The Need to Scale, Scale, Scale

The data and information challenge

 The world had 486 exabytes of


data in 2008; doubles every 18
months
 Unstructured data is growing at
10x the rate of structured data
 Management and governance of
data needed for 10, 20, 100
years, forever?
 Managing storage tiers is too
costly to meet application SLAs
 Repurpose data every 4 to 5
years? Repurpose billions,
trillions of objects?
 24 x 7 operation drives up cost
of storage end of life
replacement and migration
2
The Need for Data Center Transformation

Spendin $300 Power and cooling costs


g HW mgmt. and admin costs
(US$B) $250
New hardware spending
$200

$150

$100

$50

$0
199619971998199920002001200220032004200520062007200820092010

 IT costs are increasing due to operational costs not hardware cos


 Aging IT infrastructures create an increasing burden to maintain
 Change becomes increasingly more disruptive as volumes increas
 Lack of data center agility increase business risk and missed
opportunities
 Data center transformation must address operational costs
3
The Transformation of Servers

 Processor technology is scaling


up
• New Intel architecture

 Virtual servers and hypervisors


• Multiple virtual machines (VMs)
• Multiple VM I/O streams

 Network bandwidth is increasing


• FC 4Gbs going to 8Gbs
• FCoE 10Gbs to 40Gbs to 100Gbs
 Virtual servers are transforming
the data centers: consolidation
of servers with load balancing
and remote recovery

Scale-up storage is required to support virtual server transformation


4
An Agile IT Infrastructure to Transform the Data Center

 Support non-disruptive operations


and always-on business
 Leverage existing investments
longer
 Reduce operational costs without

added complexity
 Increase storage asset utilization
and efficiency
 React to changing business
requirements through
redeployment
of services

5
Introducing Hitachi Virtual Storage Platform

3D

The only 3D The only storage With unique Hitachi


scaling storage architecture that Command Suite
platform for all flexibly adapts to the management
data performance and capabilities, it
capacity requirements transforms the data
of the virtual data center
center
6
Introducing Hitachi Virtual Storage Platform

Industry’s Most External


Highest 3D Virtualized
Performance Capacity
Only 3D scaling

40% Higher 15x Larger


Density Volume Size

Automated
Twice the
Dynamic
Connectivity
New Tiering
Septemb
er 2010
48% Less VMware VAAI
Power Integration

7
•Introducing 3D Scaling

 Scale Up to meet increasing demands


 Dynamically add processors,
connectivity, capacity in a single unit.
 Scale performance with added resources

 Scale Out to meet multiple demands


 Dynamically combine multiple units into
a single logical system with shared
resources.
 Support the needs of different servers by
prioritizing and provisioning their storage
requirements from a common pool of
storage resources
 Provide safe multitenancy and quality of
service (QoS) for multiple applications
which share the same storage
virtualization or cloud infrastructure

 Scale Deep to extend value


 Dynamically virtualize new and existing
8 external storage systems
Hitachi Dynamic Provisioning

 Virtualize devices into HDP Volume


(Virtual LUN)
pool
 Provision servers in
seconds HDP Pool

 Eliminate waste LDEVs


•LDEV
•LDEV •LDEV
•LDEV •LDEV •LDEV
•LDEV •LDEV

allocating pages only as


used
•120

•Response Time (ms)


 Extend to external •100

•80

storage •60

•40
•716% more transactions
•20
 Convert fat volumes to •0
•0 •1,000 •2,000 •3,000 •4,000 •5,000 •6,000 •7,000

thin
•Transactions (IOPS)

•Single LDEV •Windows LVM •HDP Pool

 Optimize storage
9
Page Level Tiering

POOL A
 Different tiers of storage EFD/Flash
TIER 0
are now in one pool of
pages
Last Referenced
TIER
SAS 1

 Data is written to the


highest performance tier
first Last Referenced
TIER 2
SATA

 Less active data


migrates to lower level
tiers

 If activity increases it
will be promoted back to
a higher tier
10

Virtual Storage Platform Physical Description

 Control chassis
• Virtual storage
directors
• FC, FCoE, FICON

• 1TB cache

 Drive chassis
• 2.5” or 3.5” drives

• Flash, SAS, SATA

• Up to 2,048 drives

 Hitachi 19” rack


• Front to back cooling

• Up to 6 racks

11
Hitachi Command Suite v7

 3D management

 Scalable to 5+
million objects

 Consolidated data
base

 Simplified
provisioning

 Application and
business
transparency

 Integration with
VMware VAAI
12
3D Management: Manage Up

Unified management scales for the largest infrastructure and application deployments

13
3D Management: Manage Out

Solution Capabilities
Single management
Application
 Unified management for all data
Database
framework with the  Common management of storage
OS
breadth to manage assets
HBA Driver
 End–to-end visibility
storage, servers and the
 Applications, virtual machines,
IT infrastructure
virtual servers, and logical
storage devices
 Roadmap to orchestration layer

Business Value
 Properly monitor and plan virtual
servers
 Consolidate multivendor storage
management
14
 Lowers complexity and costs
3D Management: Manage Deep

One Platform for All Data


Unified, integrated storage
family for all block, file
and content data Unified Management

The only 3D scaling storage Structured Unstructured Semi-structured Rich Media


architecture for all data types
Increase performance and
lower cost by automating
data placement Virtualized
Infrastructure
Best-in-class NAS
performance and scalability
Distributed object storage
for active archiving,
regulatory compliance,
content compression, de-
15duplication, backup reduction
Use Case: Enabling Cloud Deployments

Private Public Facilitate and


Cloud Cloud
optimize cloud
Hybrid
Cloud deployments:
3D scaling for large,
Hitachi dynamic, cost effective
Unified
Hitachi
Hitachi
3rd
deployment
Comput Conten
e
NAS
t
Party Consolidate storage
Platfor Gatewa
Platfor
m
Platfor
y assets
m m
Enable safe
multitenancy and
Hitachi Virtual Storage Platform quality of service
Provide business level
Hitachi reporting and
Legacy Adaptabl
Storage e
Tier 3 or transparency
3rd party
Platform Modular Maintain high
Storage
16
availability, security,
Benefits Summary

Reliable Dynamic Open

 Heritage of market-  Easily adapts to  Supports the


leading innovations changing largest variety of
 Consistently scale requirements OS and data types
performance  Automates data  Heterogeneous
without interruption tiering support for server
 Best in class data  Scale up, scale out virtualization
integrity and 100% and scale deep  Mainframes and
data availability  The foundation for a open systems
guarantee highly virtualized  Allows customers
 Simple storage to further reduce
management from infrastructure OPEX
first last resource  Uses resources  Hitachi Command
 Proven services only as needed and Suite aligns
organization and reclaims them infrastructure to
network of partners when no longer in meet application
use needs
17
Application-centric View: Partner Solutions and
Services

 Solutions with Strategic Partners


• Microsoft Windows Server Hyper-V, Exchange, SharePoint
• Oracle Database 10g Enterprise Edition
• SAP ERP
• VMware vSphere and vStorage API for Array Integration

 Services
• New Transformation Services
• Optimize virtualized, tiered architectures to more tightly
align to business objectives

18
Services Maximize Value of the Virtual Storage
Platform

 Transform organization to become virtualized and cloud ready


 Accelerate adoption of new technology, realization of benefits
 Minimize disruption to business when migrating to a new
architecture
 Establish efficient storage management organization, process
and technologies
 Lower risk and cost in transition
 Provide peace of mind with complete customer care
19
Transform Your Data Center and
Realize the Value of Your Investment

Assess and Consult


Align to business
Data classification
Transformation services Identify business risk

Plan and Design Increase agility


Tiered storage planning and Lower risk by matching
design requirements to design
Migration planning
Optimize design to
customer
Install, Implement, Transition
Storage virtualization and tiering
management Minimize disruption
Migration services Seamless transition to new
environment
Manage and Optimize
 Remote storage
management Optimize operations budgets
Support Offload day-to-day
 Select Care administration
Customized customer care

20
OPTIONAL SLIDES

Optional Slides
New Technologies Effects

Efficiency, efficiency, efficiency

Power efficiency Lower KVA/sq. ft. Modular architecture, low power memory, 2.5”drive,
solid state drives, flash protected cache (minimal
batteries), fan and hard disk drive power control

Capacity efficiency Higher utilization Dynamic provisioning, hierarchical tiers

Operational Easier to use, configure, Improved GUI, command line interface, automation
efficiency optimize, lower TCO policies

23
For the 20 Years, Our Services Expertise Has
Been Helping Customers around the World

Focused storage technology subject


matter expertise
 Focus on advanced storage
technologies – leader in
virtualization and thin provisioning
 Industry leadership in business
continuity
Proven methodologies
 Thousands of successful
engagements
 High customer satisfaction ratings
Flexible, collaborative approach
 Leverage onsite and remote
resources
 Adjust to customer requirements
Experienced consultants
 With up to 20 years experience
24
designing and implementing
Hitachi Data Systems Global Services Organization
Delivers Total Customer Care

Services to ensure success with •Experts to customize, transition, •Any problem, anytime,
new technology adoption, manage and optimize your anywhere, fast, consistent
accelerate ROI and lower risks environment and transparent support

People Process Portfolio

25
End-to-end Services to Transform Your
Environment

Strategic Services Transition and Manage, Optimize


Integration and Support
 Transformation Services  Virtualization and  Remote Storage
 Data Classification Tiered Storage Management Services
 Storage Economics Planning and Design  Select Care
 Migration Services
 Performance
Management
 Business Continuity
 Data Eradication

Enabled through
Hitachi Data Systems Global Services Methodology

26

You might also like