are mounted
location and wiring costs and reflected wave voltage are on the motor.
increased due to longer distances.
Do not have Energy metering capabilities Design Envelope pumps incorporate the ability to record and
cumulate pumping unit energy consumption.

Requires wall space Using Design Envelope pumps with integrated controls means
valuable wall real estate is not used. Equipment can be positioned
closer to the mechanical room perimeter because the walls are kept
clear.

Design
VSC vsEnvelope
ViL | MZ
Armstrong Connect
DCPEnergy
Global | 2023
India
| Summit
OM
| 2020 | June 2018 21 21
Active Performance Management

Active Performance Management is a systems management


approach that optimizes HVAC systems at any stage of a building’s
life-cycle by continually learning from a broad network of
installations and responding to changing HVAC requirements.

The combination of smart commissioning with real-time alerts and


system transparency addresses performance drift and maintains
occupant comfort

 Real-time alarms & notifications.


 Advises changes to system performance
 Predicts failures and potential issues thereby
 Reducing downtime
 Provides Intelligence based maintenance plan.

Design
VSC vsEnvelope
ViL | MZ
Armstrong Connect
DCPEnergy
Global | 2023
India
| Summit
OM
| 2020 | June 2018 22 22
Smart Start-up

Features OEM – CERTIFIED


• OEM-verified, factory-approved start-up SMART START-UP
• Ensures full benefits of built-in Design Envelope
technology
• Reduces operating costs
• Minimizes project risks
• Extends equipment life

Inclusions
• 1-year Pump Manager subscription
• 1-year extended warranty
• Multipoint Check of overall pump operation
• Activation of performance bundles
• Firmware updates
• 7-day comprehensive start-up report
Design
VSC vsEnvelope
ViL | MZ
Armstrong Connect
DCPEnergy
Global | 2023
India
| Summit
OM
| 2020 | June 2018 23 23
Smart Commissioning

Features
OEM – CERTIFIED
• Factory approved procedure performed by Armstrong
SMART Commissioning
certified technicians.
• Leverages the analytics from SMART Start-up
• Ensures system optimization
• Strategies and BAS integration.
• Emphasizes on building readiness pre-handover
• Eliminate the risks of the pump drift

Inclusions
• Access to pump operation analytics to assist in further
commissioning.
• Multi-point check of overall pump operation
• 7-day comprehensive commissioning report
• Operator handover training, including Pump Manager
refresher
Design
VSC vsEnvelope
ViL | MZ Connect
DCPEnergy
| 2023
India
| Summit
OM
| 2020 | June 2018 24
Armstrong Global 24

ACUD DCP with Armstrong Design ENvelopE Vertical INLINE Pumps – With Flow Informs

EMIRATES NBD HEADQUARTERS


Daikin – EMIRATES NBD Daikin – EMIRATES NBD HEADQUARTERS PSPC VS BMS
Comparison Report HEADQUARTERS PSPC VS BMS Comparison Report
PSPC VS BMS Comparison Report

Design
VSC vsEnvelope
ViL | MZ
Armstrong Connect
DCPEnergy
Global | 2023
India
| Summit
OM
| 2020 | June 2018 25 25
Armstrong Vertical Inline pumps

26
Design
VSC vsEnvelope
ViLGlobal
Armstrong
Armstrong | MZ Connect
DCP | 2023
Energy
Global India
| Summit
OM
Summit
Energy | 2020
| 2018
| June 2018 26 26 26
Installed Site Pictures

Design
VSC vsEnvelope
ViLGlobal
Armstrong
Armstrong | MZ Connect
DCP | 2023
Energy
Global India
| Summit
OM
Summit
Energy | 2020
| 2018
| June 2018 27 27 27
Installation Site pictures

Design
VSC vsEnvelope
ViLGlobal
Armstrong
Armstrong | MZ Connect
DCP | 2023
Energy
Global India
| Summit
OM
Summit
Energy | 2020
| 2018
| June 2018 28 28 28
An Integrated Approach to Reducing System Cost Installation
Complexity

Design
VSC vsEnvelope
ViLGlobal
Armstrong
Armstrong | MZ Connect
DCP | 2023
Energy
Global India
| Summit
OM
Summit
Energy | 2020
| 2018
| June 2018 29 29 29
Design
VSC vsEnvelope
ViL | MZ
Armstrong Connect
DCPEnergy
Global | 2023
India
| Summit
OM
| 2020 | June 2018 30 30