Professional Documents
Culture Documents
6 Sigma - Good Presentation
6 Sigma - Good Presentation
Introduction
Motorola
Motorola
the
the company
company that
that invented
invented Six
Six Sigma
Sigma
• The term “Six Sigma” was coined by Bill Smith, an engineer
• 1987 - Motorola officially launched it’s Six Sigma program
GE
GE
the
the company
company that
that perfected
perfected Six
Six Sigma
Sigma
--Backbone
Backboneof ofSix
SixSigma
SigmaOrg
Org
Black Belt Black Belt
--Full
Fulltime
timeresource
resource
--Deployed
Deployedto tocomplex
complexor
or“high
“high
risk”
risk”projects
projects
Green Belt
Green Belt
--Part
Parttime
timeor
orfull
fulltime
timeresource
resource
--Deployed
Deployedto toless
lesscomplex
complexprojects
projects
Green Belt
ininareas
areasof
offunctional
functionalexpertise
expertise
I
Critical milestones and stakeholder review
D
Improve
C
Control Budget allocation
• The term “sigma” is used to designate the distribution or spread about
the mean (average) of any process or procedure.(standard deviation)
• Sigma , is mainly an indication for variability in a certain process
• ,then for any process as sigma value increase ,the process variability
increase then process quality level gets worst.
66
• Is an overall methodology that drives business
improvement
• Business improvement , including any business
process regarding product or service.
Defects Defects
Acceptable
(Yield)
Mean
Process Capability
© All Rights Reserved TreQna 2005
Graphical View of Six Sigma (follow)
LSL -3 USL 3
Defects Defects
Acceptable
(Yield)
Mean
© All Rights Reserved TreQna 2005
Sigma Conversion Table:
1-DPMO
1-DPMO
2-Final
2-Final Yield
Yield
1-
2- Final Yield : is the percentage of units that pass through an operation
without any defects.(1-%defected)
• Then, by referring to six sigma conversion tables , for each DPMO OR
YIELD we can get the equivalent sigma level.
Identify
Identify project
project
Matrix diagram
Pareto
OUTPUT Project Charter
WBS
SIPOC
© All Rights Reserved TreQna 2005
Matrix
Matrix Diagram
Diagram
project Reflects Prob
Team
Financ Data Benefit a Resista Cost to Time to abilit
members Tot
criteria ial availabil to chronic nce to implem implem y of
commitmen al
benefit ity custom proble change ent ent succ
t
er m ess
Control
plan ∆ ○ ○ ○ ○ ○ ○ ∆ .
29
FTT ∆ ∆ ∆ ∆ ○ ∆ ○ ○ ○ 17
Scrap
. . . . ∆ ○ ∆ ○ . 53
Total 11 13 13 13 7 7 7 7 21 99
D E F I N E
D
Define
Measure
. In this phase the goal is to detect the
M
location or source of the problem as precisely
Measure as possible by building a factual
A
understanding of existing process conditions
Analyze and problems.
M
the important function of the MEASURE
I phase is to establish a baseline of capability
Improve
level .
C
Control
M
Measure
© All Rights Reserved TreQna 2005
1 / Data collection plan:
Data Collection - In planning for data collection it is
important to:
· Be able to identify possible measures.
· Know how to select the most important variables to measure.
· Know how to create a data collection plan.
· Be able to identify stratification factors for a given problem.
· Know the various types of data available.
· Be able to create and use operational definitions.
· Be able to create a useful data collection form, whether variable or
attribute.
Desired data characteristics need to be:
· Sufficient
· Relevant
· Representative
M
Measure
© All Rights Reserved TreQna 2005
Forms
Data collection plan Project name & scope :
What the questions do you want to answer ?
y Attribute
Yes
end
© All Rights Reserved TreQna 2005
2/ Sampling :
M
Measure
© All Rights Reserved TreQna 2005
The Factors:
· Type of data ?
Variable (discrete or continuous) & Attribute ( discrete )
· What you want to do with the data?
describe a characteristic for a whole group (mean or
proportion) within a certain precision of +/- number of units?
snaping I I I I I I I I I I I I I I I I I I 18
holes I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 38
LEAKAGE I I I I I I I I I I I I 12
crack I I I I I I I I I I I I I I I 15
deformation I I I I 4
bad regulator I I I I I I I I I I I I I I I I I I I I I I 22
bad voltage I I I I I I 6
M
© All Rights Reserved TreQna 2005
Measure
b/ variable : Check sheet
Product Name_________________________________ Date_________________________________
Factory_______________________________
Specification__________________________________
2.2 +/- .5 Section Name__________________________
No. of Inspections______________________________
100 Data Collector__________________________
Total Number__________________________________
100 Group Name___________________________
Lot Number___________________________________
1631 Remarks:_____________________________
Dime nsions 1.5 1.6 1.7 1.8 1.9 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 3.0 3.1 3.2
SpecUSL
SpecLSL
40
35
30
25
XXXXX
XXXX
20
XX
XX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
15 X X
XXX
XXX
XX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
10
XXX
XX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
XXXXX
5 X
XX
XX
0 X X
TOTAL
FREQUENCY 1 2 7 13 10 16 19 17 12 16 20 17 13 8 5 6 2 1
M
Measure
© All Rights Reserved TreQna 2005
When to use a prioritization matrix?
1. There are too many variables that might have an impact on the
output of the process.
2. Collecting data about all possible variables would cost too much
time and money.
3. · Team members have different theories about what happens in
the process
inputs
y1 y2 y3
X1 1 1 7 =10+4+70
x2 10 10 4 =100+40+40
2 2 2
σ ( total) = σ ( product) + σ ( MSA)
M
Measure
© All Rights Reserved TreQna 2005
The method consists of:
· Multiple operators measuring multiple
units a multiple number of times. The
AIAG standard Gage R&R format is for
three operators to measure ten parts, ten
times individually.
2 2 2
σ ( MSA) = σ ( repeatability ) + σ ( reproducibility )
M
© All Rights Reserved TreQna 2005
Measure
Why use a run chart?
· To study observed data for trends or patterns over a specified period of time
· To focus attention on vital changes in the process.
· To track useful information for predicting trends or patterns.
M
Measure Baseline current process capability
A
Analyze
Define statistical improvement goal
I
Improve
C
Control Identify drivers of variation (significant factors) A
© All Rights Reserved TreQna 2005
Analyze
• Purpose:
– To make sense of all the data gathered in the Measure
phase and to use that data to discover areas of delay, waste
and poor quality, high costs
– To identify and verify the ‘root cause’ of a problem
• A brainstorming tool that helps define and display major causes, sub causes and
root causes that influence a process
Primary Cause
Secondary Cause
Backbone Problem
Root Cause
A
© All Rights Reserved TreQna 2005
Analyze – Identify Drivers of Variation
Control – Impact Matrix
• A visual tool that helps in separating the vital few from the trivial many
Control
Cost Ineffective
High Control – Low Impact
Trivial Many
Low Control – Low Impact A
© All Rights Reserved TreQna 2005
Analyze – Identify Drivers of Variation
Pareto Chart
A
0 0%
L K A F B C G R D
A
© All Rights Reserved TreQna 2005
Analyze – Identify Drivers of Variation
Hypothesis Testing
Chi-Square Regression
A
© All Rights Reserved TreQna 2005
Improve
D Evaluate Alternatives
Define
Prove effectiveness
I
Improve
C
Control
Implement
I
© All Rights Reserved TreQna 2005
Improve
Evaluate Alternatives
Remedy selection matrix
I
© All Rights Reserved TreQna 2005
Improve
The most common used criteria ,
•Total cost
•Impact on the problem
•Benefit/cost relationship
•Cultural impact / Resistance to change
•Health, safety and environment
6 9 9 10 9 43
Outsource training(esteves)
To
7 7 5 6 6 31
Elimin- Extend no. of working hours
ate
dies
8 8 9 9 9 43
defects Assign new technicians
Assign resources for die shop
6 7 10 10 9 42
buy additional repair device
outsource maintenance 7 8 10 10 9 44
Dies maintenance plan
for old dies
Implement
D
Ensure measurement system reliability for
Define significant factors
- Is tool used to measure the input / process variables flawed ?
- Do all operators interpret the tool reading in the same way ?
M
Measure
Improved process capability
A
Analyze
I
Improve Sustenance Plan
C
Control
- Statistical Process Control
- Mistake Proofing
- Control Plan
C
© All Rights Reserved TreQna 2005
Control
• The purpose of this phase is to sustain and control
future process performance
• What Statistical Process Control (SPC) tools will be used to monitor the process
performance ?
• Who will review the performance of the output variable and significant factors
on closure of the project and how frequently ?
• What is the corrective action or reaction plan if any of the factors were to be
out of control ?
C
© All Rights Reserved TreQna 2005
Six
Six Sigma
Sigma Organization
Organization
Driven by
customer
needs
Process Map Analysis
LSL US
L
Methodology
Led by
Senior
Mgmt
••••••••••
Upper/Lower
specification
• •
••• •
•
•••••••
••••••
limits
Organization Tools
•
Regression
35 100%
30
80%
25
20 60%
15 40%
10
20%
5
Process variation 0 0%
Enabled by quality
L K A F B C G R D
team.
Frequency Cumulative Frequency
Pareto Chart
--Backbone
Backboneof ofSix
SixSigma
SigmaOrg
Org
Black Belt Black Belt
--Full
Fulltime
timeresource
resource
--Deployed
Deployedto tocomplex
complexor
or“high
“high
risk”
risk”projects
projects
Green Belt
Green Belt
--Part
Parttime
timeor
orfull
fulltime
timeresource
resource
--Deployed
Deployedto toless
lesscomplex
complexprojects
projects
Green Belt
ininareas
areasof
offunctional
functionalexpertise
expertise