Stop Work Authority Campaign

You might also like

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 9

EDC Chairman Message

What is Stop Work Authority?

SWA Remember STOP


• Is a program • when you think, "I
designed to shouldn't tell
provide someone what to
employees and do," or "I'm sure
contractors with they know what
the responsibility they're doing, who
and obligation to am I to tell them
stop work when a to stop?" You
perceived unsafe could be saving
condition or their life by
behavior may speaking up and
result in an using your Stop
unwanted event Work Authority.
When should I implement my Stop Work Authority?

Stop Work Authority may include, but isn’t limited to the following:

Lack of competency • Knowledge, ability, training and experience

• Engine room alarms, kick, fire, H2S, LEL, drills, or other


Alarms alarms.

• Spill, leaks, combustible materials, high pressure release,


Emergency situation or other aspects.

Changes to scope of work • Deviations in tools/ equipment functions, crew shift,


or work plan responsibilities, or other aspects.

• Weather, lighting, ventilation, humidity and welfare


Change in conditions facilities.

• Poor housekeeping, defective tools/ equipment, or other


Unsafe conditions aspects.

• PPE not used, equipment used incorrectly, procedures not


Unsafe act followed or other aspects.
How is Stop Work Authority used or implemented?

Correct Resume Follow-Up


STOP Notify Investigate
You are Don’t try to Affected Modifications Notify all Promptly
obligated to correct personnel will to the affected affected review all stop
stop work everything discuss the area(s) will be personnel work cases to
immediately yourself. situation and made about identify any
when Notify your come to an according to corrective need for
colleagues, supervisor and agreement on the corrections actions to additional
equipment, or any other the stop work outlined in the prevent similar investigation or
the organizations, action. SOS Form. issues from follow-up.
environment as required. occurring.
are at risk.
EDC Commitment

Training Retribution
The importance of initial and
Tracking
It must also be noted that no
ongoing training should not be Tracking SWA occurrences retribution will follow a stop
underestimated. Implementing a helps with the evaluation of the work action initiated in good
Stop Work Authority Program effectiveness of the program and faith even if it is deemed
that is understood by all identifies areas for unnecessary. Personnel must not
personnel is paramount to improvement. feel apprehensive to act on their
ensuring success. obligation to initiate a stop work
action.
Roles and Responsibilities

Top Management Supervisors& Managers HSE Department


-Create a culture that promotes SWA. -Promote a culture where SWA is -Provide training, support, Employees& contractors:
-Establish clear expectations and freely exercised, SWA requests are
honored and resolved before resuming documentation& monitors compliance -Initiate stop work (in good faith) and
responsibilities. of the SWA program.
operations. support stop work initiated by others.
-Demonstrate support for using SWA -Conduct weekly SWA drill.
without retribution. -Ensure necessary stop work follow- -Participate in SWA drills.
up is completed. -Supporters& FHSE shall participate
-Hold employees and contractors in SWA drills& collect raised SWA
accountable for full compliance with -Participate in SWA drills& collect cases during visits.
the SWA program. raised SWA cases during visits.
-Supporters& FHSE shall resolve
-Resolve SWA conflicts when they SWA conflicts when they arise.
arise.
Business Units “Rigs, Yards, Workshops& warehouses” Activities

Perform a daily
Discuss the new Send a daily
SWA drill for 30
SWA policy with complete SWA The best response
days with the
the crews and all drill report (form) from the
crews according
3rd parties to evaluate the participants will
to the scenarios
personnel on your response of the be rewarded.
that you will
work place. crew.
receive daily.
Reference: OSHA’s Voluntary Protection Programs (VPP).

You might also like