SCOPE OF WORK
STRUCTURE ARCHITECTURE
Square Pile 40x40 cm, L Floor Hardener
= 6 s.d 10 m
Piling Works Floor Works
PDA, Lateral, HSPD 240
Guard Raill Steel
Ton test
Pintu Keluar
Kuningan/Mampang (TOL
DALAM KOTA)
Site Area
Jl. Mampa
ng Prapata
Site Area
n Raya
OUT
IN
Site Area
HGB 3
HGB 2 NIB :
NIB : 00657
00658 LUAS :
LUAS : 1.480 M2
1.596 M2
Sumber : jakartasatu.jakarta.go.id
Perhitungan intensitas :
Luas lahan : m2
KDB 55% :
KLB 5.35 :
Jumlah lantai bangunan :
Lahan hijau 20% :
Kesimpulan dari RUTR Pemprov DKI : Di IJINKAN
n raya
l. Gedung Baru g i
m.Public space
ang prapata
n. Awning parkir f
o. Gedung Lama
p. Smoking area
Jalan mamp
q. Kandang burung
r. Kantin
s. Awning Mojul a
t. Awning
u. Awning d
v. Pos satpam
a e
c
b
Jalan mampang prapatan VII SIDE GATE
Project Information Permanent road
Masterplan to be Concreate road
Paving block
LEGEND
a. Kantin s
b. Pos satpam t
u
c. r
CE
EN TR A N
d. Awning parkir
e. Awning parkir p
v GATE
f. Area bengkel n 0
g. Mess j k
q
h. Awning parkir m
i. Awning parkir
h
j. Genzet
k. Awning mobil listrik l
n raya
l. Gedung Baru g i
m.Public space
ang prapata
n. Awning parkir f
o. Gedung Lama
p. Smoking area w
Jalan mamp
q. Kandang burung
r. Kantin
s. Awning Mojul a
t. Awning
u. Awning d
v. Pos satpam
w. Gedung parkir a e
c
b
Jalan mampang prapatan VII SIDE GATE
Moodboard Preference
REFERENSI BIAYA
Rp.3.922.510,- /M2
3 DARI 14
21% 4 0 DARI 4 MILESTONES
SELESAI
14 TUGAS SELESAI
KEMAJUAN KESELURUHAN
971
IDR 9,689,000,000 IDR 0 IDR 9,689,000,000
JAM RENCANA JAM TERPAKAI
100%
100%
DETAIL ENGINEERING
GROUND BREAKING
TEKNIS
BESTEK
MEMO INTERNAL
DENAH TAMPAK
KONSEP DESIGN
PERENCANAAN
AANWIJZING
10%
KONSTRUKSI
SPK
AWARDING
NEGOSIASI
APPROVAL
SITE PLAN
POTONGAN
SOIL TEST
0%
0%
0%
0%
0%
0%
DISTRIBUSI0%
0%
0%
0%
0%
PRPO &0%
0%
0%
TENDER
KLARIFIKASI
DESIGN
BESTEK
10-Nov-23
30-Nov-23
22-Aug-23
11-Sep-23
20-Dec-23
01-Oct-23
21-Oct-23
09-Jan-24
PERENCANAAN, 16-Oct-23
SITE PLAN, 16-Oct-23
KONSEP DESIGN, 17-Oct-23
DENAH TAMPAK POTONGAN, 18-Oct-23
SOIL TEST, 23-Oct-23
DETAIL ENGINEERING DESIGN, 29-Oct-23
OWNER ESTIMATE & BESTEK, 7-Nov-23
APPROVAL, 14-Nov-23
MEMO INTERNAL, 14-Nov-23
TENDER, 23-Nov-23
DISTRIBUSI BESTEK, 23-Nov-23
AANWIJZING, 24-Nov-23
KLARIFIKASI TEKNIS, 7-Dec-23
NEGOSIASI, 10-Dec-23
AWARDING, 16-Dec-23
PRPO & SPK, 23-Dec-23
KONSTRUKSI, 1-Jan-24
GROUND BREAKING, 1-Jan-24
BULAN INI LAPORAN STATUS PROJEK: PARKIRAN TINGKAT BC
4 Le vel 1 0
1
4
Le vel 2 0
Le vel 3 4
0 0
Baru Dimulai Dalam Proses Se le sai
Rendah Se dang Tinggi
Tertunda Dibatalkan LA INNYA
STATUS
5
Le vel 1 0
Le vel 2 0 5
3
Le vel 3 5
0 0
Baru Dimulai Dalam Proses Se le sai
Rendah Se dang Tinggi
Tertunda Dibatalkan LA INNYA
Catatan :
Tulis catatan penting di sini saat Anda ingin mencetak.
Tulis catatan penting di sini saat Anda ingin mencetak.
Tulis catatan penting di sini saat Anda ingin mencetak.
Tulis catatan penting di sini saat Anda ingin mencetak.
Tulis catatan penting di sini saat Anda ingin mencetak.
Tulis catatan penting di sini saat Anda ingin mencetak.
Tahap 2
Kapasitas daya
tamping…Mobil
M
U KA S
A RE L U
K
A RE L U
K
U KA S
M
Tahap 1
Kapasitas
daya tampung
76
Mobil/lantai
K
A RE L U
U KA S
M
R
KELUA
MASU
K
GROUND FL.
1 FL.
2 FL.
Armatur 84 Titik/lantai
TERIMA KASIH